Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | ₹16.7 L | L1 | Accepted-AOC Approved |
| 2 | L2₹16.9 LRejected-Finance | ₹16.9 L | L2 | Rejected-Finance Above |
| Sl No | Description | Qty | Unit | R S KANNAN L2 | JAY HARINARAYANAA INFRASTRUCTURE L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 221 | m3 | 220 ₹48,620 | 197 ₹43,537 |
| 2.00 | Plain Cement Concrete 1:4:8 mix ( One Part of Cement Four Part of Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 37 | m3 | 6,311 ₹2.3 L | 6,311 ₹2.3 L |
| 3.01 | Supplying and Errecting Centering to Sides and Soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 Below Ground Level | 840 | m2 | 720 ₹6.0 L | 710 ₹6.0 L |
| 3.02 | Culvert | 18 | m2 | 947 ₹17,046 | 937.6 ₹16,876.80 |
| 4.00 | Plain Cement Concrete 1:3:6 Mix (One Part of Cement Three Part of Sand and Six Part of Aggregate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard. specifications.. TNDSS NO: 24 | 97 | m3 | 6,797 ₹6.6 L | 6,797 ₹6.6 L |
| 5.00 | Providing Granolithic Floor Finish of the following thickness with Plain Cement Concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 158 | m2 | 200 ₹31,600 | 193 ₹30,494 |
| 6.00 | Supplying Fabricating and Placing in Position of Steel Rods using TMT Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. TNDSS NO: 86 | 600 | Kg | 95 ₹57,000 | 92.9 ₹55,740 |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part Cement One and Half Part Sand and Three Part of Aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 | 4 | m3 | 9,200 ₹36,800 | 9,192 ₹36,768 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
25 Sept 2025, 3:00 pmClosed
Executive Officer
Nangavaram Town Panchayat
15th FC 2nd Instl 25-26 Construction of Storm Water Drain From Savaarimedu Ration Shop to Pillayar Kovil, Dhanapal House and VRO Colony Murugan Kovil to Co-Operative Bank in Nangavaram Town Panchayat, Karur District.
2025_DTP_605570_2
228/2025 3
Open Tender
Civil Works
180 days
Nangavaram Town Panchayat
Please refer the tender document
1 document required · 1 mandatory
₹0
₹20,000
13 Feb 2026
22 Sept 2025
25 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
Amount
Earthwork Excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Plain Cement Concrete 1:4:8 mix ( One Part of Cement Four Part of Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and Errecting Centering to Sides and Soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 Below Ground Level
Culvert
Plain Cement Concrete 1:3:6 Mix (One Part of Cement Three Part of Sand and Six Part of Aggregate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard. specifications.. TNDSS NO: 24
Providing Granolithic Floor Finish of the following thickness with Plain Cement Concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supplying Fabricating and Placing in Position of Steel Rods using TMT Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. TNDSS NO: 86
Reinforced Cement Concrete 1:1½:3 Mix (One Part Cement One and Half Part Sand and Three Part of Aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30
R S KANNAN (BID ID -1469366)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_725935.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid