Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹83.9 L
EMD Value
₹84,000
Closing Date
30 Nov 2026, 6:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, panchayat, R & B Division, Surat.
Notified Yojna 2026-27 Providing Storm water drainage line on both sides of road at Juna-Kavas At Village Kavas Ta. Choryasi Dist. Surat
367447
11 OF 2026-27
Open
Civil Works - Others
Works
Surat
5 documents required · 5 mandatory
₹2,400
Executive Engineer, panchayat R & B Division, surat
₹84,000
19 Nov 2026
19 Nov 2026
19 Nov 2026
30 Nov 2026
19 Nov 2026
180 days
Name of work :- Providing Storm water drainage line on both sides of road at Juna-Kavas At
Village Kavas Ta. Choryasi Dist. Surat
: : BILL OF QUANTITY : :
Estimated Total amount
Estimated Total amount
Sr. No. Item of work Unit
Quantity Rate according to
1 Carry out Topographical Level Survey with Total Station, 1.00 Job 18382.00
Soil Investigation, Detailed Survey Work, Preparation of
Construction Drawings with Level, Longitudinal
Sections,cross sections, etc complete for Drainage line
Network. Both Side TBM Markings on Site on Permenant
Structure, as per the requirement and getting approval of
the same from Executive Engineer & submitting the
drawings in both hard and soft copy.
2 Excavation for foundation upto 1.5 m depth including sorting 2478.00 Cum 122.94
out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
3 Providing and laying cement concrete 1:3:6 (I-Cement : 3- 241.05 Cum 3095.25
coarse sand : 6- hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
4 Lowering,laying and jointing R.C.C Pipes in C.M 1:1 1/2 Of 1652.00 Rmt 172.71
following diameter in proper position, grade and alignment
at all level as directed by Engineer In charge including
conveyance from stores to site of work ,labour,giving
hydraulic testing as per ISI Code. (a) NP3 dia 450 mm
5 Providing and supplying ISI Standard R.C.C. pipes(of 1652.00 Rmt 1374.61
Sulphate Resisting Cement) in standard lengths of following
class and diameter suitable for either collar joints or rubber
ring joints including all taxes, insurance, transportation,
freight charges,n octroi, inspection charges, loading,
unloading, conveyance to departmental stores, stacking
etc. Note : One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates below.
One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (C) 450 mm dia
Class NP3 Test Pressure 0.7 Kg/sq. cm. Internal Diameter
6 Refilling the pipeline trenches with selected soil incl. 1137.00 Cum 176.75
ramming, watering, consolidating disposal of surplus stuff
as directed within a radius of 3 km. Refilling as directed
7 Dewatering in all sorts of soil murrum,hard murrum and 382.80 Cum 17.17
boulders, soft rocks,hard rocks, upto 1.50 mtr Depth From
Estimated Total amount
Estimated Total amount
Sr. No. Item of work Unit
Quantity Rate according to
8 Add or Deduct Extra Depth beyond 1.50 mtr As per on site 18.00 Rmt 4841.94
situation. Construction of brick masonary (fly ash
/convetional) circular chamber avg. 1.0 mt deep As per the
drawings provided by Engineer in charge provided with
SFRC precast perforated cover also providing in side and
outside plastering of CM 1:3 etc.complete as per the
drawings provided.
9 Construction of brick masonary circular chamber (fly ash 60.00 Nos. 10019.20
/convetional) avg. 1.5 mt deep As per the drawings
provided by Engineer in charge provided with preecast
R.C.C perforated cover also providing in side and outside
plastering of CM 1:3 etc.complete as per the drawings
provided.Add or Deduct As per on site situation.
10 Consructing of granular sub-base Gr-II by providing Blast 672.54 Cum 820.03
furnance Steel Slag as aggregate and Fine aggregate
machine crushed stone aggregate satisfying MOST
specification of grading II including spreading in uniform
layer with motor grader on prepared surface, mixing by mix
in place method with rotavator at OMC and compacting with
vibratory roller to achieve the desired density etc. complete.
11 Providing and laying cement concrete 1:2:4 (1- Cement : 2- 261.96 Cum 3741.69
Coarse sand : 4- graded stone aggregates 20 mm nominal
size) and curing complete excluding cost Of formwork in (A)
Foundation and Plinth
12 Providing and fixing pre-cast Rubber Dye / steel Dye inter 2137.80 Sqmt 706.93
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as
per approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and filling the joint
with sand in proper line and level as per guidlines of IRC :
SP 63-2018 etc. Complete.
Estimated Total amount
Estimated Total amount
Sr. No. Item of work Unit
Quantity Rate according to
13 Providing and fixing pre-cast concrete kerb stone of gray 1477.00 Rmt 562.37
cement based concrete block 30cm length,60cm height and
15cm thick of M250 grade concrete as per approved design
& as specified and approved by Engineer In Charge and
including excavation for fixing in proper line and level,filling
the joint with C:M 1:3 (1cement:3fine sand) etc complete.
Rs. Eighty Three Lakh Ninty Four Thousand Seven Hundred Total Rs.
Twenty Five and Eighty Five Paise Only
I/We am/are willing to carry out the work at ………………………………………………..% above/below (percent should be written in
figures and words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
*Estimated amount *Estimated amount
Put to tender Rs 8394725.85 Put to tender
Deduct ……. % below Rs……………………..…. Add ……. % Above Rs…………..….
Net Rs. …………………….… Total Rs. ………….…
*( please strike out whichever is not applicable)
Note :- 1 All works shall be carried out as public works department Handbook and other
specification of Division or as directed.
Note :- 2 All the columns in schedule should be filled in ink or ballpen and the total of the
entries in last column should be struck by the contractor under his signature.
Note :- 3 Rate quated include clearance of site (Prior commencement of work and at its close)
in all respects and hold good for work under all conditions,site moisture, weather etc.
Note :- 4 To be continued on additional sheet,if found necessary.
Signature of the contractor
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B) Sub Division Panchayat ( R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
7. SPECIAL ATTENTION TO TENDERER.pdf
9_TSeh.pdf
BOQ.pdf
Draft Letter_27-4.pdf
SBD Gutter.pdf
3. SBD GR_11zon.pdf
GR Performance security_4.5.26.PDF
GR SBD PBMC OPRC 14.10.26.PDF
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .