Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹20.6 L
EMD Value
₹50,000
Closing Date
5 Dec 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,KRFB-PMU, Palakkad/Malappuram
Office of The Executive Engineer, KRFB PMU, Palakkad/Malappuram
KIIFB-KIIFB-Manjeri Olipuzha Road-Road rectification work for chainage 0/000 to 14/970-General Civil Work
2022_KRFB_533799_1
PWD/KR/TR/22118/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
90 days
PANDIKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
15 May 2023
26 Nov 2022
7 Dec 2022
26 Nov 2022
5 Dec 2022
26 Nov 2022
Amount
Appendix -A Road Surface rectification
2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
OD178739/2022-2023:Supplying 18 mm hard granite broken stone and stacking in standard heaps for taking measurements without hindrance for traffic
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
OD178740/2022-2023:Providing, laying, and rolling of close graded premix carpet of 20mm thickness composed of 11.2mm to .09mm (Morth M-041) aggregates premixed using viscosity grade bitumen (VG 30 @22kg of bitumen per 10sqm (MORTH 5.7.1 Type A) to the required line, grade, and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100KN capacity, finished to the required level and grades. By manual means
OD178741/2022-2023:Providing 40mm chipping carpet over WMM surface with Deptl broken stone after thoroughly cleaning the base with wire brushes, brass brooms and applying a tack coat of bitumen 2.5kg/10m and spreading the hot pre-mix (formed of 0.32m3 of 18mm stone, 0.22m3 of 12mm broken stone and 22.08kg of bitumen/10m2) to template rolling to dense compact surface then spreading the seal coat ( comprising of hot pre-mix of 0.009m3 of 6mm broken stone and 8.64kg of bitumen /10m2 ) then rolling again to smooth finish including cost of bitumen, oil and fuels , hire charge for brass brooms, camber board roller hire charge and all other hire charges etc complete as per the direction of Deptl Officers at site. The total usage of bitumen 33.23kg/10m2
Appendix -B Road Side Maintenance
OD178733/2022-2023:Engaging man Mazdoor For Removing / Cleaning the rubbish and other aligned activities etc.
OD178734/2022-2023:Engaging Hydraulic Excavator for removing Choked wastes and other rubbish etc.
OD178735/2022-2023:Tipper for removal of all debris and excavated waste materials away from site
OD178736/2022-2023:Lifting, conveying and Replacing the RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD178737/2022-2023:Hire Charge For Wood Cutting Equipment's, pulleys etc.
OD178738/2022-2023:Engaging Wood Cutter for cutting down the dangerously standing tress and its branches.
SHAMEEM.K
Bidder Name
SHAMEEM.K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_774164.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .