| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 Cr+₹18.3 L (6.66%)Accepted-AOC | ₹2.9 Cr+₹18.3 L (6.66%) | L2 | Accepted-AOC NOT L1 |
| 3 | L3₹3.0 Cr+₹25.3 L (9.16%)Accepted-AOC | ₹3.0 Cr+₹25.3 L (9.16%) | L3 | Accepted-AOC NOT L1 |
| 4 | L4₹3.4 Cr+₹68.5 L (24.9%)Accepted-AOC | ₹3.4 Cr+₹68.5 L (24.9%) | L4 | Accepted-AOC NOT L1 |
| 5 | L5₹3.4 Cr+₹79.4 L (28.8%)Accepted-AOC | ₹3.4 Cr+₹79.4 L (28.8%) Quoted ₹3.6 Cr | L5 | Accepted-AOC NOT L1 |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
11 Jan 2019, 6:00 pmClosed
AGME(C),AAI,Vijayawada
AGM (E-C), AAI, Vijayawada
Construction of Operational Boundary wall at Kadapa Airport
2018_AAI_19268_1
AAI/VIJ/ ENGG(C)/GM(P)/Kadapa/2018
Open Tender
Civil Works
Works
270 days
Kadapa
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
AAI
₹7.8 L
23 Jan 2020
25 Dec 2018
18 Jan 2019
26 Dec 2018
11 Jan 2019
26 Dec 2018
26 Dec 2018 - 10 Jan 2019
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual meansin foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including gettingout the excavated soil and disposal of surplus excavated soil as directed, within alead of 50 m. All Kinds of soil
Supplying and filling in plinth/foundations with river sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars
Centering and shuttering including strutting,propping etc. and removal of form for Foundations, footing bases of columns,etc. For mass concrete
Centering and shuttering including strutting,propping etc. and removal of form for Lintels,beams,plinth beams ,griders,bressumers and cantilevers
Centering and shuttering including strutting,propping etc. and removal of form for Columns,pillers,piers, Abuments,posts and struts
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). (a) All works upto plinth level:
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works above plinth level
Brick work with clay flyash ash brick conforming to the Technical Specification, class designation 5 average compressive strength in foundation and plinth in cement mortor 1:6 (1 cement : 6 coarse sand)
Brick work with clay flyash F.P.S. (non modular) brick of class designation 5 in superstructure above plinth level up to floor five level in : cement mortor 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : (a) 1:6 (1 cement: 6 coarse sand)
Finishing walls with water proofing cement paint of required shade : (a)New work (Two or more coats applied @ 3.84 kg/10 sqm)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 50x50x6mm thick Y-Angle
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (a) Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Providing and fixing Zinc coated concertina coil fencing with punched tape concertina coil 450 mm dia 10 metre openable length (total length 90m) having 50 no rounds per 5 metre length upto 3m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m aoart abd with 9 horizantal R.B.T reinforced barbed wire, stud tied with G.I. staples and G.I Clips to retain horizonatal, including necessary bolts, all complete as per direction of Engineer-in-charge, wiht reinforced barbed tape (R.B.T)/spring core (2.5 mm thick ) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/metre (cost of M.S angle, C.C blocks shall be paid separately)
Providing and fixing PVC pipe (4 kg per sqcm) of approved brand make 100 mm dia in brickwork for reducing the wind pressure as per the direction of Engineer in charge.
VSR CONSTRUCTIONS
ESHYAN INFRATECH
SRI RADHA CONSTRUCTIONS
SIDDARTHA CONSTRUCTIONS
Garg Associates
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .