Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹44.6 L
EMD Value
₹45,000
Closing Date
25 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat Road and Building Division, Morbi
Paverpatta on Jivapar Chakampar Road km 0/00 to 2/500 Taluka. Morbi Dist. Morbi (Selected Length) (Under CR Grant)
363661
89/2026
Open
Civil - All
Works
Morbi
9 documents required · 9 mandatory
₹1,500
Executive Engineer, Panchayat Road and Building Division, MORBI
₹45,000
5 Nov 2026
5 Nov 2026
5 Nov 2026
25 Nov 2026
5 Nov 2026
120 days
BILL OF QUANTITY
Memorandum showing items of works to be carried out
Item Discription of Item (With Brief Specification and reference Rate In
Quantity Unit Amount
No.. to book of Specification) Figures
1 Clearing and Grubbing road length including uprooting wild 0.80 Hect 28455.10
vegetation, grass bushes, shrubs, saplings and trees girth up to
300 mm removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable materials
to be use of ouctioned upto a lead of 1000 Mt. including
removal and disposal of top organic soil not exceeding 150mm
in thickness.( C ) By Mechanical means in area of light Jungle.
2 Scarifying Gavelled macadam or Bitumen macadam surface 6 450.00 Sqm 39.63
cm to 10 cm depth including stacking useful materials on road
side and disposing of remaing stuff.
3 Box cutting the road surface to proper slope and camber 116.00 Cum 187.37
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto all lead.
4 Providing, laying, spreading, rolling, watering & consolidation to 809.38 Cum 631.25
desired density of Quarry Spall with all lead
5 Providing, laying, spreading and compacting stone aggregates 272.00 Cum 1376.63
of 40 to 63 mm sizes with all lead to water bound macadam
(W.B.M) specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100 kN in
stages to proper grade and camber, applying and brooming,
stone screening/binding materials to fill-up the interstices of
coarse aggregate, watering and compacting to the required
density grading as per Technical Specification Clause 405. By
Machinary Means.
6 Dry Lean Cement Concrete Sub base (Construction of dry lean 58.00 Cum 2607.42
cement concrete Sub- base over a prepared subgrade with
coarse and fine aggregate conforming to IS: 383, the size of
coarse aggregate not exceeding 25 mm, aggregate cement
ratio not to exceed 15: I, aggregate gradation after blending to
be as per table 600-1, cement content not to be less than
kg/cum, optimum moisture content to be determined during trial
length construction, concrete strength not to be less than
Mpa at 7 days, mixed in a batching plant, transported to site,
laid with a paver with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing.
7 Cement Concrete Pavement M-30 (Construction of un- 110.00 Cum 6751.65
reinforced, dowel jointed, plain cement concrete pavement over
a prepared sub base with 53 grade cement @ 400 kg per cum,
coarse and fine aggregate conforming to IS 383, maximum size
of coarse aggregate not exceeding 25 mm, mixed in a batching
and mixing plant as per approved mix design, transported to
site, laid with a fixed form or slip form paver, spread,
compacted and finished in a continuous operation including
provision of contraction, expansion, construction and
longitudinal joints, joint filler, separation membrane, sealant
primer, joint sealant, debonding strip, dowel bar, tie rod,
admixtures as approved, curing compound, finishing to lines
and grades as per drawing.
8 Providing & Laying Bitumeneous Grout 37.5 mm thick using 113.00 MT 3262.30
asphalt grade VG-30 & Emulsion RS-1 for tack coat at the rate
of 4.00 Kg/ 10 sqm on existing B.T. surface and using B.T.chips
for required gradation with the asphalt of grade VG-30 at the
rate of 1.99 % i.e. 19.90 Kg./Mt by weight of mix including
heating and mixing in drum mix plant, transporting the mix and
spreading the same by paver finisher and consolidation as per
MOST specification including cost of all Materials, fuel, labours,
tools and plants etc. using contractor's own drum mix plant
9 Providing ,laying & rolling 37.50 mm thick compacted 279.00 MT 4387.44
Bitumeneous Macadam (B.M.) in one layer with B.T.
aggregates as per MoRT&H specification and Emulsion RS-1
for tack coat at the rate of 2.50 Kg /10Sqm.on B.T.Surface (As
per IRC- 16) with mechanical sprayer and using bitumen grade
VG-30 for mixing with aggregate at the rate of 3.50 % i.e.
kg / MT of total mix, ,, including heating and mixing in Drum mix
plant and spreading the same by Paver finisher and
consolidation with Vibratory roller including necessary including
cost of Hire charges, firewood, oil , Lubricants, labour
charges,etc.by using contractor's own Drum mix
plant,machineries and equipment, tools etc. complete in
accordance with the requirement of specification.
10 Providing and laying and rolling of compacted 20 mm thick Mix 190.00 MT 5398.45
Seal Surface (MSS) with B.T. aggregate as specified, using
asphalt grade VG-30 bitumen for mixing with aggregate at the
rate of 5.10% i.e. 51.00kg/ M.T. of total mix in drum mix plant
and transporting the mix material by tippers and laying with
paver finisher to the road level and consolidation with vibratory
roller including necessary firewood, oil, lubricants , labour
charges, using contractor's own drum mix plant, machineries
and equipment, tools etc.including flushing of sand
cum/10sqm. etc complete in accordance with the requirement
of specification Type-A
Rupees Fourty Four Lakh Sixty Thousand Fourty Six and Paise Eighty Five only
Fixed Deduction for available material from dismantling for First R.A. Bill
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words) of the estimated
rate mentioned above. Amount of my /our tender works out as under.
* Estimated Amount 44,60,046.85 * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….……. Add……..……..% Above Rs…………..….…….
In words………………….……………… In words………………….………………
Note :- 1.The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
Note :- 2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note :- 3.GST and Income tax TDS will be deducted at a source while making payments of bills
Note :- 4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a
change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Signature of Contractor
Note:- Amount Rs.0 of Dismentalled materials Shall be Recovered from 1st RA Bill of Contractor at Once.
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD CR Jivapar to Chakampar Road.pdf
2 Specification.pdf
3 Special Condition.pdf
4 Sch -B.pdf
5 Qty Sheet.pdf
6 Test Shedual.pdf
7 Circular Compress.pdf
8 CC Road Condition and photoes etc Compresss.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .