| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 Cr+₹69.9 L (16.8%)Rejected-AOC | ₹4.9 Cr+₹69.9 L (16.8%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.0 Cr+₹84.1 L (20.2%)Rejected-Finance AT CHHAMUNDA PO CHHAMUNDA PS TELKOI DIST KEONJHAR STATE ODISHA PIN 758084 | CHHAMUNDA | KEONJHAR | ODISHA | 758084 | ₹5.0 Cr+₹84.1 L (20.2%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Insufficient machinery (Non responsive) |
| 5 | Rejected-Technical AT BHOKANJI PO BADAMUNDILO PS DIST JAGATSINGHPUR | - | - | Rejected-Technical At the time of bidding from 07.05.2026 to 21.05.2026, Registration Certificate B Class do not upgraded to A Class licences. |
Tender Value
₹4.6 Cr
EMD Value
₹4.6 L
Closing Date
21 May 2026, 5:00 pmClosed
Chief Construction Engineer, R.W. Circle, Keonjhar
O/o C.C.E., R.W. Circle, Keonjhar
Construction of bridge over Local Nallah on PWD (Kumundi) road to Urumunda road. (1x32.04 mtr. c/c with Well Foundation) under SBY in the District of Keonjhar.
2026_CERWI_129092_1
NCB-03/ RWCKJR/2026-27
National Competitive Bid
Civil Works - Bridges
Percentage
360 days
Keonjhar
4 documents required · 4 mandatory
₹10,000
₹4.6 L
Yes
31 Aug 2026
9 May 2026
22 May 2026
9 May 2026
21 May 2026
9 May 2026
9 May 2026 - 20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. | 221.31 | cum | 304.95 | ₹67,488.79 |
| 2 | Providing , fitting, fixing and placing in position steel cutting edge including cost of steel etc required as per approved drawing and technical specifications as per Section 1200 & 1900 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-charge. | 206.58 | qtl | 11,317.6 | ₹23,37,990.01 |
| 3 | Providing all machineries , labour, T&P & sinking of single circular well of specified external diameter through all types of soil / rock as specified below as shown against each case complete as per drawing & technical specification section 1200 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Enginer-in charge. (Depth of sinking is reckoned from bed level.1) In all kinds of soil (Upto 10m. Depth) For 7.50m dia abutment wells | 24 | rm | 28,422.79 | ₹6,82,146.96 |
| 3.01 | (upto 11 mtr. Depth)For 7.50m dia. Abutment wells | 2 | rm | 28,803.79 | ₹57,607.58 |
| 3.02 | (upto 12 mtr. Depth)For 7.50m dia. Abutment wells | 2 | rm | 29,184.79 | ₹58,369.58 |
| 4 | Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. For 7.50mtr dia well | 6 | rm | 1,25,849.05 | ₹7,55,094.3 |
| 5 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.For 7.50m dia abutment wells | 5 | rm | 3,40,226.33 | ₹17,01,131.65 |
| 6 | Construction of R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.For 7.50m dia abutment wells | 1.2 | rm | 6,79,570.65 | ₹8,15,484.78 |
| 7 | Earth work excavation in foundation in Hard and compacted sheet rock within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply & working of pumps stacking the excavated material away from the work in site. | 15.08 | cum | 1,662.15 | ₹25,068.55 |
| 8 | Plain Cement Concrete M 15 Grade using 20mm down graded chips in Foundation and Plinth (Bottom Plugging) | 544.47 | cum | 6,269.95 | ₹34,13,780.87 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.91 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_590447.xls
BOQ • 0.34 MB
2ndcorrigendum.pdf
PDF • 0.23 MB
1stcorrigendumnotice.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .