| 1 | L1₹64.5 LAccepted-AOC DUKANGANJ VARANASI | VARANASI | UTTAR PRADESH | ₹64.5 L Quoted ₹67.2 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹67.4 LRejected-Finance 00 JAI BHAWANI COMPLEX MAIN ROAD SADAR WARD JAGDALPUR BASTAR CHHATTISGARH 494001 UDYAM CG 01 0003803 | BASTAR | CHHATTISGARH | 494001 | ₹67.4 L | L2 | Rejected-Finance IInd Lowest |
| 3 | L3₹67.6 LRejected-Finance 152 AMRA DLW CHURAHA VARANASI UTTAR PRADESH 221011 | VARANASI | UTTAR PRADESH | 221011 | ₹67.6 L | L3 | Rejected-Finance IIIrd Lowest |
| 4 | L4₹67.6 LRejected-Finance BODARA KHURD CHAKIYA CHANDAULI | CHANDAULI | UTTAR PRADESH | 221009 | ₹67.6 L | L4 | Rejected-Finance IV Lowest |
Tender Value
₹68 L
EMD Value
₹5.4 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Shri Praveen Kumar
Office of the SE, Varanasi Circle, PWD, Varanasi
Janpad Chandauli me piparpatiya hathiyani marg ke Km 1 me Kshatigrast setu ke asthan par 4x3x3.50 m RCC box culvert ke nirman karya
2026_CEUVZ_1123122_2
SE Ref. No 986/183com-va-vritt/25-26 Dt. 21.02.2026
Open Tender
Civil Works - Bridges
180 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.4 L
Yes
Varanasi
27 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
10 Mar 2026
Earth work in cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding 1/2 m (20") in the depth and earth work in embankment to be in 20 cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.50 m ( 5') lift and 30 m (100') lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m (100') distance as directed by the E/I. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub base by providing well graded material spreading in uniform layer with moter grader on prepared surface at OMC and compacting with smooth wheel roller to achieve the desired density complete as per techanical specation Clause 401. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing , laying , spreading and compacting of stone aggragates 45-63 mm size in 75 mm compacted thickness to water bound macadam of G-III specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 8-10 tones in stage to proper grade and camber applying and brooming requiste type of sreening / binding materials stone dust to fill up the interstices of coarse aggregate, watering and compacting as per directed by E/I, as per techanical specification no 405.
Providing , laying , spreading and compacting of stone aggragates 22.4-53 mm size in 75 mm compacted thickness to water bound macadam of G-III specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 8-10 tones in stage to proper grade and camber applying and brooming requiste type of sreening / binding materials stone dust to fill up the interstices of coarse aggregate, watering and compacting as per directed by E/I, as per techanical specification no 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 kg/sqm using manual Mechaincal Means as per techinical specification clause 502. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumin pressure distributer at the rate of 0.30 kg per sqm in the norms bituminious surface cleaned with machanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing Laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm & 11.2 mm aggregate either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base. Including mixing in a suitable plant or mixol laying and rolling with a three wheels 80-100 KN static roller capacity, finished to required level and grade. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying of seal coat sealing the voids in a bituminious surface laid to specification to the specified levels,using crushed stone chipping 6.7 mm size and penetration bitumen grade V.G.-10 as per techinical Specification Clause 510. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick edging on both side of road with first class brick 8 cm. (3”) wide 12 cm. (4.50”) deep laid with mud mortar including all materials, labour, T & P etc. complete.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Earthwork embankment in patari with ordinary soil including 1.50M lift and 30 M lead and i/c all labour, royalty T&P etc in required slop for proper completion of work as per direction of E/I. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 as per SI No. 5 (2.6 b) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Sand Filling in foundation trenches as per Drawing and Technical Specification Clause 305.3.9 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
M-25 Reinforced Cement Concrete complete as per Drawing and Technical Specification (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supply fitting and placing MS bar reinforcement in supperstructure complete as per drawing and techanical specificatin Clauses 1002. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing pressur relief pipe 100 mm dia in bottom slab of box cell on a filtermedia base of 500 mm x 500 mm as per Drawing and Technical Specification Clause 305.3.9 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Stone boulder pitching in apron including cast of labour T&P etc. required for proper completion of work as per Mord data book sI No. 14.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment for Divergon with approved material obtained from borrow pits with a lift upto 1.5m & lead up to 2000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. but excluding cost of collor (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
C.R with cement and coarse sand mortar in proportion of 1:4 respectively for Foundation including cost of all material, labour, T&P etc. required for proper completion of work Labour cess but excluding GST)
C.R with cement and coarse sand mortar in proportion of 1:4 respectively for sub structure including cost of all material, labour, T&P etc. required for proper completion of work Labour cess but excluding GST)
C.C.with M-20 (1:2:4) cment,coarse sand & 20mm size stone aggregate including s/o all material labour T&P etc required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 including supply of all materials labour and T & P etc. required for proper completion of the work. Labour cess but excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
Tendernotice_2.pdf
PDF • 0.69 MB
Tendernotice_3.pdf
PDF • 0.38 MB
BOQ_2092353.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid