Loading
Loading…
Loading…
Tender Value
₹22.5 L
EMD Value
₹38,169
Closing Date
16 Jul 2026, 3:00 pm7d left
Usha Nandhini. C
CM-Finance (Purchase)
Building for stadium Karithura for the functioning of office, Wash rooms, cafeteria etc. Karithura A
2026_IREL_282157_1
IREL/CHAVARA/26-27/T.No.62
Open Tender
Civil Works - Others
180 days
IREL(India)Limited, Chavara
As per clause 13 of the tender
2 documents required · 2 mandatory
₹0
₹38,169
Yes
26 Jun 2026
26 Jun 2026
17 Jul 2026
26 Jun 2026
16 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation/cutting in ordinary soil for foundation/clearing accumulated waste sand including shoring & shuttering wherever required and depositing the spoil earth with lead upto 50m and lift upon 1.50m for the construction of damaged security wall etc complete as per standard specification | - | Cu.M | 170 | - |
| 2 | PCC 1:5:10 using 40mm hard broken stone for Bed concrete & Flooring etc including all cost and conveyance of materials hire charges for shuttering and labour charges , curing etc complete as per standard specification but excluding cost of cement . . | - | Cu.M | 5,000 | - |
| 3 | RR masonry in cement mortar 1:6 for foundation, and basement using blasted rubble including all cost and conveyance of materials and labour charges , pointing the exposed face with CM 1:3 etc complete as per standard specification but excluding cost of cement.(M sand for approved quality with test certificate may be used as fine aggregate) | - | Cu.M | 4,000 | - |
| 4 | Supplying and filling gravelly earth for the inside of the basement including watering, ramming, consolidating etc complete as per standard specification. | - | Cu.M | 1,537 | - |
| 5 | Reinforced Cement concrete 1:2:4 using 20mm hard broken stone for Belt, lintel & roof slab etc including cost & conveyance of all materials hire charges for shuttering, labour charges for boxing, mixing, placing, ramming, watering, curing etc complete as per standard specification but excluding cost of cement & MS reinforcement. | - | Cu.M | 9,000 | - |
| 6 | MS reinforcement bent , tied and placed in position for all RCC works including all cost and conveyance of MS bars,binding wires, all labour charges,loading/ unloading charges etc complete as per standard specification. | - | Qtl | 10,000 | - |
| 7 | Cement block Masonry using cement blocks for super structure above plinth level up to 3.00m level in cement mortar 1:4 (1 cement : 4 coarse sand ). The rate includes cost and conveyance of all materials, all labour charges, hire charges for tools and plants, loading-unloading charges, curing etc complete as per standard specification. but excluding cost of cement. | - | Cu.M | 6,200 | - |
| 8 | Supplying & fixing Anjili wood planed and framed work for frames of doors, windows and ventilators etc at all heights using well seasoned anjili wood including all cost and conveyance of materials, hold fast, screws etc loading and unloading charges, all labour charges for fixing in position etc complete as per standard specification | - | Cu.M | 1,17,135 | - |
| 9 | Providing and fixing SS Grill of required pattern in frames of windows etc 10mm square rods 100 mm c/c etc including priming coat with approved steel primer , labour charge for making holes including all cost and conveyance of materials,all labour charges loading and unloading charges etc complete as per standard specification | 1 | Sq.M | 1,500 | ₹1,498.5 |
| 10 | Supplying & fixing in position Poovaras wood fully panelled door shutter at all heights in single or double leaves with styles of size 100x35 mm and 16 mm thick panels including all cost and conveyance of materials,all labour charges loading and unloading charges,etc complete as per standard specification | - | Sq.M | 3,535 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_329202.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid