| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹18.1 L+₹35,976.09 (2.03%)Rejected-Finance | L2 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | VGM CONSTRUCTIONS L2 | M Arsath kan L1 |
|---|---|---|---|---|---|
| 1.00 | CONSTRUCTION OF NEW OHT 30000 LIT AT KODAMBARAI IN VALANADU PANCHAYAT.Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B First depth | 38.88 | cum | 269.06 ₹10,461.05 | 263 ₹10,225.44 Lowest |
| 2.00 | II nd depth | 6.78 | cum | 416.32 ₹2,822.65 | 408 ₹2,766.24 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling M-sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 2.09 | cum | 1,833.38 ₹3,831.76 | 1,797 ₹3,755.73 Lowest |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 3.3 | cum | 5,549.24 ₹18,312.49 | 5,440 ₹17,952 Lowest |
| 5.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification | 4.23 | Mt | 93,783.59 ₹3,97,079.72 | 91,944 ₹3,89,290.9 Lowest |
| 6.00 | Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs Below GL | 7.4 | cum | 9,369.01 ₹69,330.67 | 9,185 ₹67,969 Lowest |
| 7.00 | For Items 0m to 4.50m Above GL | 2.83 | cum | 9,512.9 ₹26,921.51 | 9,326 ₹26,392.58 Lowest |
| 8.00 | For Items 4.51m to 10.98m Above GL | 4.76 | cum | 9,796.35 ₹46,630.63 | 9,604 ₹45,715.04 Lowest |
| 9.00 | For Items 10.98m to 14.93m Above GL | 14.44 | cum | 10,079.79 ₹1,45,552.17 | 9,882 ₹1,42,696.08 Lowest |
| 10.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 19.93 | Sqm | 1,116.9 ₹22,259.82 | 1,095 ₹21,823.35 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
2 Mar 2026, 3:00 pmClosed
BDO Marungapuri
BDO
CONSTRUCTION OF NEW OHT 30000 LIT AT KODAMPARAI IN VALANADU PANCHAYAT -CFC Savings Fund - 2025-2026
2026_RDTN_668019_1
B3/0432/2026
Open Tender
Civil Works
Item Rate
BDO Marungapuri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
Yes
28 Mar 2026
27 Feb 2026
2 Mar 2026
27 Feb 2026
2 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF NEW OHT 30000 LIT AT KODAMBARAI IN VALANADU PANCHAYAT.Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B First depth | 38.88 | cum | - | - |
| 2 | II nd depth | 6.78 | cum | - | - |
| 3 | Supplying and Filling foundation and basement with filling M-sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 2.09 | cum | - | - |
| 4 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 3.3 | cum | - | - |
| 5 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification | 4.23 | Mt | - | - |
| 6 | Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs Below GL | 7.4 | cum | - | - |
| 7 | For Items 0m to 4.50m Above GL | 2.83 | cum | - | - |
| 8 | For Items 4.51m to 10.98m Above GL | 4.76 | cum | - | - |
| 9 | For Items 10.98m to 14.93m Above GL | 14.44 | cum | - | - |
| 10 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 19.93 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_2.pdf
PDF • 0.49 MB
Tendernotice_3.pdf
PDF • 0.45 MB
BOQ_802619.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .