Tender Value
₹47.6 L
EMD Value
₹40,000
Closing Date
18 Jun 2026, 6:00 pm
Executive Engineer - UGVCL KALOL DO
Annual Rate Contract Tender for Erection, Maintenance and Dismantling work of Overhead HT/LT LINE, TC & HT/LT AB Cable including MVCC work & Plinth work under CHHATRAL S/Dn, KALOL DO
311322
KLL-DO-05-2026-27/SR NO-3
Open
Power/Energy Projects/Products/Services
Gandhinagar
20 documents required · 20 mandatory
₹1,180
UGVCL- KALOL
₹40,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
18 Jun 2026
4 Jun 2026
1 Tender Notice No. KLL-DO-05-2026-27 / Sr No-3
Annual Rate Contract Tender for Erection,
Maintenance and Dismantling work of
2 Tender Item Overhead HT/LT LINE, TC & HT/LT AB Cable
including MVCC work & Plinth work under
CHHATRAL S/Dn, KALOL DO
3 Estimated cost 4761710/-
Tender Fees plus applicable GST (Non Refundable)-Can be accepted
4 in cash (up to Rs. 10000 only) at the office address specified in the 1180/- (1000+18% GST) As per prevailing
purchase policy (As Per Annexure-D)
tender document or by RTGS/NEFT/online Only.
EMD Amount in Rs.
(If EMD amount more than 3.00 Lakhs in that case EMD can be
accepted by RTGS/NEFT/online/BG/DD/Pay Order/Banker’s
5 40000/- EMD amount 1% of Estimate Cost
Cheque. otherwise paid either in cash (up to Rs. 10000 only) at the
office address specified in the tender document or by
RTGS/NEFT/online Only.
6 Security Deposit (For successful bidder) 5% of cost of LOA
7 Online Preliminary, Technical & Price bid, i.e. On line (e-tendering) Date :- 18-06-2026 ,18:00 Hrs
tender /offer , submission last date (This is mandatory)
Original Documents Relevant to tender Fee & EMD (if not paid
8 through online mode) (By Registered Post A.D. or Speed Post only) Date :- 18-06-2026,18:00 Hrs
submission last date.
(This is mandatory)
9 Date and time of opening of preliminary bid (Tender Fee & EMD Date :- 19-06-2026 , 11:00 Hrs
Online and offline)
10 Date and time of opening of Technical Bid online (Tentative if possible) Date :- 19-06-2026,11:00 Hrs
11 Date of On line Opening of Price Bid Online (Tentative, if possible) Date :- 19-06-2026 , 12:00 Hrs
12 Bid Validity 180 Days
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
1. Tender & relevant documents are to be submitted online and only Demand Draft / BG / self-
certified receipt of payment required to submit against TENDER FEE/EMD is to be sent by R.P.A.D /
Speed Post - Otherwise tenders will not be accepted.
2. Date of D.D. for Tender Fee and EMD must be on or before last date and time of on line
submission of tender.
3. Price bid/Technical Bid if submitted in physical form, same will not be opened and only online
submitted price bid/technical bid will be considered for evaluation.
4. All the bidders, in respect of the tender item must have vendor registration with the DISCOM
/ GUVNL or their subsidiary companies prior to the date of opening of technical bid.
Otherwise their bids will not be considered eligible for technical scrutiny and as such, their
technical bids will not be open.(Optional)
5. Any technical questions, information and clarification that may be required pertaining to this
tender should be referred to competent authority.
6. Any deviation found in online Data/Details/Documents in offer (e-tendering) of bidder, offer
of the same bidder will not be considered and no any further communication in the matter
will be entertained.
7. UGVCL reserves the right to reject any OR all tenders without assigning any reasons thereof.
8. UGVCL BANK DETAILS:
Name of Company : UTTAR GUJARAT VIJ COMPANY LIMITED
Bank Name : BANK OF BARODA
Bank Account No :
IFSC Code : BARB0KALOLX (Fifth Letter is ZERO)
Type of Account : Non Operative Account
Superintendent Account Executive Engineer
Exp. Section, DO.,KALOL
DO.,KALOL UGVCL.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
The contractor will have to give the following undertaking on Rs.300/- notarized
stamp paper: (within 15days from the date of LOA)
1. If this tender be accepted, contractor shall agree to abide by and fulfill all the terms and
provision of the Tender and contract of works as applicable and in case of default thereof
to forfeit and pay to the Company the sum of money due.
2. The value of EMD paid herewith should be absolutely forfeited to the company, if contractor
fail to deposit the full amount of specified security deposit, within specified time limit.
3. The contractor shall co-operate with the Company inventory etc. He shall submit all the
requirements which are necessary to finalize his outstanding bills within 10 days from the
date of completion of work, failing which the Company shall finalize the account on the basis
of its inventory records and initiate action as per company’s discretion.
4. The competent authority can delete any item in schedule “B” in the tender, if he feels that
the rate quoted by the contractor for that item is abnormally high when compared to
the estimated rate.
5. In case of any dispute, concern EE/SE will be the final authority for deciding the same and his
decision will be final and binding on the contractor and Department and no further
appeal will be entertained.
6. The contractor will have to see that safety equipments are used by his labours, while working
on the line, equipment etc. contractor will be responsible for any accidents.
7. The contractor will have to under taken responsibility of accidents etc. for his persons
working on the line.
8. The contractors will have to take insurance of suitable amount for his labours.
9. Contractors will have to carry out the work under his eligible and authorized supervisor.
However the work is to be done as per standards and under supervision of UGVCL.
10. The Company does not bind itself to accept the lowest or any tender neither with any reason
be assigned for the rejection. It is also not binding on the company to disclose any analysis
reports on the tender.
I/We hereby agreed and bound for all above conditions mentioned.
Name of Contractor: Signature
Full Address:
Contact Detail
Place: Date:
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
GENERAL DEFINITION FOR BIDDERS
1. DEFINITION
1.1 The "UGVCL" shall mean the Executive Engineer ,DO KALOL, UTTAR GUJARAT VIJ COMPANY LTD.,
having its corporate office at Mehsana. With expression shall unless repugnant to the context include its
permitted assigns or successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been accepted by the
UGVCL for award of the contract and shall include his authorized representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the UGVCL to act as Engineer-in-Charge to
supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with Performa, schedules
and drawings.
1.5 The "Order" shall mean the official letter issued by the UGVCL, informing the bidder that his tender has
been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the UGVCL with the contractor and shall
include the commercial technical and general conditions, schedules, drawings and any other conditions
specifically agreed between the parties forming a part of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per order
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per order
placed by the UGVCL and calculated from the quantities indicated in the tender.
1.9 The "Completion Period" shall mean the period starting from the date of issue of "Order" and required
to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by UGVCL from time to time to inspect the works
under the contract and/or duly authorized representative of the UGVCL.
1.12 “Letter of Award” shall mean the official notice issued by the UGVCL notifying the contractor that his
bid has been accepted.
1.13 “Date of Contract” Shall mean the date on which Letter of award has been Issued.
1.14 “Month” shall mean the calendar month day or days unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
1.15 “A Week” shall men the continuous period of seven days.
1.16 HT means High Tension electric line
1.17 LT means Low Tension electric line,
1.18 Testing: - After completion of work execution required Tests are to be taken in presence of Engineer in
Charge whenever required.
1.19 Definition of “Similar work” for overhead network: Erection, Maintenance & Dismantling work of
Overhead HT/LT Line, TC & HT/LT AB Cable overhead electrical Network up to voltage level 22 KV.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Important instructions for submitting the Tender
1.0 Executive Engineer ,DO KALOL, UGVCL has invited Annual Rate Contract Tender for Erection,
Maintenance and Dismantling work of Overhead HT/LT LINE, TC & HT/LT AB Cable including MVCC
work & Plinth work under CHHATRAL S/Dn, KALOL DO from the contractors / firms who have
executed works of similar nature and magnitude successfully and who are registered under
appropriate class.
2.0 Physical submission of Tender documents shall be for EMD and Tender fee cover only.
Bidder has to upload scanned copies of original (Notarized/self-attested copies of original- as specified
in tender document) documents with bid and no physical document to be submitted by bidder.
In case of short submission of documents with bid and/or clarification if any required from the bidder,
the required detail/documents may be asked from bidder in physical form.
It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF Form)
remain legible and should not be password protected.
3.0 Technical & Commercial.
3.1 Technical bid is to be submitted only in online. The below mentioned documents should be
submitted in form of self-attested true copies along with technical bid in N Procure Site
Only. No physical documents to be submit by bidder at KALOL Division Office UGVCL.
(i) Solvency certificate issued from any Nationalized/scheduled Bank of RBI & not older
than 12 month amounting of 20 % equivalent of estimated cost (as per UGVCL Rules).
(Duly Attested).
(ii) Separate EPF Code No. allotted by RPFC & Last Six month of current year EPF Challan
paid copy is required if applicable.
(iii) Vender Registration certificate as contractor in UGVCL. Bid of the bidder without
vender registration, will not be consider for further evaluations.
(iv) Last three financial year income tax return copy if applicable.
(v) Work experiences of the bidder shall be considered only if the works have been
executed under Public electrical utility of Central or State Govt. in India / Government
Sector / Power Utility (Government or Private) / Power sector PSUs & Power Sector
CPSUs. and also include option-II experience if work has been executed under
supervision of UGVCLs Engineer in charge with PO/WO issued by respective firm and
work should be certify by Executive Engineer. Work carried out for similar nature like
erection, maintenance & dismantling of overhear HT/LT line, TC & HT/LT AB Cable shall
have to be considered as a work experience and experience certificate should be issued
by order issuing authority (Not below the rank of Executive Engineer).
(vi) For qualifying the experience criteria; bidder shall submit Copy of Work Order (showing
the statement of quantity & amount in Rs.), work completion certificate (showing
amount of actual work completed) up to last 7 years as per Annexure-A with Experience
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
certificate. Satisfactory work completion certificate for erection of Overhead HT-LT line,
T/C & HT/LT AB Cable work by authorized officer of Distribution Company. Copy of the
annual work orders with amount of erection of Overhead HT/LT line, T/C & HT/LT AB
Cable of any Distribution Company is also required for supporting documents.
(vii) Group Insurance: -A copy of the insurance policy of the insured labourer’s under W.C.
(viii) The contractor will have to under taken responsibility of accidents etc. for his persons
during working on the line and same will be on notarized stamped paper of Rs. 300/- or
the appropriate value (if revised by Govt.) within 15days from the date of LOA. The cost
of stamped will be borne by contractor.
(ix) List of Tools & Tackles and safety equipment’s available with contractors as per
Annexure-B.
(x) Copy of the Electrical contractor license issued by the Office of Govt. of Gujarat. The
contractors outside of Gujarat State must have to take approval from Government of
Gujarat for Electrical Contractor license.
(xi) Labour license if applicable.
(xii) Copy of GST Registration Certificate duly attested.
(xiii) Copy of Permanent Account No. (PAN) duly attested.
(xiv) Details of Partners / Directors of Firm / Company.
(xv) Contractor’s Store address along with proof.
(xvi) Other documents (if required by authority).
(xvii) Bidder has to submit the copy of complete type test reports / certificates of offered
make of major supply items (Any make approved by GUVNL & Its Subsidiaries
Company) as required in overhead work. The Certificates / reports should not be older
than 7 (Seven) years
(xviii) Bidder has to provide the authorization letters from the manufacturer / authorized
dealer of offered make material. Guarantee also required from bidder as well as OEM /
authorized dealer.
(xix) Experience as a sub-contractor shall not be considered for technical evaluation except
mentioned as per Clause No. 3.2 (v).
(xx) Bidder must have Skilled Supervisor having Supervisor License & Skilled Technical staff
& labour for execution of work.
(xxi) Bidder must submit required document such as RTO Registration or a valid tie-up agreement
with a service provider for pole erection device (PED Machine).
Those bidders who have successfully submitted all above requirements are to be considered
for further evaluation.
The above stated criteria are minimum and the UGVCL reserves the right to request for any
additional requirement and also reserves the right to reject the bid of any bidder, if in the
opinion of the UGVCL, the qualification criteria are not fulfilled.
Note: For tender estimated value below 5 Lakhs & ARC tender of estimated value more than Rs.
Lakhs, criteria stated at clause no. 3.2-(V) & 3.2-(Vi) shall not be applicable for New Bidders.
Quantity Allocation will be as per Clause No. 43 General terms and Condition.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
3.3 Technical Criteria for awarding the contract to qualified bidder is as under
Similar Nature of Work: The bidder should have successfully completed or substantially
completed similar nature of work i.e. Erection, Maintenance & Dismantling of overhead HT/LT
Line, TC & HT/LT AB Cable Work for 11kV and above class in last 7 years ending last day of
month previous to the one in which bids are invited should be either of the following:
The amount of work completed by bidder as per work completion certificate shall be considered.
i. Experience in single completed work of projects execution in electrical sub-transmission /
distribution sector costing not less than the amount equal to 70% of the estimated amount of
the tender.
ii. Experience in two completed work of projects execution each in electrical sub-transmission /
distribution sector costing not less than the amount equal to 40% of the estimated amount of
the tender individually.
iii. Experience in three completed work of projects execution each in electrical sub-transmission /
distribution sector costing not less than the amount equal to 30% of the estimated amount of
the tender individually.
The similarity of work shall be pre-defined based on the physical size, complexity, methods/
technology and/ or other characteristics described, and scope of works. Substantial completion
shall be based on 80 (eighty) per cent (value wise) or more works completed under the contract
(Note: Substantial completion should not be defined in terms of percentage completion, rather
it should be based on functional consideration. For contracts under which the applicant
participated as a joint venture member or sub-contractor, only the applicant’s share, by value,
shall be considered to meet this requirement. For arriving at cost of similar work, the value of
work executed shall be brought to current costing level by enhancing the actual value of work at
simple rate of seven percent per annum, calculated from the date of completion to the date of
Bid opening.
Certificate for ‘substantial completion’ of project/work/asset should contain two parts. Part -I
shall contain ‘financial value of work done’ and part-II shall contain ‘certificate of functional
completion of project/work/asset’.
3.4 Minimum Average Annual Turnover (MAAT) for last three years, ending 31 st March of the
previous financial year, of the bidder should be at least 30% of the estimated cost of the
tender. In this regard, separate notarized certificate from CA must be submitted.
3.5 Net-worth of the last Financial Year shall be positive.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Note: Turnover & Net-worth shall be certified by CA on his letter head and duly attested. Turnover
for preceding year shall be considered subject to submission of provisional / audited certificate
from CA by the bidder.
3.6 Details of Partners/Directors of the Firm/Company.
Partnership deed in case of Partnership firm.
Memorandum of Association & Article of Association in case of Company.
Note: For tender estimated value below 5 Lakhs & ARC tender of estimated value more than
Rs. 5 Lakhs, criteria stated at clause no.3.3, 3.4 &3.5 shall not be applicable for New Bidders.
Quantity Allocation will be as per Clause No. 43 General terms and Condition.
3.7 Payment of tender fee/EMD can be accepted by RTGS/NEFT in favor of UTTAR GUJARAT VIJ
COMPANY LIMITED.
Bank Name & Branch: BANK OF BARODA
A/C Num.:
IFSC Code: BARB0KALOLX (Fifth Letter is ZERO)
In case of cash payment (up to 10,000/-), the scanned copy of cash receipt shall have to be
uploaded with bid. In case of payment through DD/Banker Cheque/pay order/Bank Gaurantee,
the scanned copy of original document shall have to be uploaded with the bid and original copy
of the same will have to be submitted at the UTTAR GUJARAT VIJ COMPANY LIMITED Division
Office KALOL, within 3 days of specified last date of submission of tender.
The cancelled check of concern bidder is to be attached for further course action of payment as
per rule through RTGS/NEFT by UGVCL.
The tender fees once paid for tender document will not be refunded under any circumstances
or not transferred to other bidder.
3.8 EARNEST MONEY DEPOSIT (EMD)
The EMD payable, between the dates mentioned in Table no 1 only.
The EMD Amount is as per Annexure-E. The digital copy of amount transfer towards Tender fee
and EMD is to be uploaded with the tender documents.
The EMD of all unsuccessful bidders except that of the successful bidder will be returned after
the award of the contract.
EMD of the successful bidder to whom a contract is awarded will be returned after the said
bidder pays the security deposit and signs the contract agreement.
If the successful bidder fails to submit a Security Deposit within 15days from the date of LOA of
the contract or fails to sign the contract agreement, then the EMD amount will be forfeited in
favour of UGVCL without any notice or and action for “Stop deal” will be initiated as decided by
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
No interest will be payable by the UGVCL on the above Deposit.
Tenders without Earnest Money Deposit by the firms/Name will be rejected without entering in
to further Correspondence in this regard and no reference will also be made.
Earnest money deposit will be forfeited in case the successful bidder after his tender has
been accepted shall refuse to pay the prescribed security deposit and execute the contract.
4 Tender Papers & Specifications may be downloaded from web site
https://tender.nprocure.com (To view, download and on-line submission of documents) and
UGVCL web site www.ugvcl.com (To view & download only).
5 Bidders should be in touch with websites https://tender.nprocure.com & www.ugvcl.com for
information regarding revision/corrigendum/Amendment in tender till due date of online
submission and thereafter. No separate information shall be sent in this regards and also not
publish in newspaper.
6 It is mandatory for all the bidders to submit their tender documents/Technical bid with
scanned copy of Tender Fee and EMD evidence by on-line (e-tendering) upload in schedule
7 The Bidder must submit their Technical Bid & price bid online in electronic format only on N-
Procure web site till last date& time for submission. Offers in physical form will not be
accepted in any case.
8 Technical bid shall be opened on date (as mentioned) (If possible) in the presence of the
bidder, who remains present at that time.
9 The bidder shall have to submit their offer without any deviations in general terms and
conditions of the contract or in Technical specification/items. Tenders of such deviations may
also be rejected. Incomplete and conditional tenders shall not be considered.
10 UTTAR GUJARAT VIJ COMPANY LIMITED reserves the right to split up the work covered in the
scope of this contract amongst more than one contractor
11 Intending bidders should submit their tenders after studying all tender’s documents carefully
and visiting the site for satisfying themselves of actual site conditions, location and
accessibility of site and nature, extent of the work involved etc. Submission of tenders implies
that bidders have obtained all necessary information and other data required for executing
the work. No claim for extra charges on account of any misunderstanding or otherwise will
be allowed.
12 All approaches to the site shall be in the scope of bidders.
13 The successful bidder will not be allowed to give sub-contract of the works awarded to him
for any reasons what so ever without permission of the competent authority.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
14 In the experience certificate, contractor has to furnish the details of similar works executed
by him along with the list of equipments, tools and tackles and manpower available with him.
15 Price quoted shall be firm, till overall completion of the work under contract and there will
not be any price escalation.
16 Date of opening of “Price Bid” will be intimated later on to those Bidders who are qualified in
technical bid. “Price bid” of only qualifying bidders on the basis of Technical bid shall only be
opened. Price of bidders, who are not qualified technically as per requirement of technical
bid shall not be opened.
17 Offers shall be valid for the period of 180 days from the date of opening of price bid. Bidders
shall not withdraw tenders during the validity period, failing which their EMD shall be
forfeited during the period of 180 days.
18 All the works shall be carried out as per specifications attached with the tender as per REC
standards & Drawings. All materials procured (if required) should be confirming to relevant
Indian Standard issued by Bureau of Indian Standard and from approval of UGVCL.
19 Tenders, who do not fulfil all or any of the conditions of the tender found incomplete in any
respect, are liable to rejection.
20 A. The tenderer must quote his rate per unit specified in the schedule in figures as well as in
words. If there is difference between rates quoted in words and figures rates quoted in words
shall prevail. Further should there be any discrepancy between rate and amount that rates
shall prevail.
B. The bidder must clearly quote their rates in Schedule – B of this tender, in percentage
above than, below than or equal to, the tender rate in figure as well as in words.
applicable, in force at that time, The bidder must work out the total price of their tender
offered accordingly and the total amount should be clearly written in words & figure, in case
offered accordingly and the total amount should be clearly written in words & figure, in case
of any discrepancy whatever written in words shall prevail. Company shall at liberty to decide
the matter as it deem fit.
D. Any variation in rates etc will not be allowed on any ground once the tender submitted is
opened for consideration.
E. The tenderer’s own conditions of the contract will not be considered as forming the part of
the tender. The tenderers must send in their tenders, only if the Company’s conditions are
acceptable to them.
F. All corrections what so ever made in the tender rate must be signed fully with date by the
tenderer before submitting the tenders.
G. Rates must be quoted without any conditions. In case of divergence between rates in
figures and words; it will be constrained to read the rate most favorable to Company.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
H. The rate quoted should be in percentage higher /lower/rate to rate.
21 Bidders willing to participate in tender should have valid digital certificate / Digital Signature
as per Information Technology Act 2000 using which they can sign their electronic bids.
Bidders can also procure the same from (n) code solutions, a division of GNFC Ltd., who are
licensed certifying authority by Govt. of India.
22 AMENDMENT TENDER
At any time prior to the deadline for submission of bids, as mentioned in Table1, UGVCL may,
for any reason, whether at its own initiative or in response to a clarification requested by a
respective bidder, modify the bidding documents by amendments.
The amendment will be notified, only on UGVCL Website & n-procure website in case of on
line tender, UGVCL will bear no responsibility or liability arising out of noncompliance of the
same in time or otherwise.
Such amendments, clarification etc. shall be binding on the bidders and will be given due
consideration by the bidders while they submit their bids and invariably enclose such
documents as a part of the bid.
23 The tenderer Uttar Gujarat Vij Company Ltd. Reserves the right to reject any or all tenders
without assigning any reason thereof.
24 Conflict of Interest among Bidders/ Agents:-
A bidder shall not have conflict of interest with other bidders for particular quoted item. Such
conflict of interest can lead to anti-competitive practices to the detriment of Procuring
Entity’s interests. The bidder found to have a conflict of interest shall be disqualified. A bidder
may be considered to have a conflict of interest with one or more parties in this bidding
process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial stake from any of
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts
them in a position to have access to information about or influence on the bid of another
bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a bidder
in more than one Bid will result in the disqualification of all bids in which the parties are
involved. However, this does not limit the inclusion of the components/ sub-assembly/
assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their behalf in
a particular tender enquiry. One manufacturer can also authorize only one agent/ dealer.
There can be only one bid from the following:
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
1) The principal manufacturer directly or through one Indian agent on his behalf; and
2) Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design
or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units, or
more than one unit having common business ownership/ management, only one unit should
quote. Similar restrictions would apply to closely related sister companies. Bidders must
proactively declare such sister/ common business/ management units in same/ similar line
of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as
amended from time to time.
25 Every bidder should, at the time of submission of bid, give a declaration, that bidder shall not
have conflict of interest with other bidders for particular quoted item, as above.
26 For erecting pole the pits should be digging by using pole erection device (PED Machine)
wherever it is not possible to use PED machine in the area lick hard rock, small streets etc. the
permission of the engineer in charge shall be obtained for digging of pits as per conventional
27 INDEMNITY BOND
The successful bidder will have to give indemnity bond to UGVCL against any possible claim of
compensation for damage to Contractor’s equipment or staff or any of third parties during the
execution of work as per attached format.
28 LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be
accompanied by its translation in English. Failure to comply with this may disqualify a bid. In the
event of any discrepancy in meaning, the English language copy of all documents shall govern.
29 If any bidders firm or/and partner or proprietary firm anywhere in companies (PGVCL, UGVCL,
MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under criminal investigation for any kind of
fraud for public and theft of material or/and with handlings the material and any civil and/or
criminal case pending at any stage than offer of such bidder /firm will be out rightly rejected.
30 Conditional bids shall not be accepted.
Signature of Contractor Executive Engineer
Name of Seal, Details Add. UGVCL, D.O._KALOL
With Cell No/Fax
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT
For erection work 11 KV and L.T. Distribution lines and Transformer Centers.
(a) Erection of HT and LT Lines:
Site clearing and tree cutting, which come in the way of line, will be done by the contractor at
his cost. The Company will assist the contractor in getting necessary permission for tree
cutting etc. Any claim for compensation in above respect will have to be borne by contractor.
(b) Fixing of Pole Location:
The Points of pole structures, guys and earthing will be fixed by the department and will be
shown to the contractor. He should adhere to these locations in all circumstances unless
directed by the department to make any change. The Poles from One site to other site or at
proposed locations must be carted by loading on Tractor or Hand-Cart. The Poles shall not be
carted by toeing/Dragging with Tractor or Cart or with any other means.
(c) Pole setting:
Where poles are set in good solid ground, the depth of pit shall be 1/6 the height of the pole
and for grounds of any other nature, depth of pit shall be decided by the department. The
poles and guys must not be set at the edge of cuts or embankment where the soil is liable to be
washed or eroded out such setting should be avoided. While back filling, proper care should be
taken for filling of pit.
Extra payment is payable for hard soil or rock under the pole erection item which may be
quoted in the tender. The cost of damage done to the pole during erection will be
recoverable from the contractor. Pole, which is out of plumb/ out of alignment, shall not be
He should be able to render full account of the poles entrusted to him whenever the
Supervising Officer demands to scrutinize the same.
(d) Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place in the
village, excavation of pit, erection in position (with base plate where required), of 8 meter,
meter PSC poles, 9 meter to 13 meter long rail or suitable size girder or any other suitable pole,
fitting of clamps and cross arms and fabricated materials, fixing of caution boards as per
drawing, and specification inclusive of painting numbering and anti climbing device. Generally
vertical formations will be used on each pole. However horizontal formations will have to be
used in special circumstances as per instruction of Engineer in charge.
(e) Special Two Poles Structure
Special two poles structure such as for HT line tapping, Railway crossing, any other HT/LT or
telephone line crossing, terminal structure for transformer substation comprises of Excavation
suitable pits and refilling of earth erection in position of two nos. of 8 Meter to 10 Meter PSC
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
poles. 9 meter to 13 Meter long rails or any other suitable poles fitting of clamps and cross
arms, bracing, cross bracing etc. as per drawing exclusive of mounting transformer but
inclusive of mounting D.O. fuses/ A.B. switches, numbering fixing of caution Board and anti
climbing device etc. The D.P. must be properly aligned and must be in plumb. Special structure
if included will be erected as per drawing supplied. Each Shackle Points must have “D” type
Jumpers only.
(f) Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary HT/LT Pin
and strain insulators, binding on insulators, jumpering. The jointing in HT line will be done
properly as per standard practice. Care must be taken in handling the conductor to protect
against cuts, scratches or kinks. The conductor must not be drawn over rough or rocky
ground, when it is liable to be damaged.
Wastage and cutting should be avoided as far as possible. Sag will be accepted as per RE
Standard in the materials account drawn for proper tension. The sag and spans will be
maintained as per drawing and design. The cross arms insulators must be so fixed that neither
tilts nor bands from position. The rate quoted should be per conductor route kilometer.
The span and sag, however, may vary according to sizes of pole available that these dimensions
will be specified by the field office before commencement of work. The sagging should be
uniform for all conductors and uneven sagging will not be allowed.
All the clearances should be maintained as per latest CEA (Measure relating to safety & Electric
Supply) regulation-2023 clause No-60 to
(g) Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation of
suitable pit of 4' depth, fixing of stay clamp on pole, binding of GI stay wire. The stay insulators
must be inserted in the stay wire on all stays as per drawing. The wrapping of the Guy wire
strands at both ends the stay insulator must be even and must presents neat appearance and
good workmanship. No stay should be left loose but should be tight and straight to withstand
in say cyclone or sand storm, the item includes refilling of earth and painting of fabrication
material. If stays are not required to be concreted, a pre casted cement concrete block will be
supplied by the department from his division store which the contractor will have to transport
at his own cost to the site of work and will have to use for fixing of anchor rod at site.
(h) Earthing:
The earthing arrangement shall be of pipe type/ plate type/ coil type as indicated in the
drawing. The earthing pipe/earthing plate/earthing coil supplied by the company shall be used
as per specification and drawing. GI wire no. 8 SWG for earthing should be bolted with
earthing pipe/earthing plate/earthing coil. G. I. Wire must be passed through PVC rigid Pipe
which must be buried at least 0.5 Meter in ground and to be kept 2.0 Meters above ground
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
along the Pole. The earthings are to be done at place as indicted in the pole schedule or
cost. Erection of earthing should be carried out by digging separate pit of 1.8 meter for each
earthing under the supervision of the in charge. No amount will be paid if the work is not
done in accordance with these instructions. At least 10 KG of charcoal and 10 KG of salt
should be invariably used by the contractor at his cost and refilled the earthing pit with the
alternate layers of coal / coke and earth. Earthing carried out in pit of pole will not be
considered and no amount will be paid for such type of earthings.
(i) Guarding:
The guarding will have to be provided between crossing of HT and LT lines, at the road
crossing, crossing of telephone and telegraphs line and such other places as indicated by the
department. The work comprises of fixing of guard cross arms, eye bolts, guard cradle as per
design, GI cross lacing wires complete. Any special type of guarding if required will be
designed and erected by the contractor as per requirement of department. The ground
clearance, line to line clearances etc. to be maintained as per latest safety regulation-2023 of
(j) Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two coats of
approved aluminum paint, all fabricated material will also be painted in a manner shown
above, there should be sufficient interval between every coat of painting in order to allow for
drying. The bolts and nuts shall be dipped in anticorrosive oil before insertion. The lower
portion of steel poles up 3 fit above ground level shall be cleaned of all dust and rust. This
surface should be given a base coat of red lead and an additional coat of black bituminous
paint before inserting in the ground. The good quality paint will be supplied by the contractor
and should be of I.S.I mark and will be got approved from Executive Engineer, prior to starting
work. Name of the feeder and pole number has to be written on all the poles in English or
Gujarati as per instruction of Engineer In-charge. The colour of back ground and name /
number must be of contras colour. P.S.C poles need not be painted but should be properly
cleaned and all accumulations of earth, dirt etc, should be removed but fabrication material
has to be painted. It is suggested to get one coat of red oxide and two coat of silver paint at
the MS fabrication material.
(k) Muffling:
Unless Specified concreting is to be done for Girder Poles/Guys only. no any PSC Pole/Guys to
be concreted without any special reason. The Concreting of PSC Poles must be approved by
concerned Executive Engineer prior to execution. Concrete for Muffling of poles and stay rods
should be cement one part sand two parts and four parts metal (1:2:4). Muffling is not to be
done for PSC poles. Sand shall be clean and composed of hard siliceous grains. It shall be free
from clay or organic matter. Metal should be having sound hard and durable stone size ½” to
¾” sieve. Drawing of Muffing are attached.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
(l) TRANSFORMER CENTER:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type mounted on
two poles structures as per standard drawing and comprises of,
Erection of poles with necessary earthings.
One set of HT D.O fuses/ AB Switch.
11KV 10 to 200 KVA transformers complete with its accessories.
One set of HT lightning arrestors.
Fixing of Distribution box, cross arms and branching with earthing as per drawing,
necessary wiring of appropriate size of cables.
Stays with insulators, numbering, fixing of danger board and ant climbing device.
Three independent separate pipe type earthing/plate earthing / coil earthing should be
provided on either side of the transformer center and one at middle of the transformer
center. One separate earthing for LA, one separate earthing for transformer neutral and
one separate earthing for transformer body and other metal parts including distribution
box. Each consisting of one or more earth connection to earth pit.
The rate should be quoted inclusive of transportation of distributions transformer from the
Company's stores to the site of erection. The cost of damage done to the transformer is
recoverable from contractor.
(m) Stringing of HT/LT Arial Bunched Cable
This includes stringing of Arial Bunched Cable with providing and fitting of necessary
accessories like dead end clamps, suspension clamps, insulation piercing connectors, Eye
Hooks, HT termination kits, jumpering etc. Care must be taken in handling the cable to protect
against cuts, scratches or kinks. The cable must not be drawn over rough or rocky ground,
when it is liable to be damaged.
(n) INSTRUCTIONS TO BE FOLLOW BEFORE STARTING WORK
Before starting the work (New, alteration or addition) and during the progress of works the
contractor must obtain line clear whenever necessary from the concerned officers of this
department or other. During transportation or erection, if any accident occurs or any liability
arises due to non-observance of rules / instructions, contractor will be solely responsible for
All conductor, earth wire and stay set must be tight. Stay rod pit must be as per the
specifications. The entire pole must be in plumb. Fabrication fitting on pole must be tight.
Span of HT/LT line shall have to be kept as per site survey done by Engineer In-Charge and as
per site situation.
So long as the line is not handed over to the company, the responsibility of its safe custody
and of all fixture and materials etc. lying with that of the contractor will be that of the
contractor.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
PROCEDURE TO BE FOLLOW FOR GETTING MATERIAL FROM STORES
A. Issue of materials:
The following materials shall be supplied by the UGVCL free of cost for use on the works to the
contractor as required from RSO / Divisional Stores as well as from the sub-division store if
any. The transportation will have to be arranged by the contractor at his cost (except poles of all
List of Materials:
1. All types of Conductors & AB Cable.
2. The pole will be supplied by UGVCL at convenient place near place of work within 4 KM.
Contractor has to cart poles to the destination from the location where poles staked by
UGVCL within the radius of 4 KM at his cost.
3. HT-LT insulators with hardware.
4. All fabricated steel material with bolts and nuts.
5. Stay wire, G.I wire, earthing plate, earthing coil, earthing bolt, earthing pipes.
6. Distribution Transformer, LT Dist. Box, lightning arrestors, HT D.O. Fuse, AB switch with
accessories, PVC cable.
7. Danger board, anti climbing device of barbed wire.
8. Earthing plate/earthing coil/earthing pipe.
9. Stay set material.
10. All types of Bolts and nuts to be supplied by company as per availability in store, if not
Contractor has to provide the same and at the rate prescribed by company time to time in
statement of rates(SOR) will be reimbursed to the contractor.
The rates quoted should be inclusive of required all type of bolts and nuts (except LT Shackle
bolt) and transportation cost of all type of materials to site from the stores.
B. The quantities in the Schedule are approximate. Actual quantities may increase or decrease
according to the local conditions. The department reserves the right for revising or omitting
any of the quantities to be erected during the execution.
C. The contractor will draw and will be given only those materials and in anticipated quantities
that are just sufficient for the works to be carried out by him.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
D. The materials will be issued to the contractor himself or his duly authorized representative
only. The contractor at the time of drawing materials from the stores shall have to give letter
of authorization in triplicate to the concerned sub-divisional officers, specifically stating the
names of the persons who will draw materials form the store on his behalf and would sign the
requisitions for and on behalf of the contractor and shall be binding upon the contractor. In case
if any authority or power of attorney is to be terminated, written instructions in this respect
must be intimated by Registered Post to the Executive Engineer and concerned sub-divisional
E. The contractor should get the requisition, three days before requires the materials on site,
from the Engineer-in-charge, for the material as per technical sanction. All the materials
mentioned in the requisition should be issued from Divisional store to the name of contractor
with scheme. No any material should be drawn departmentally for the work allotted to the
contractor.
F. In case of loss or damage to materials, contractor will be responsible for the same, he has to
lodge FIR regarding loss of material. Action will be taken as per discretion of UGVCL, the cost of
the same will be recovered from the Contractor at stock issue rate plus 15% overhead charges
with applicable TAXES and shall be considered as final and unchallengeable.
All the materials issued by UGVCL shall be transported to the work site on same day and to be
preserved in safe custody at pre notified stores, failing to which UGVCL shall initiate Police
action. Similarly as per instruction of Engineer In Charge, you have to credit the material at
UGVCL store without any loss of time failing to which UGVCL shall initiate Police action.
G. The contractor will be fully responsible for any damage, breakage, loss or theft of materials
during transit or erection issued to him from stores till the time the work is handed over to and
taken over by the Company. The cost of damage shall be recovered from him as stated
above in F.
H. All materials supplied to the contractor shall remain the absolute property of the company and
shall on no account be removed from the site of the work and shall at all times be opened to
inspection by the Engineer in-charge.
I. Any such materials remaining unused and in perfectly good condition at the time of
completion of the contract shall be returned to the company store for which no carting charges
are payable to the contractor.
J. The contractor will have to make his own arrangements to keep the materials under lock and
key (i.e. Store) and address of all the stores to be submitted before commencement of work.
He will be responsible for theft or loss on account of any reason what so ever.
All the above instructions have been read by me thoroughly or have obtained the thorough
understanding of the same and are acceptable to me unconditionally.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
GENERAL TERMS & CONDITIONS
1) The work should be strictly as per specifications and approved drawings of the Company
which can be supplied by the Engineer In-charge for reference at the request of the
contractor. The inferior and unsatisfactory work is liable to be rejected.
Before commencing the erection of lines, the contractor will be provided with the schedule
and the detailed layout map (proposed sketch). The work will have to be carried out as per
programmed laid down by department and under the entire supervision of UGVCL’s deputed
supervisor and contractor should employ his qualified supervisor who could supervise the
works throughout and he should remain present on site.
Marshy or water logged locations must be avoided as far as possible. If it becomes inevitable
to locate poles at such points, special precautions about foundation will have to taken and
work carried out as per instructions of the Engineer In-charge.
No tools will be supplied by the department. The work if found inferior and not up to
standard of the Company is liable to be rejected at the risk and cost of the contractor.
Any expenditure incurred for rectification work carried out by department will be recovered
from contractor’s bills, if the contractor fails to rectify the inferior work done by him in spite
of the instructions to rectify the same.
Contractor will have to submit the certificate of their supervisor under whose supervision the
work has been carried out.
2) Acceptance of Tenders:
The Company does not bind itself to accept the lowest or any tender, neither will any reason
be assigned for the rejection. It is also not binding on the Company to disclose any analysis
reports of the tenders.
Accepting authority reserves the right of rejection of any or all tenders without assigning any
reason thereof.
Any tender who does not comply with the above requirements is liable to be rejected.
3) Security Deposit:
The successful bidder shall have to pay security deposit of within 15 days from the date of
issuance of LOI/LOA of an amount equivalent to 5% of the value of the work to be allotted to
him and as mentioned in LOI / LOA.
The Security deposit is payable the option of UGVCL by: (a) Demand Draft (b) Bank Guarantee
to cover execution period and, from any Nationalized /schedule Bank Payable at KALOL. The
Security Deposit will be returned to the Contractor without any interest after the successful
completion of work and submission of No Objection Certificate by concern office.
4) Contract Document:
The successful bidder, whose tender is accepted will have to execute a 300 Rs. stamped
agreement in standard form with the company and will have to sign the contract booklet viz.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Tender and contract for works at his own cost. In case of partnership firms, necessary
partnership documents, in original along with its copy will have to be produced for
verification along with authority to sign the bills measurement and enter in to contract as
well as correspondence with the company. Wherever required necessary power of attorney
will have to be produced especially when the partnership deed is silent on the point of
authority to deal with the Company. The contractor will have to execute the documents
and sign the booklet “Tender and contract for work” before starting the work.
If a contractor happens to be a sole trader he will have to produce an affidavit made before
Magistrate to that effect.
5) TAXES AND DUTIES:
5.1 Bought out items from vendors/sub-suppliers: All levies, duties, GST and Cess etc. payable
on equipment/material components, sub- assemblies, raw materials and any other items
used for the bidder's consumption or dispatched directly to the owner from its sub-supplier
and any such taxes, duties levies additionally payable shall be to bidders account and no
separate claim on this behalf shall be entertained by the UGVCL.
5.2 UGVCL’s GSTIN Registration Nos. is 24AAACU6551F1ZI
5.3 The bidder shall be liable and responsible for payment of all taxes as attracted under the
Provisions of the law.
5.4 “In case any tax or duty is newly introduced by the Government applicable for this
contract with effect from the next day of the date submission of the bid and if the contractor
is required to pay new tax or duty, then the owner shall reimburse the contractor the new tax
or duty so paid by the contractor against submission by the contractor of documentary
evidence to the satisfaction of the owner.”
5.5 At the time of payment, statutory deduction will be made as per applicable rules and
rates for TDS, WCT, welfare cess etc. All other statutory liabilities towards contract will be on
the part of contractor.
5.6 Before quoting, the bidder may ascertain from the concerned tax authorities of
Government the applicability of GST and Cess, etc. in respect of this work. No separate claim
in this regard will be entertained by the UGVCL, as it is the responsibility of the Bidder to pay
all these taxes.
5.7 Goods and Service Tax (GST): The F.O.R. destination prices are excluding GST and Cess as
applicable which will be paid extra on a given taxable goods and/or services within the
original contractual delivery period. The amount of GST/ and Cess as applicable should clearly
be indicated separately. (GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws
means IGST Act, GST (Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST
Act and SGSCT Act, 2017and all related ancillary legislations).
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
5.8 You shall have to submit a C.A Certificate & duly authorized Signatory of successful
bidder, certifying that you have not claimed Refund of any applicable GST/ and Cess, charged
to COMPANY or shall not claim any such Refund, on a future date, from the concerned
Authorities and if, any Refund, in respect of such GST/ and Cess, is claimed by you, it will be
immediately passed on to the COMPANY, without /COMPANY making any specific Claim, for
the same, either from the Department or from you.
5.9 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of
GST and Cess is not mentioned clearly unless the bidder has opted for Composition Scheme
under GST Act, which should be clearly indicated in the price bid. /COMPANY may at its
discretion consider such offer with presumption of highest applicable rate of GST/Cess
prevailing when the price quoted is inclusive of GST and Cess.
5.10 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will have to
be borne by the Bidder. In no case additional amount towards tax or otherwise will be paid /
reimbursed to supplier/contractor. Further Statutory Variation clause will not be applicable in
case of Supplier / Contractor has opted for Composition Scheme under GST.
5.11 Supplier/Contractor should charge GST in Invoice at the rate as agreed to mention in
acceptance of Bid only and any deviation in the same shall not be accepted. Further, any
additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account of
GST charged from the company; such refund shall have to be passed on to the company,
along with interest if any. Such refund along with interest needs to be passed on suo-moto by
the supplier / contractor.
5.12 Further, the Company has a right to recover the amount of GST along with penal interest
at the rate of 15% per annum if GST charged is not paid / short paid to the government or fail
to upload the details or uploads inaccurate particulars on GSTIN portal by the Supplier /
Contractor within the stipulated time limit.
5.13 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of UGVCL’s statutory variation clause shall apply.
5.14 Input Tax Credit Benefit In the event of any statutory increase in the rate of Input Tax
Credit and / or due to inclusion of any other additional item of their inputs/input services
under the ambit of the Input Tax Credit provisions under the GST Act, subsequent to the date
of submission of the offer, the same should be passed on to COMPANY and you should
inform such changes to COMPANY from time to time
6) Statutory Variation / Changes in taxes
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Any statutory increase or decrease in the taxes and duties including GST and Cess as
applicable or in the event of introduction of new tax/cess or cessation of existing tax/cess in
the taxes subsequent to your offer if it takes place within the contract period will be UGVCL
account subject to the claim being supported by documentary evidence. However, if any
decrease takes place during contract period the advantage will have to be passed on UGVCL.
Statutory Variation clause shall not be applicable in case of Supplier / Contractor has opted
for Composition Scheme under GST.
7) Taxes, Permits & Licenses
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed against
the Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
8) INCOME TAX –TDS & GST-TDS
“Income-tax at source GST-TDS at the prevailing rate will be deducted from bills in
accordance with the provision of Income-Tax Laws and to that effect a certificate will be
issued to the contractor, however added as contractor has to submit separate invoice for
supply parts item as well as works part item separately, otherwise TDS will be deducted on
entire invoice value.”
Applicable welfare cess will be deducted from contractors each bill by UGVCL to pay the same
to the respective Govt. Department. Tax will be deducted as per applicable statutory rules.
Contractor should quote accordingly i.e. inclusive of welfare cess.
Welfare Cess:
As per Welfare Cess Act, the welfare cess @ 1% is applicable and same is considered in price
THE WELFARE CESS WILL BE PAID TO CONTRACTOR ON ACTUAL WORK EXECUTED AMOUNT AS
PER CONTRACT.
The amount of welfare cess @ 1% of total bill amount is to be withheld from contractor
running bill in case of challan copy is not submitted along with invoice and will be released on
submission of challan of depositing the welfare cess amount to respective department.
The contractor shall deposit 1% welfare cess as applicable to respective government
department. UGVCL shall pay the welfare cess by way of reimbursement to contractor on
production of documentary evidence of payment deposited thereof by contractor.
The modality of payment/reimbursement of welfare cess will be as under:
[a] On receipt of A/T, the contractor/ bidder will get them registered under Welfare Cess Act
and submit the documentary evidence to the concerned office.
[b] Before release of payment of first R.A. Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
[c] Before release of payment of subsequent R.A. Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A. Bill.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
[d] Before release of payment of Final bill, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A. Bill as well as of final bill on final bill
amount certified by UGVCL.
[e] Before release of payment in case of 1st & Final Bill, the contractor has to deposit the 1%
welfare cess on bill amount as certified by UGVCL and shall submit the documentary
evidence of payment deposited thereof.
[f] The contractor shall produce the receipt of payment of welfare cess from the respective
Government Department before submission of final bill otherwise final bill of the work
will not be finalized. Welfare cess payment will be reimbursed on production of evidence.
9) Jurisdiction:
Any dispute of differences arising under out of or in connection with the contract shall be
subject to the exclusive jurisdiction of KALOL.
Addressing Tenders: Tenders must be submitted in envelops which must be properly sealed
by the tenderers with their office seal and must be super scribed with the following.
(a) Tender No and the name of the proposed work.
(b) Returnable date and time of tender. It is the responsibility of the tenderer to see that the
tenders are received in company office or tender box within the stipulated time and date. The
envelop must bear full address of the tenderer.
10) Additions and alterations of any kind in tender forms, conditions etc by the bidder without
the consent of the undersigned are not permissible.
a. The bidder must quote his rate per unit specified in the schedule in figures as well as in
words. If there is difference between rates quoted in words and figures, rates quoted in
words shall prevail.
b. The bidder must quote his rates net lowest and the rates not confirming to the unit
specified in schedule may not be considered even though they may be lowest.
c. The rates must be stated for each item separately and in addition percentage of reduction
in the total price if any should also be quoted.
d. Any variation in rates etc will not be allowed on any ground once the tender submitted is
opened for consideration.
11) The rate quoted should be in percentage higher /lower / rate to rate.
12) The company’s general conditions of contract will apply to all the contractors and he is
deemed to be fully aware of the company’s general conditions of contract for the works
in respect of security deposits, penalty for late completion of work etc and any ignorance of
these conditions will not exempt the contractor from the liability to abide by the same.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Submission of a tender by the bidder implies that he has read that the instructions and
conditions of contract contained in booklet and has made himself aware of the scope and
specification of the work to be done and of the conditions and rate at which stores etc. will
be issued to him and local conditions and other factors bearing on the execution of work.
If the contractor stands lowest for more than one tender it will be at the discretion
of the competent authority whether to award more than one work or not without assigning
any reason thereof.
13) In case of any discrepancy between Tender Document condition and the General Conditions
of Contract attached to Tender Document, the condition mentioned in tender document is
14) Any amount payable by UGVCL / Any Circle Office of UGVCL / Any Division office of UGVCL
under any order / sub work order to the contractor can be adjusted against amount
receivable by UGVCL / Any Circle Office of UGVCL / Any Division office of UGVCL / GUVNL or
any of its subsidiary company. The contractor will have no objection whatsoever for the
15) Safety:-
Before starting any work by the labour of the contractor, it will be the responsibility of the
contractor to obtain line clear from the concerned officer / employee.
Successful Bidder has to follow all the rules and Regulations of Work Safety. Required tools and
Tackles for Safety are to be arranged by Bidder only.
No any work should be carrying out without supervisor of the company for safety point of
view. Contractors should observe all the safety rules during execution of work.
The contractor will have to see that labours working on the site should utilize all safety
equipment like helmet, safety belt, hand glows, safety shoes and tool-tackle. If any labour
found without safety equipment at site during execution of work, it is fully responsibility of
contractor for any accident occurred.
The contractor has to follow all labour laws, safety rules and regulations. The UGVCL does not
take any responsibility in case of accident or injury to the workers. The safety, security of
men, materials and equipment shall be sole responsibility of the contractor.
The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and that of
local body is a must condition for the successful bidder.
The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his Supervisors
and labours to execute the work mentioned in Tender. On violating or breaking the Safety
Rules and Regulations, and if Supervisors/Labours are found without Safety Gadgets, “The
Company” reserves the right to take actions as per the terms and conditions mentioned in
Tender without any prejudice.
The Company is not liable for any injury or damage to contractor’s workman or his
equipment respectively during execution of this contract and the Company will not pay
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
any compensation for any reasons whatsoever. The contractor is also responsible for any
damage to private property i.e. standing crops in farms or Gram Panchayat property etc.
16) The contractor shall not demand or accept any help from the intending consumers in line
erection works or in transportation of materials.
17) Whenever there is an excess work carried out by a contractor beyond the technically
sanctioned amount against the work order given, the approval for the excess quantity of
work done should be obtained from the competent authority as per Company rules.
18) The erection work should be started from the date of commencement given in the
order and should be completed within the prescribed period for each work. The
contractor is bound to complete the work within the specified period of each separate work
order given by Executive Engineer.
The contractor will be given the separate order for each work on the basis of the rate
contract order. The date of commencement and date of completion of work will be
mentioned in the order, which the contractor has to agree; otherwise the penalty will be levy
for the late completion of work as per Clause No.-32.
19) Priority of work would be decided by the Executive Engineer / Deputy Engineer of SDn and
contractor shall carry the work within the stipulated period of the order given by the
Executive Engineer.
20) You will have to submit fortnightly progress report regularly in duplicate to Engineer In
Charge and Executive Engineer KALOL DIVISION. If found that the work is unsatisfactory or
not progressing as per schedule then any action would be taken by the UGVCL as may
deemed fit to see that work is completed at the risk and cost of contractor. The completion
time allowed for each Sub work Order shall be strictly observed.
21) The contractor must have adequate resources and manpower of skill/unskilled personnel to
undertake the work at different places simultaneously.
22) The contractor will submit the final bill/ sub-work order bill within one months from the work
completion date.
23) The payment will be release within thirty days after submission of bill and all relevant
documents with invoice or part thereof whichever is later.
24) The contract will remain in force for the period of 02 year from the date of issue of work
25) TERMS OF PAYMENT:
a) The payment will be made to the contractor by ECS/RTGS/NEFT subject to an advance
stamped receipt being received from payee.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
b) The payment will be done after successful completion of scope of work of each sub-work
order after furnishing of the material accounts.
c) Mode of Payment: All payments under the Contract shall be made after the issue of work
certificates by the Engineer in charge, for the quantum of work completed.
d) Deductions from Contract: Price All costs, damages or expenses which the Owner may have
paid, for which under the Contract the Contractor is liable, or any other retention award will
be claimed by the Owner. All such claims shall be billed by the Owner to the Contractor
regularly as and when they fall due. Such bills shall be supported by appropriate and certified
vouchers or explanations, to enable the Contractor to properly identify such claims. Such
claims shall be paid by the Contractor within thirty (30) days of the receipt of the
corresponding bills and if not paid by the Contractor within the said period, the Owner may
then deduct the amount, from any amount due or becoming due by him to the Contractor
under the Contract or may be recovered by sections of Law or otherwise.
e) Terms of Payment: The owner shall pay to the Contractor as per the terms of payment
mentioned hereunder:
1. The bidder shall raise sub work order wise bills only after completion of all the specified
activities complete for each sub work order and the work for the next stage is continued.
2. 100% of the bills will be processed and paid within 30 days after submission bills at Sdn
with all relevant documents.
3. Payment of last sub work order shall be made after the work order is completed and the
line is handed over and accepted by the Engineer – in- Charge in all respects subject to
furnishing of performance guarantee of equivalent amount for the guarantee period.
4. The order value is based on the quantity, unit rates and values quoted and shall be subject
adjustment based on actual quantities executed and certified by the Engineer – in – Charge.
5. Payment of the actual material used and work done will be paid on above basis.
26) Presentation of Bills
The bills along with required documents for work executed including cost of material
consumed is to be prepared in Quadruplicate and submitted 03 copies to the concern Deputy
Engineer of Sub Division Office. These bills shall be serially numbered.
Contractor has to submit Bills along with required documents for work executed including
cost of material consumed material account along with quantities of work executed for each
item. Location wise inventory of all the material used is to be submitted in detail. All required
documents including EPF should be produced by the contractor along with bills.
Work Completion certificate duly signed by Contractor for which Bill is submitted.
For non-submission or part submission of above information, no bills shall be processed.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
27) Recording of measurements
If the work has been carried out satisfactorily, the contractor with prior intimation from the
Company Officers shall have to witness the inventory on the appointed date within the
days of the completion of work. If contractor fails to come to the appointed date a notice
under Registered cover with A.D. will be served on him to witness the recording of
inventory prior appointment with the Company officer within ten days of receipt of notice or
within such extended period applied for by the contractor and granted by the Company
Officer. If the contractor still fails to come for the recording of inventory within the original
or extended period of time granted by the Company officer then the recording of inventory
and recording of measurements thereof will be carried out thereafter unliterary by the Company
Officer and the same shall be finalized by the Company’s Officer and the same shall be binding
on the contractor, no request then will be entertained.
28) Submission of materials account by contractor:
The contractor shall submit material account with each bill. Also he shall on completion of the
work have to prepare and render the final detailed material account of the materials
received by him from the Company store within 15 days from the date of inventory, if
however the contractor does not render the material accounts a notice shall be issued to the
contractor under Registered A.D. to render the materials account within ten days from the
date of issue of the notice. On default, the material account will be finalized and the recovery
made as per the Company account and procedure which shall have to be accepted by
contractor and disputes if any raised shall not be entertained. The balance materials also will
have to be returned by the contractor within 7 days from the date of technical scrutinity from
Division office.
Material Accounting for work duly certified by Engineer- In-charge.
The contractor will not be allowed to transfer materials from one work to another without
the written permission of the Executive Engineer justifying the reasons for such transfer.
The contractor will have to use the materials on the work for which they have drawn.
29) On completion of work the contractor will inform the concerned DE in writing and DE will see
that if any rectifications are to be required, will intimate to the contractor within 15 days in
writing from the date of receipt of the letter from the contractor to complete the rectification
works within 7 days. If the contractor fails to do the rectification additions or alterations etc
within the above time limit, then the same will be got done through other agency or
departmental staff at the risk and cost of the contractor without giving any further notice
or any intimation. No complaint will be entertained from the contractor in this regard
and amount will be recoverable with 15% supervision charges.
30) Contractor has to take Earthing & utilization of CC Block in stay set certificate from the UGVCL
supervisor (Line Staff) and it is to be submitted along with the final bill.
31) Audit Inspection
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
UGVCL reserves its right to carry out random and surprise inspection at any time of the
ongoing work / completed work for ensuring its quality and compliance with the REC
standards OR CEA construction standards OR any Indian Standard OR Technical specifications
of UGVCL. If during such audit inspection, any violation of Standards OR Safety regulation is
observed, which may be unsafe for the general public or for the employee of Distribution
licensee, UGVCL shall intimate the Contractor immediately by any written communication
medium (either through mail / letter) and on such intimation, the contractor shall rectify such
defects, within such period, (as may be specified by the UGVCL, depending upon the quantum
of such defects) and shall submit the written report along with site photographs indicating
such rectification to the Engineer In-Charge. Nevertheless, following actions shall be taken
against the Contractor on detection of substandard work.
31.1 On first instance, a stringent penalty of 3% of total value of Sub-work order shall be imposed. In
addition to the above, if the contractor fails to rectify the substandard work despite being
served the legal notice under clause 31, UGVCL shall get the work rectified through the other
contractor and shall recover the total expense incurred for such rectification including labour
and any other amount paid to the other contractor as the case may be which it has to incur for
such rectification.
31.2 On detection of second instance of Substandard work in the same work order OR in different
work order(s) under jurisdiction of UGVCL, the defective/substandard orders shall be
terminated by following procedure as mentioned in tender terms and conditions in addition to
the actions as mentioned above in Clause 31.1.
31.3 On detection of third instance of Substandard work in jurisdiction of entire UGVCL by same
contractor during the last three years, the Contractor shall be stop-dealed after following
due procedure and after giving opportunity to represent as per principles of natural justice.
Definition of Substandard work
The work executed by the Contractor, which is not in compliance to the REC Construction
standards or CEA Construction Standards or any Indian standards (IS) OR violates the provisions of
GERC Distribution Code or Grid Code or CEA Safety regulations or in contradiction to any tender
condition as amended time to time, shall be considered as Substandard work
32) PENALTY
32.1 The time limit allowed for carrying out the work as entered in Bid shall strictly observed by
the contractor. The work shall throughout the stipulated period of contract proceeds with
due diligence (time being essence of the contract).
32.2 The execution of this contract shall be completed within 24 months after commencement
period of 30 days from the date of letter of acceptance (LOA).
32.3 If the work is not completed within the scheduled period as prescribed in Sub Work Order,
penalty shall be @ 0.5% per Week or part thereof plus applicable tax (if any) subject to
ceiling of 10% plus applicable tax (if any) of the Sub Order Value with GST and Cess as
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
applicable rates. This will be deducted from the bills payable either against this contract or
any bank guarantee or any other amount payable under any contract with the UGVCL.
32.4 For calculating delayed portion, start date of sub work order for penalty calculation will be
the Day / Date on which the major material issued against the Sub work order and final
date of actual completion of work shall be consider. The penalty will be invariably deducted
from the bill of the contractor and no refund will be given unless the competent authority
approved the waiver/ reduction in penalty. In case of material supplied late by UGVCL to the
contractor, clause no. 32.11 shall be applicable.
32.5 The concern field office of KALOL Division / SABARMATI Circle will issue sub work order as a
part of contract as per requirement. The work completion period of each sub work order will
be decided by concern Engineer-in-Charge from the date of issue of sub work order. The
delay of commissioning is liable for penalty.
32.6 Penalty for non-submission of bills timely: Sub work order wise bill along with excess
material credited to store to be submitted by contractor within 30 days from the date of work
completion. If the bill for the work, after reconciling inventory given to contractor and
depositing back the surplus material to respective RSO / Divisional Stores, is not submitted
within one months from the work completion date as per work completion date, then penalty
@ Rs. 500 per week or part thereof plus applicable GST subject to maximum of 10% of Sub
Work Order value plus applicable GST will be deducted.
32.7 Penalty for violating safety rules: During the execution of Work, if Contractor/Labour are
found violating the Safety rules and Regulations, then Engineer-in-Charge will serve the
warning Notice on first Instance. On second Instance the amount of Fine will be Rs.
or 0.1 % of amount of SWO (Whichever is higher) with GST and cess. Even If after above two
instances, still Contractor found violating Safety Rules and Regulations then Procedures for
Stop dealing shall be initiated against him as per rules and regulations.
32.8 Further, it is to state that in rainy season and / or for any other reasons beyond the control
of contractor and / or if Municipal Corporation or Nagarpalika or Local Government Bodies
or any other utilities do not allow to execute work or any ROW issues; stoppage period will
be allowed for such period subject to submission of representation with documentary
evidences. Stoppage Period will be approved by next higher authority of order approving
authority.
32.9 FORCE MAJEURE CLAUSE”
“If, at any time during the continuance of this contract, the performance in whole or in part
by either party of any obligation under this contract shall be prevented or delayed by reason
of any war, hostility, act of the public enemy, civil commotion, sabotage fires, floods,
explosion, epidemics, quarantine restrictions, strikes lockouts or acts of God (hereinafter
referred to as event)”, then provided notice of the happening of any such event is given by
either party to the other within twenty one days from the date of occurrence there of neither
shall have any claim for damages against the other in respect of such nonperformance of
delay in performance, and deliveries under the contract shall be resumed as soon as
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
practicable after such event has come to end or ceased to exist, and the decision of the
Managing Director as to whether the deliveries have been so resumed or not shall be final
and conclusive.
32.10 Extension in Contractual Period:
It will be Contractor’s responsibility to ensure that work is completed in stipulated time limit.
However, if on account of reasons beyond one’s control as laid down in the Force Major
Conditions, UGVCL may consider extension of contractual period with or without statutory
variations and with or without price variation.
32.11 Work completion period shall be reckoned from date of issue of material for particular sub
work order. However, decision of Executive Engineer of division with Supt. Accountant (Exp.)
will be authorized for finalization of work completion period if any dispute.
32.12 In case, it is not possible for the successful bidder to continue the work either due to heavy
rains or other reasonable causes, such facts should be immediately brought to notice of the
Engineer In Charge. If the reasons for stopping the work are genuine the Engineer In Charge
may ask the successful bidder to start the work again as per condition. The period of such
stoppage will not be considered as a part of working days moreover the successful bidder
cannot claim compensation for such stoppage.
32.13 It will be the responsibility of the contractor to intimate the closing down and
recommencement of work at all stages to the engineer in charge or vice versa in writing with
reason for the closing down of the work with specific of days for which work will remain
32.14 In case of failure on the part of the contractor, his claim for extension of time limit will be
entertained with penalty.
32.15 In case, intimation is not given in these regard, the reason for delay will not be accepted.
32.16 However, time limit extensions will be considered only after execution of the sub work order
fully and upon submission of documentary evidence for the reasons of delay. Extension of
Contractual period will be approved by next higher authority of order approving authority.
32.17 However, time limit extensions will be considered only after execution of the contract fully
and upon submission of documentary evidence for the reasons of delay.
32.18 In case of extra ordinary situation like COVID-19 Pandemic or any lockdown situation or rainy
season etc. force majeure clause will be applicable and stoppage period in execution of work
may allow, if required.
33) FORCE MAJEURE
Force Majeure means any circumstances beyond the control of the parties including:
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
33.1 War and other hostilities, (whether war be declared or not), invasion, act of foreign enemies,
mobilization, requisition or embargo;
33.2 Ionizing radiation or contamination by radioactivity from any nuclear fuel or from any nuclear
waste from the combustion of nuclear fuel, radioactive toxic explosive, or other hazardous
properties of any explosive nuclear assembly or nuclear components thereof;
33.3 Rebellion, revolution, insurrection, military or usurped power and civil war;
33.4 Riot, commotion or disorder, except where solely restricted to employees of the Contractor.
33.5 Neither party shall be considered to be in default or in breach of his obligations under the
Contract to the extent is that performance of such obligations prevented by any circumstances
of Force Majeure that arise after the date of the Notification of Award.
33.6 If either party considers that any circumstances of Force Majeure have occurred which may
affect performance of his obligations he shall promptly notify the other party.
33.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor shall endeavor to
continue to perform his obligations under the Contract so far as reasonably practicable. The
Contractor shall notify the Engineer-in-Charge of the steps he proposes to take including any
reasonable alternative means for performance, which are not prevented by Force Majeure. The
Contractor shall not take any such steps unless directed so to do by the Engineer-in-Charge.
33.8 If circumstances of Force Majeure have occurred and shall continue for a period of 180 days,
notwithstanding, the Contractor may by reason thereof, having been granted an extension of
Time for Completion of the Works, either party shall be entitled to serve upon the other,
days’ notice to terminate the Contract. If at the expiry of the period of 30 days Force Majeure
shall continue, the Contract shall terminate.
34) Rate to be deducted for not carrying out the work.
a) If Feeder name is not done as per standard specifications due to negligence from contractor
side in that case rate will be deducted from the contractor bill as per UGVCL Rate.
b) Charges for mounting distribution boxes are including in erection of T/C. If distribution box
with wiring is not issued by UGVCL in that case rate will be deducted from the Contractor
bill as per UGVCL Rate.
c) If Transformer is not mounting then actual expenditure of Transformer replacement on
going contract rate for mounting transformer will be deducted from the bill.
d) If earthing of pole or DP structure is not found in a separate pit as per standard then such
bill will not be recorded.
e) Lighting arrestor must be installed otherwise bill will not be recorded.
f) All empty conductor drums will have to be returned by the contractor at concern Divisional
Stores, failing which Rs.500/- per drum will be recovered.
g) GST at the applicable rate will be added to rates / amounts mentioned above.
35) Tax deducted at the source (TDS) under Income Tax and under Goods and Service Tax Act will
be deducted from bill as per applicable rate, if applicable.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
36) ARBITRATION:
All questions, disputes or differences whatsoever which may at any time arise between the
parties to this agreement touching the agreement or subject matter thereof, arising out of or in
relation there to and whether as to construction or otherwise shall be referred to the decision
of the Sole Arbitrator, as appointed by the MD of COMPANY, for that purpose, who shall be a
retired High Court Judge or retired District and Sessions Judge, and the decision of the said
Arbitrator shall be final and binding upon the parties. Reference to the arbitration shall be
governed by the provisions of Indian Arbitration & Conciliation Act. 1996 as amended from
time to time and the rules made there under.
37) If any work not carryout out satisfactory deduction will be made as per prevailing cost data.
However Executive Engineer – KALOL DO is the final authority and decision will be acceptable
Executive Engineer – UGVCL KALOL DO has full right to accept or reject any tender without
assigning any reason.
All the successful tender has to carried out the work under UGVCL competency as per
assigned by competent authority.
38) REVIEW OF ORDER
The company reserves the right to reduce the quantity, if required.
39) CARTEL:
If, the Company during the procurement process, observes or suspects any activity on the part
of bidders or obtains any knowledge which indicates the existence of cartel formation amongst
the bidders or apprehends the possibilities of cartel as defined under The Competition Act,
2002, the Board of the Company being a government Company involved in public procurement
work, reserve all rights to allot quantities to such bidders, who are not part of the cartel, in any
manner deemed fit in the interest of the Company without assigning any reason thereof.
Besides the above the purchaser Company, may initiate actions under the Competition
Act/other laws and / or the bidder(s)/ firm(s) will be black listed / stop deal, at its sole
discretion.
40) Evaluation of Tenders:-
Tenders shall be called for in two bids: (1) Techno-commercial Bid and (2) Price Bid.
The price Bid of Techno-commercially qualified Bidders will be opened.
For modification or relaxation in Techno-commercial Conditions after Technical Bid is opened,
all Bidders shall be given equal opportunity.
41) Price Evaluation:-
No price preference shall be given on any account. All tenders must be submitted firm price
basis (Inclusive of all Taxes) and lowest evaluated bid in the interest of the UGVCL, for the
complete works covered under these specifications and documents.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
If more than one party is to be considered for placement of order, they will have to match their
may go to the L-2, L-3 and so on depending upon the requirement at UGVCL’s sole discretion. If
Inviting Authority) decision shall be final and binding on all the parties.
In case of bid found quoted with abnormally low rates, UGVCLs may reject the offer at its sole
discretion after examining quality and resources of bidders with due approval of next higher
authority.
42) If work is not started / completed within stipulated time limit period, then contract be short
closed with applying risk purchase and Security Deposit is to be forfeited with put on black
listing or stop deal for the period decided by the competent authority.
43) QUANTITY DISTRIBUTION
43.1 The total quantity distribution to the new bidders will be restricted up to 30% of the estimated
amount in case of new bidders stands L-1. However, if the quoted price of new bidders is higher than
regular bidders, then there will be no any quantity distribution is allowed to new bidders.
43.2 The competent authority of the UGVCL as per delegation of power shall decide to consider nos. of
bidders for placement of order under ARC, at its own discretion and considering field requirement.
43.3. The New bidder is to be asked to match the L-1 price of the New Bidder only and the regular Bidder
has to match the L-1 price of the Regular Bidder.
43.3.1 If L-1 New Bidder below company SOR Rate then regular Bidder restricted up to Company SOR Rate
43.3.2 If L1 is New bidder above company SOR Rate Then Regular Bidder Should match with L-1 Bidder.
In case of L1 bidder backs out from tender process before allotment of order or during tender process, UGVCL
has right to call next lowest bidder/bidders to execute work according to Clause no-43.3.
(Note: The said clause is applicable to the ARC tender. If tender is invited with value more than Rs. 5 Lakhs
for specific single work, experience criteria may be kept in line with Important instruction for submitting the
Tender Clause No: 3, Technical & Commercial. Accordingly, this clause may be adopted / deleted while
inviting tenders).
44. CONTRACT QUALITY ASSURANCE:
44.1 The Bidder shall include in his proposal the Quality Assurance Program containing the overall
quality management and procedures which he proposes to follow in the performance of the
Works during various phases as detailed in relevant clause of the General Technical
Conditions.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
44.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for
the execution of the Contract. UGVCL reserve the right to inspect the work at any stage of
contract i.e. during the execution and after the execution of work.
44.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items (if
any) are being supplied. Such details shall be accompanied by their list of previous supplies
made performance reports etc. However, in case of orders are placed, specific approval shall
be obtained from the UGVCL for the vendor supplied materials. The quality assurance
program shall be furnished for each material separately for approval.
45. SECRECY:
The technical information, drawings, specifications and other related documents forming part
of the enquiry or Contract are property of UGVCL and shall not be used for any other purpose,
except for the execution of the contract. All rights related to the technical specifications,
drawings and records are reserved by UGVCL only and no part or partial should be
reproduced, copied or alter without prior permission to UGVCL in writing. In the event of the
breach of this provision, UGVCL can claim the damages caused by such events.
46. Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
46.1 Has submitted fake, false or forged documents/certificates.
46.2 Has revised/withdrawn price bid after opening of Techno: commercial bid, until and unless
it is sought for.
46.3 Has tampered with the stipulated tendering process.
46.4 Has refused to accept Letter of Acceptance/Purchase Order/Work Order after the same is
issued by the Company within the validity period and as per agreed terms and conditions.
46.5 Has committed breach of contract or has failed to perform a contract or has abandoned
the contract.
46.6 Has failed to provide suitable expertise for the work as per prescheduled program
46.7 Has failed to submit all the necessary Test reports/documents within time schedule / as
per Company's time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is
placed subject to submission of type reports / documents to the firm.
46.8 Has indulged in construction and erection of defective works.
46.9 Has supplied inferior quality / defective materials and refused to replace with stipulated
time frame, as specified by the company.
46.10 Has substituted materials In lieu of materials supplied by the Company or has not
returned or has short returned or has unauthorized disposed of materials/ documents/
drawings/ tools or plants or equipment supplied by the Company
46.11 Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage
46.12 Has unauthorized obtained official company information or copies of documents, in
relation to the Tender/Contract
46.13 Has failed to follow the stipulated mode of communication, if specified by the tendering
authority/ purchaser.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
46.14 Any other ground for which in the opinion of the Company makes it undesirable to deal
with the Firm, and
46.15 In case the State Government directs the Company to place a firm in stop dealing/ banned
for business dealing/ blacklisting
46.16 The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or any
subsidiary Companies of GUVNL shall be considered as a stop deal and/ or banned for
business dealing and/ or blacklisting for all Companies.
47 Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing are as
47.1 The proprietor/all the partners/directors of the stop deal/ banned for business dealing/
blacklisting firm shall also be considered for stop deal/ banned for business dealing.
47.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in the
list of Stop dealing / Banned for business dealing in any Company of GUVNL and its
Subsidiary Companies,
I. No enquiry shall be issued to a firm.
II. No bids / tender shall be considered for evaluation and the bid submitted by
the Firm shall be returned.
47.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put on
Stop dealing/ Banned for business dealing by GUVNL or any of its subsidiary Companies,
during tender process: -
I. Before opening Technical bids, the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected Bid” at the time of
scrutiny of Preliminary / Technical Bid.
II. After opening Technical bid but before opening the price bid, the price bid of
the Firm should not be opened and the bid submitted by the Firm will be
treated as “Disqualified Bid” and automatically stand as “Rejected Bid” at the
time of scrutiny of Technical Bid.
III. After opening of price bid, the offer of the Firm should be ignored and will not
be further evaluated. The Firm will not be considered for issue of order even if
its price is the lowest. In this situation, the next lowest bidder shall be
considered as L1.
IV. The BG/EMD submitted by the Firm with tender should be returned after
obtaining confirmation from GUVNL and its other subsidiary Companies that
there are no outstanding dues recoverable from the firm.
47.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and is already
executing work and/ or Letter of Acceptance/ purchase order awarded to them by another
Company, then the firm should be allowed to complete such awarded work / supply.
47.5 The amount of EMD/SD/ any payment against supply withheld at the instance of GUVNL or
any of its subsidiary Companies shall be appropriated against the dues recoverable from the
firm by GUVNL or any of its subsidiary Companies. EMD/ SD/ PG in the form of bank
Guarantee shall be encashed and appropriated.
47.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm is put
on Stop dealing/ Banned for business dealing, all the manufacturing works of the Firm shall
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
be on Stop dealing/ Banned for business dealing for GUVNL and its Subsidiary Companies &
for all Services of the Firm.
47.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary Concern,
then all the Concerns of the same Proprietor shall also be considered to be on Stop Dealing/
Banned for business dealing.
47.8 The Board of Directors of the concerned Company may however, if he considers it to be in
the interest of the Company, remove the ban in respect of any specific Service from any
Contractor for that Company only.
47.9 Every bidder should, at the time of submission of bid, give a declaration as per Annexure-F
attached with this Tender, that bidder and/or proprietor/ partner/ director of the firm has
not been placed on Stop dealing / Banned for business dealing / blacklisting by GUVNL and
it’s any Subsidiary Companies.
48. Relationship with employee:
Every bidder should, at the time of submission of bid, give a declaration as under,
“If in any Bidder Company/firm, the interest(i.e. shareholding in company and share in
partnership firm) of any employee of the tendering company or his/her relative as defined in
section 2(77) of the company’s Act 2013 is 10% or more, the tendering Company will not deal
with such Company/Firm at all.
Bidder therefore, must specifically disclose this fact in his technical bid. Non –disclosure of such
facts would immediately disqualify the Bidder for further dealing with the tendering Company”
49. Usage of “Call Before you Dig” application:
“Permission letters granted online/offline for enforcing use of ‘Call Before U dig’ mobile
application for any work involving excavation activity.” (Contractor/Bidder has to register
themselves as Excavator/Digger in “Call before you Dig” application and for any
excavation/digging work, contractor has to take permission/NOC from “Call before you Dig”
application)
50. GUARANTEES
The Contractor shall guarantee in accordance with the Contract documents and free from
defects in material/equipment supplied by contractor like Indoor / Outdoor / Joint kits, HDPE
Pipes etc. and workmanship for a period of twelve (12) calendar months from date of
completion of sub work order by contractor. For the same, sticker must be provided
incorporating Date of Installation and due date of guarantee on materials used by Successful
51. Defense of Suits:
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner,
for the failure, omission or neglect on the part of the Contractor to perform any acts, matters,
covenants or things under the Contract, or for damage or injury caused by the alleged omission or
negligence on the part of the Contractor, his agents, representatives or his Sub-Contractors, or in
connection with any claim based on lawful demands of Sub-Contractors, workmen, suppliers or
employees, the Contractor shall in all such cases indemnify and keep the Owner, and the Engineer
and/or his representative, harmless from all losses, damages, expenses or decrees arising of such
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Tender Notice No KLL-DO-05-2026-27 / SR NO-3 PR NO:- 664908 / RFQ NO:-
Schedule – B
Annual Rate Contract Tender for Erection, Maintenance and Dismantling work of Overhead HT/LT LINE, TC &
HT/LT AB Cable including MVCC work & Plinth work under CHHATRAL S/Dn, KALOL DO
Sr. Description of work Estimate Unit Rate Amount in
No. Qty. Rs.
1 HT Tapping from the Existing Pole including 100 No 459
Fixing of Cross Arms, Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
GUY set and Earthing
2 Erection of PSC POLES of 8 Mtr X 200 KG 100 No 1113
including Fixing of PIT and refilling of Earth,
fixing of cross Arms, Top Fitting Clamps Anti-
Climbing Devices, Danger board, Insulators,
ETC. complete and Painting of Fabricated
materials and numbering of pole, complete As
per standard specification but excluding
erection of GUY set and Earthing .
3 Erection of PSC POLES of 10 Mtr X 270 KG 100 No 2466
including Fixing of PIT and refilling of Earth,
fixing of cross Arms, Top Fitting Clamps Anti-
Climbing Devices, Danger board, Insulators,
ETC. complete and Painting of Fabricated
materials and numbering of pole, complete As
per standard specification but excluding
erection of GUY set and Earthing .
4 Erection of Steel Poles of 9 Mtr to 11 Meters 5 No 1865
including Fixing of PIT and refilling of Earth,
fixing of cross Arms, Top Fitting Clamps Anti-
Climbing Devices, Danger board, Insulators,
ETC. complete and Painting of Fabricated
materials and numbering of pole, complete As
per standard specification but excluding
erection of GUY set and Earthing.
5 Erection of Steel Poles of 13 Meters including 5 No 2137
Fixing of PIT and refilling of Earth, fixing of cross
Arms, Top Fitting Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
GUY set and Earthing
6 Erection of Double POLES structure of 8 Mtr X 10 No 2530
200 KG PSC Pole including Excavation of PIT
and refilling of Earthing, fixing of Channels,
Supporting Angles, Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
GUY set and Earthing (Without AB Switch)
7 Erection of Double POLES structure of 10 Mtr X 10 No 5320
270 KG PSC Pole including Excavation of PIT
and refilling of Earthing, fixing of Channels,
Supporting Angles, Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
Complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
GUY set and Earthing (Without AB Switch)
8 Erection of Double POLES structure of 9 Mtr To 2 No 3655
11 Meter Steel Pole including Excavation of PIT
and refilling of Earth, fixing of Channels,
Supporting Angles, Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
Complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
GUY set and Earthing (Without AB Switch)
9 Erection of Double POLES structure with 10 No 3042
mounting of AB Switch, HG Fuses of 8 Mtr X
200 KG PSC Pole including Excavation of PIT
and refilling of Earth, fixing of Channels,
Supporting Angles, Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
GUY set and Earthing
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
10 Erection of DOUBLE POLE structures with 25 No 9808
mounting of AB Switch, HG Fuses,
Transformers, Lightening Arrestors,
Distribution BOX ETC. of 10 Mtr X 270 KG PSC
Pole including Excavation of PIT and refilling of
Earth, carting of Transformers from Store to
Site, Fixing of Channels, Supporting Angles,
Clamps Anti-Climbing Devices, Danger board,
Insulators, ETC. complete and Painting of
Fabricated materials and numbering of pole,
complete As per standard specification but
excluding erection of GUY set and Earthing.
11 Erection of Double POLES structure with 1 No 3990
mounting of AB Switch, HG Fuses of 9 Mtr TO
11 Meter Steel Poles including Excavation of
PIT and refilling of Earth, fixing of Channels,
Supporting Angles, Clamps Anti-Climbing
Devices, Danger board, Insulators, ETC.
complete and Painting of Fabricated materials
and numbering of pole, complete As per
standard specification but excluding erection of
GUY set and Earthing.
12 Erection of Double POLES structure with 1 No 4531
mounting of AB Switch, HG Fuses of 13 Meter
Steel Poles including Excavation of PIT and
refilling of Earth, fixing of Channels, Supporting
Angles, Clamps Anti-Climbing Devices, Danger
board, Insulators, ETC. complete and Painting
of Fabricated materials and numbering of pole,
complete As per standard specification but
excluding erection of GUY set and Earthing
13 Erection of SINGLE POLE structure with 5 No 3244
mounting of AB Switch, HG Fuses,
Transformers, Lightening Arrestors,
Distribution BOX ETC. of 8 Mtr X 200 KG PSC
Pole including Excavation of PIT and refilling of
Earth, carting of Transformers from Store to
Site, Fixing of Channels, Supporting Angles,
Clamps Anti-Climbing Devices, Danger board,
Insulators, ETC. complete and Painting of
Fabricated materials and numbering of pole,
complete As per standard specification but
excluding erection of GUY set and Earthing.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
14 Erection of DOUBLE POLE structures with 25 No 8681
mounting of AB Switch, HG Fuses,
Transformers, Lightening Arrestors,
Distribution BOX ETC. of 8 Mtr X 200 KG PSC
Pole including Excavation of PIT and refilling of
Earth, carting of Transformers from Store to
Site, Fixing of Channels, Supporting Angles,
Clamps Anti-Climbing Devices, Danger board,
Insulators, ETC. complete and Painting of
Fabricated materials and numbering of pole,
complete As per standard specification but
excluding erection of GUY set and Earthing.
15 Erection of DOUBLE POLE structures with 1 No 10151
mounting of AB Switch, HG Fuses,
Transformers, Lightening Arrestors,
Distribution BOX ETC. of 9 Mtr to 11 Meter
STEEL Poles including Excavation of PIT and
refilling of Earth, carting of Transformers from
Store to Site, Fixing of Channels, Supporting
Angles, Clamps Anti-Climbing Devices, Danger
board, Insulators, ETC. complete and Painting
of Fabricated materials and numbering of pole,
complete As per standard specification but
excluding erection of GUY set and Earthing.
16 Erection of GUY SET including Excavation of PIT 100 No 537
and refilling of Earth, AS PER STANDARD
SPECIFICATION WITH STAY CLAMPS, STAY
WIRE, ANCHOR ROAD, TURN BUCKLE, EYE
BOLT, GUY INSULATORE, CC BLOCK ETC.
17 Erection of COIL TYPE/ CI PLATE TYPE 200 No 579
EARTHING INCLUDING COST OF COAL SALT ETC.
BUT WITHOUT COST OF GI WIRE AS PER
STANDARD SPECIFICATION (10kg salt-10 kg
18 STRINGING OF 30MM2 ACSR/34MM2, 55MM2 10 Km 2020
AAA CONDUCTOR FOR 11/22KV & LT LINES
INLCUDING FIXING OF INSULATORS, BINDING
JUMPERING ETC.
19 STRINGING OF DOG. CONDUCTOR (100 mm2 10 Km 4651
ACSR/100 mm2 AAAC) FOR 11/22KV &
INLCUDING FIXING OF INSULATORS, BINDING
JUMPERING ETC
20 PROVIDING GUARDING TO HT LINE/LT LINEON 100 Meter 67
ROAD / RAIL CORSSING
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
21 LT LINE TAPPING SINGLE PHASE (WHERE 100 No 49
ADDITIONAL NUT BOLTS & FABRICATIONS/U-
CLAMPS FITTING IS REQUIRED
22 LT LINE TAPPING THREE PHASES (WHERE 50 No 89
ADDITIONAL NUT BOLTS & FABRICATIONS/U-
CLAMPS FITTING IS REQUIRED
23 Stringing / Laying of overhead LT cable for road 10 No 251
crossing HT line crossing & telephone line
crossing ETC. (PER SPAN)
24 Dismantling of 8 Mtr. PSC POLE in usable 50 No 562
Condition with crediting of fabrication at STORE
& STACKING OF POLE AT SAFE AND ON ROAD
25 Dismantling of 10 mtr psc pole/ 13 MTR. 25 No 1233
GIRDER SIZE 100X150 MM IN USABLE
CONDITION WITH CREDITING OF FABRICATION
AT STORE & STACKING OF POLE AT SAFE AND
ON ROAD SIDE
26 Dismantling of transformer centre (08 Mtr PSC 5 No 4340
Pole) with crediting of fabrication materials &
Transformer at store and safe stacking of pole
at road side with Transformer in same
condition as it was
27 Dismantling of transformer centre (8 Mtr PSC 5 No 2263
Pole) with crediting of fabrication materials &
Transformer at store and safe stacking of pole
at road side. Without Transformer
28 CARTING OF PSC POLE AT DESTINATION (PER 50 L.S. 371
POLE) MORE THAN 4 KM & UP TO WORK
DESTINATION (PER POLE)
29 Replacement of 11 KV PIN INSULATOR by new 25 No 45
pin insulator /Composite Pin Insulator with
30 Replacement of 11 KV DISC INSULATOR WITH 25 No 164
H/W by new Disc Insulator / Composite Disc
insulator As per Specification.
31 Replacement of LT Shackle insulator By New 10 No 34.5
32 Re Fixing OF V cross arm in proper positions. 10 No 70
33 Replacement of V cross arm By New One. 10 No 234
34 Re Fixing of Top fitting arm in proper positions 10 No 35
35 Replacement of Top Fitting Bye New One 10 No 42
36 Straighting of tilted PSC Poles/ RSJ Poles at Pin 10 No 272
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
37 Straighting of tilted PSC Poles/ RSJ Poles at 10 No 315
tension (shackle) Point
38 Re-Jumpering work of HT/LT LINE for SHACKLE 10 Per 94
POLE, TAPPING DO AB SWITCHES AS PER Pole
SPECIFICATION (PER POLE)
39 Erection Of Support pole (PSC/RSJ) for stay (i.e. 20 No 703
stud Pole).
40 PIN REBINDING OF CONDUCTOR & CLEANING 10 Per 26.5
OF 11 KV/22KV PIN INSULATOR AS PER Pole
INSTRUCTION OF ENGINEER INCHARGE (PER
41 PIN BINDING OF CONDUCTOR & CLEANING OF 10 Per 24
LT SHACKLE INSULATOR AS PER INSTRUCTION Pole
OF ENGINEER INCHARGE (PER POLE)
42 Converting Pin Point to Shackle point including 5 No 1781
dismantling & restringing etc including the cost
of Nuts & Bolts
43 Removal / Dismantling of Existing HT/LT line 20 Per 1010
conductor from line 34/55 MM2 and crediting Cond
to store. Conductor has to dismantle from Per
shackle to shackle pole, with minimum nos. of KM
cut piece as instruction of Engineer incharge.
(Per Cond Per KM)
44 Removal / Dismantling of Existing HT/LT line 10 Per 2326
conductor from line DOG 100 MM2 (Above Cond
55MM2 size conductor) and crediting to store. Per
Conductor has to dismantle from shackle to KM
shackle pole, with minimum nos. of cut piece as
instruction of Engineer in charge. (Per Cond
45 Re-stringing of HT & LT line (34 mm2 to 30 1 Wire 106
55mm2) conductor/coated conductor with new per
pin binding (1 Wire per span) span
46 Re-stringing of HT & LT line (Above 55mm2 size 10 1 Wire 106
conductor) conductor /coated conductor with per
new pin binding (1 Wire per span) span
47 Re-stringing of 11 KV Aerial Bunch Cable (All 10 Per 316
size) per Span with labour of fitting of Span
accessories (Per Span)
48 Trimming & Cutting of bigger size of tree 10 Per 475
branches/whole tree obstrutting HT/LT line Day
((During Mass maintenance Activities 8 Hrs per
duration) (Per Day per labour) labour
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
49 Trimming & Cutting of bigger size of tree 10 Per 375
branches/whole tree obstrutting HT/LT line Day
(During Local Maintenance activities) (Per Day per
per labour) labour
50 Trimming & Cutting of tree branches/whole 10 Per 3000
tree obstrutting HT/LT line with minimum 2 Day
Labours & driver with Tree Cutting machine &
Ladder Vehicle (During Mass Maintenance
Activities/Disaster) (Per Day)
51 Numbering of Pole with paint by preparing 100 No 50.5
back ground of one color and have lettering
(height 3’’ *width 0.5’’) as per instruction of EIC
(Color must have ISI mark & to be provided by
contractor)
52 Stringing of 11 KV HT Arial Bunch Cable of any 2 Km 43155
size with fittings of all accessories, i.e. Special
design suspension clamp fixing of cross arm, LT
shackle insulator etc for fixing of Messenger
wire complete, as required and directed by
Engineer incharge.
53 STRINGING OF LT ARIAL BUNCH CABLE (3.5 2 Km 23016
Core) any size with fittings of all accessories,
i.e. Special design suspension clamp fixing of
cross arm, LT shackle insulator etc for fixing of
Messenger wire complete, as required and
directed by Engineer incharge.
54 STRINGING OF LT ARIAL BUNCH CABLE (1 Ph 2 0.5 Km 9208
Wire ) of any size with fittings of all accessories,
i.e. Special design suspension clamp fixing of
cross arm, LT shackle insulator etc for fixing of
Messenger wire complete, as required and
directed by Engineer incharge.
55 Strip type Earthing of XLPE Cable by providing 10 No 1986
and fixing 25*3 mm GI hot dip strip of total
length of stip - 09 Mtr,300*300*10 mm CI
earthing plate, 2'' PVC Pipe of 2 Mtr length;
providing of wood charcoal (25 KG Appx.) and
salt cubes ( 25 KG Appx.) or bentonite powder
(50 KG Appx.) with material. Earthing shall be
as per REC standard and specifications.
56 Fixing of LT Line spacers for LT line 10 No 9
57 Painting/Writing consumer no. on SMB/MMB 10 No 11
(Urban) (with letter size- hieght 40mm and
width 8 mm)
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
58 Painting/Writing consumer no. on SMB/MMB 10 No 21
(Rural) (with letter size- hieght 40mm and
width 8 mm)
59 Replacement of deteriorated/ Providing LT 10 No 1171
distribution Box with new upto 100 KVA
capacity & crediting it to store
60 Replacement of deteriorated/ Providing LT 10 No 2107
distribution Box with new above 100 KVA
capacity & crediting it to store
61 Laying, Testing & commissioning of specially 20 CKM 27624
designed 11 KV AL-59 ACS Rabbit Medium
Voltage Covered conductor as per the technical
specifications (including installation of
accessories)
62 Laying, Testing & commissioning of specially 20 CKM 34778
designed 11 KV AL-59 ACS DOG Medium
Voltage Covered conductor as per the technical
specifications (including installation of
accessories)
Supply & Labour Part
63 PLINTH (3.15*2.90*0.75 MTR(Above Ground)) 2 No 77656.05
FOR MOUNTING 800 KVA X'MER As per
Approved Drawing GUVNL/SE T-3/DE-
2/DISCOM/Std Drawing/623 Date: 21.04.2025
(Item rate including of all materials, labour,
tools & tackles etc.)
64 PLINTH (3.15*3.40*0.75 MTR(Above Ground)) 2 No 91890.26
FOR MOUNTING 1000 KVA X'MER As per
Approved Drawing GUVNL/SE T-3/DE-
2/DISCOM/Std Drawing/623 Date: 21.04.2025
(Item rate including of all materials, labour,
tools & tackles etc.)
65 PLINTH (3.15*3.65*0.75 MTR(Above Ground)) 2 No 100544.47
FOR MOUNTING 1250 KVA X'MER As per
Approved Drawing GUVNL/SE T-3/DE-
2/DISCOM/Std Drawing/623 Date: 21.04.2025
(Item rate including of all materials, labour,
tools & tackles etc.)
66 PLINTH (2.50*2.00*0.55 MTR(Above Ground)) 2 No 30344.28
FOR MOUNTING 3-Way RMU As per Approved
Drawing GUVNL/SE T-3/DE-2/DISCOM/Std
Drawing/623 Date: 21.04.2025 (Item rate
including of all materials, labour, tools &
tackles etc.)
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
67 Concreting of Poles, Guys etc. including cost of 40 CMT 7668
Cement Sand Metal (1:2:4) andWater etc. as
per standard specification (Measurement in
Cubic Meter)
68 Supply of Heat Shrinkable type Straight Joint 5 No 1400
Cable kit single Core Suitable for 11 KV 1C*70 &
95 sqmm AB cable (1 Phase)
70 Labour Charges for Fixing Heat shrinkable type 5 No 500
Cable Joint kit for 11 KV 1 C*70 & 95 sqmm AB
cable (1 Phase)
71 Labour Charges for Fixing Heat Shrinkable type 5 No 1000
Cable joint for 11 KV 1Cx70 Sqmm / 1C x
Sqmm AB Cable including Restringing of HT AB
72 Providing & fixing Heat Shrinkable type cable 5 No 3100
jointing kit suitable for 11 KV 3 C * 70 &
Sqmm AB cable for outdoor termination
application
73 SUPPLY OF SELF TIGHTENING ANCHORING 10 No 149
(DEAD END) CLAMP WITH POLE BRACKET
USING STAINLESS STEEL STRAP & BUCKLE
74 SUPPLY OF SELF LOCKING SUSPENSION CLAMP 15 No 165
WITH POLE BRACKET USING STAINLESS STEEL
STRAP & BUCKLE
75 SUPPLY OF PRE INSULATED MID SPAN JOINTS 15 No 149
FOR PHASE & NEUTRAL FOR 16 SQMM TO
76 SUPPLY OF STAINLESS STEEL OF SIZE STRAP 20 No 42
20MM X 0.7MM & BUCKET WIDTH 20MM
77 Supply & Labour charge for fixing of Lightning 20 No 3812
Arrester with separate Strip Earthing with PVC
covered for (1) Supply of following
material...etc
78 Welfare Cess @ 1% of Estimated Cost 39954 Each 1
79 GST@18% 726363 Each 1
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Annexure-A
Name of Contractor:-______________________ Mobile no:____________
Contractor’s store address:-
Details of work completion (last seven years):
no work Division order Amt work completed
no. & (Rs.) completed
Date (Rs.)
Details of work order on hand / Work under progress:
Sr. Name of Name Work Tender Amount of Quantity of work
no work of order Amt work completed
Divisio no. & (Rs.) completed
n Date (Rs.)
Contractor’s Signature
---------------------------------------For office use only----------------------------------------
This is to certify that, the above contractor name as
_______________________________ has successfully completed work of above
mention order in this division in stipulated time. The work is found satisfactory.
Executive Engineer
___________ Division
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Annexure-B
Name of Contractor:-______________________ Mobile no:____________
Address:-___________________
Details of Equipments, Tools, and safety equipments available with contractor:
Name of Equipments, Reg. no / Sr.
Quantity Approximate
Sr. no Tools, and safety no of
in Nos. value (Rs.)
equipments equipment
Contractor’s Signature
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
ANNEXURE – C
Details of Pending Orders, tendered for & on hand, as on the date of the submission of
this Tender:
(To be completely filled by the Bidder)
WORK DATE
SR STIPULATED
WITH ITS COST OF ANTICIPATED ESTIMA WHEN
N TENDER DATE OR REMARKS
LOCATION REMAINING DATE OF TED DECISION
O COST PERIOD OF
AND WORK COMPLETION COST IS
COMPLETION
ADDRESS EXPECTED
• If necessary, separate sheet may be used to submit the information.
Tender for -----------------------------------------
Tender No: UGVCL/---------------------------------------------
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
ANNEXURE-D
TENDER FEES
Sr. No. Estimated Cost of tender Tender Fee
1 Up to Rs. 5 Lacs As per DoP.
2 Above Rs. 5 Lacs and Up to Rs. 10 Lacs Rs. 500/-
3 Above Rs. 10 Lacs and Up to Rs. 50 Lacs Rs. 1000/-
4 Above Rs. 50 Lacs and Up to Rs. 100 Lacs Rs. 5000/-
5 Above Rs. 100 Lacs and Up to Rs. 500 Lacs Rs. 7500/-
6 Above Rs. 500 Lacs Rs. 10000/-
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Annexure-F
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
Ref: - Tender No: UGVCL/_______________________________
All bidders will have to furnish the following undertaking duly filled in signed and stamped for
each quoted item of the tender along with the Technical Bid.
I/We_____________________________________________________ authorized signatory of
M/s_____________________________________________ hereby certify that
M/s_________________________________________________ is not stop deal/black listed by
GUVNL and or any subsidiary companies viz.
PGVCL/UGVCL/DGVCL/MGVCL/GSECL/GETCO for the tendered item.
Signature of the Tenderer
Seal of the Firm
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________________ hereby certify that
M/s._________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
APPENDIX – I
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having their
registered office at _____________________________________ (Address of the firms Registered office)
(hereinafter called the ‘Tenderer’) wish to participate in the tender No.
_________________________for____________________________________________ of (Supply/
Erection/Supply & Erection Work) (Name of the material/equipment/Work) for _________________________,
______ Gujarat Vij Company Ltd. and WHEREAS a Bank Guarantee for (hereinafter called the “Beneficiary”)
Rs._____________ (Amount of EMD) valid till _________ (Mention here date of validity of this Guarantee
which will be 5 (FIVE) months beyond initial validity of Tender’s offer) which is required to be submitted by
the tenderer along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank Guarantee) having
our registered office at ______________________ (Address of Bank’s registered office) hereby give this Bank
Guarantee No.________________ dated _________ and hereby agree unequivocally and Unconditionally to
pay immediately on demand in writing from the _______ Gujarat Vij Company Ltd. or any officer authorized
by it in this behalf any amount not exceeding Rs. ______________ (Amount of E.M.D.), (Rupees
_________________________________ (In words) to the said ______ Gujarat Vij Company Ltd. on behalf of
the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender or part
thereof by the Tenderer within its validity or Non submission of Security Deposit by the Tenderer within one
month from the date tender or a part thereof has been accepted by the _______ Gujarat Vij Company Ltd.
would constitute a default on the part of the Tenderer and that this Bank Guarantee is liable to be invoked and
encashed within its validity by the Beneficiary in case of any occurrence of a default on the part of the
Tenderer and that the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of ____________________
(Mention here the date of validity of Bank) and shall not be terminable by notice or by Guarantor change in the
constitution of the Bank or the firm of Tenderer Or by any reason whatsoever and our liability hereunder shall
not be impaired or discharged by any extension of time or variations or alternations made, given, conceded with
or without our knowledge or consent by or between the Tenderer and the UGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or Subsidiaries). Notice or
invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the
Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is restricted to Rs.
__________ (Amt. of E.M.D.) (Rupees ____________________________________) (In words). Our
Guarantee shall remain in force till _________ (Date of validity of the Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before_______ (Date of Validity of the Guarantee),
all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged
from all liabilities there under:
Please Mention here Complete Postal Address Signature of the Bank’s Authorized Signatory
of the Bank with Branch Code, Telephone and with
Fax Nos. Official Round Seal.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis
Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat (GoG)
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of
Gujarat (GoG) from time to time.
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and unconditionally to
pay immediately on demand in writing from the ______ Gujarat Vij Company Ltd. or any Officer authorized by
it in this behalf any amount up to and not exceeding _______ (in words) Rupees ___________________ to the
said _______ Gujarat Vij Company Ltd. on behalf of M/s.
_________________________________________________who have entered into a contract for the
supply/works specified below
L.O.A. No. __________________________dated_________.
This agreement shall be valid and binding on this Bank up to and inclusive of ______________ and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of Contractors / Suppliers or by
any other reasons whatsoever and our liability hereunder shall not be impaired or discharged by any extension
of time or variations or alterations made, given conceded or agreed, with or without our knowledge or consent,
by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or Subsidiaries). Notice or
invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the
Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is restricted to
Rs.___________ (Rupees ___________________________ only). Our guarantee shall remain in force until
____________________ (Date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before_______ (Date of validity of the Guarantee), all rights of
Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all
liabilities there under:
Please Mention here Complete Postal Address Signature of the
of the Bank with Branch Code, Telephone and Bank’s Authorized Signatory with Official
Fax Nos. Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis
Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat (GoG)
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of
Gujarat (GoG) from time to time.
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
AGREEMENT:
This agreement is made at ___________the ___day of______month _______Year between the
______ Gujarat Vij Company Ltd. &__________________________ (hereinafter referred to as “the
Contractor “which expression shall unless excluded by or repugnant to the context included its
successors or permit assigns) of the one part and the _______ Gujarat Vij Company Ltd. Having its
Regd. and Corporate Office at _____________________________ (hereinafter called “The
Company” which expression shall unless excluded by or repugnant of the context include its
successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work of
_________________________________________________________as per Company’s LOA No.
____________________, Dated ___________, hereinafter called “The works and more particularly
desorbed enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer,, Circle/Division, UGVCL on behalf of the
Company, a list where of is made out in the schedule here under written and all of which said
documents are deemed to form part of this contract and include in the expression “The works
“wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance &
Erection of HT / LT Line & T/C and HT/LT AB Cable up on the terms and subject to the
conditions herein mentioned.
1.) The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable necessary for
the completion of the works as mentioned and at the time in the manner and subject to the
terms conditions and stipulation contained in this contract and in consideration of the due
provision, executions, construction and completion of the works agreed to by the contractors as
aforesaid the company both hereby covenant with the contractor to pay all the claims of money
as and when they become due and payable to the contractor under the provisions of the
contract such payment to be made at such times in such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to and
without prejudice to the right of the company to enforce for delay and or any other rights
whatever including the right to reject and cancel on default or breach by the contract of the
conditions and the covenant as stipulated in the general conditions specifications form Or
tender schedule drawing etc. attached with the Company LOA No.
____________________________, Dated ____________.
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his Supervisors
and labours to execute the work mentioned in Tender. On violating or breaking the Safety
Rules and Regulations, and if Supervisors/Labours are found without Safety Gadgets, “The
Company” reserves the right to take actions as per the terms and conditions mentioned in
Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default’. The UGVCL shall in
such an event give fifteen (15) days’ notice in writing to the Contractor of his decision to do
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and to the
extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders
and Contracts to the extent they are related to the work terminated and terms satisfactory to the
Company, stop all further sub-contracting or purchasing activity related to the work
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
terminated, and assist “The Company” in maintenance, protection, and disposition of the works
acquired under the Contract by the Company. In the event of such a termination the Contractor
shall be paid compensation, equitable and reasonable, dictated by the circumstances prevalent
at the time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless “the
Company” is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract “the Company” shall be entitled to cancel
the Contract as to its in completed part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the
Company that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on the
parties. In the event of such cancellation the Company shall not hold the estate of the deceased
Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the
surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may be
altered by mutual agreement and if so altered shall not be deemed or constructed to mean and to effect
or alter other terms and conditions of the contract and the contract so altered or revised shall be and
shall always be deemed to have been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first
above written.
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The _________Gujarat Vij Company Ltd
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
INDEMNITY BOND
In consideration of the _______ GUJARAT VIJ COMPANY LTD., herein after known as the
COMPANY having given contract for the work of _________________________________
___________________________________________________________________as per A/T No.
__________________________, dated _______________ and all future contract that may be
awarded to me in the next one year and in Important instructions for submitting the Tender in clause
27 of the COMPANY’s tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay compensation to my workmen
payable under the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter called the said Act
for death or injuries caused to the workmen engaged by this presents, if such compensation is paid by
the COMPANY as principal under such sub-section (1) of section 12 of the said Act on behalf of me,
to pay such amount of compensation on demand within 48 hours to the COMPANY that it might have
to spend as legal and other incidental charges in defending any suit or action arising out of the death of
injuries in regard to compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death or
injuries to the workmen engaged by me. During the execution of work of said contract and all future
contracts that may be awarded to me in the next one year is filed by the worker against the
COMPANY, I shall imbrues to the COMPANY such sum that the COMPANY is required to spend as
legal and other incidental charges in defending such suit or action and also the amount that may be
ordered to be paid to the worker / or his heirs as compensation and that the above written bind shall
remain in full force and virtue till the COMPANY is required to defend such suit or action filed by the
workers and or heirs against the COMPANY. Further it is applicable on death of contractor himself
also. No any compensation will be claimed by legal heirs of contractor.
Witnesses:
Signature of the Executant
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Arrangement of Transformer
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
EARTHING ARRANGEMENT FOR TRANSFORMER CENTRE
SIGN & STAMP OF THE BIDDER
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Arrangements of Guy
1. Guy Clamp 2. Turn Buckle and Eye Bolt 3. Guy Insulator
4. Guy Wire 5. Guy Rod 6. Guy Pit (2 X 2 X 5 ft.)
7. θ 30 to 40 Deg.
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Double Pole (D.P.) Structure
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Guarding under 11 KV Line
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Guarding under LT Line
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
LT Line Horizontal Formation and Clearances (415 V)
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
LT Line Vertical Formation and Clearances (415 V)
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
LT Line Horizontal Formation and Clearances (230 V)
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
LT Line Vertical Formation and Clearances (230 V)
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Sign & Stamp of the Bidder
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
ANNEXURE – A
On Non-judicial Stamp Paper of Rs. 300/-
DECLARATION IN RESPECT OF CONFLICT OF INTEREST
TENDER NO: KLL-DO-5-2026-27/
Sr. Particulars
01 Name of Firms
02 Office Address Phone No.
Fax No. Email ID
03 Works Address as per
Vendor Registration Phone
No. Fax No. Email ID
04 Type of Firm Private Limited Company / Public Limited Company /
Limited Liability
Partnership (LLP) / Partnership Firm / Proprietor Firm
(Tick whichever is applicable)
05 CIN / LLPIN of
06 GST No. of Firm
07 Names of all Directors/LLP Partners/ Partners / Proprietors of Bidder Firm with DIN
any) and full address (as on the bid submission date)
Sr. Full Name DIN Full Residential Address
Stamp / Round Seal
The details of Legal Representative / Agent of the Bidder Firm are as under:
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
Full Name of Legal
Representative / Agent
Whether employee of
Bidder-Firm or not? (Yes/No)
Designation
Office Address
Office Land-line Nos.
Mobile No.
Whether acting as Legal Representative / Agent
in any other Private Limited Company or Public
Limited Company or Limited Liability
Partnership (LLP) or Partnership Firm or
Proprietor Firm? If yes, give names.
WE HEREBY DECLARE AND CONFIRM THAT no bid has been submitted for the quoted item
by any other Private Limited Company or Public Limited Company or Limited Liability
Partnership (LLP) or Partnership Firm or Proprietor Firm in which any relative of any
Director or Partner or Proprietor of Bidder Firmis a Director, Partner or Proprietor. The
word “relative” is defined as under:
The Companies Act, 2013 Sec 2(77) “relative’’, with reference to any person, means
any one who is related to another, if—
(1) they are members of a Hindu Undivided Family;
(2) they are husband and wife; or
(3) A person shall be deemed to be the relative of another, if he or she is related to
another in the following manner, namely:-
a. Father including step-father,
b. Mother including step-mother,
c. Son including step-son,
d. Son’s wife,
e. Daughter,
f. Daughter’s husband,
g. Brother including step-brother,
h. Sister including step-sister.
Stamp / Round Seal
WE FURTHER DECLARE THAT we have carefully read and understood the clause relating to
‘Conflict of Interest’ of Tender No. . The detailed Clause is
“A bidder shall not have conflict of interest with other bidders for particular quoted item.
Such conflict of interest can lead to anti-competitive practices to the detriment of
Procuring Entity’s interests. The bidder found to have a conflict of interest shall be
Signature of Contractor & seal
Division Office: KALOL, Mahendra Mill Road, Kalol (N.G)-382721,
E-Mail:[email protected] Web Site: www.ugvcl.com
disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from
any of them; or
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on the
bid of another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a
bidder in more than one Bid will result in the disqualification of all bids in which the
parties are involved. However, this does not limit the inclusion of the components/
sub-assembly/ assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorize only one
agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf;and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that is the subject of the Bid;
h) In case of a holding company having more than one independently manufacturing
units or more than one unit having common business ownership / management, only
one unit should quote. Similar restrictions would apply to closely related sister
companies. Bidders must proactively declare such sister/ common business/
management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act,
as amended from time to time.”
We hereby certify that our Firm M/s. _______(Firm Name)_____ do not have any conflict
of interest with other bidders for particular quoted item viz. _______(Item Name)_____ .
Stamp / Round Seal
We hereby declare and confirm that the above information and particulars are true and
For _______(Firm Name)_____
Signature of Director / Partner
/Proprietor / Authorized Signatory
Date: Stamp / Seal of Firm Name:
Designation:
Signature of Contractor & seal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PETA SR NO-3 TENDER NOTICE NO KLL-DO-05-2026-27.pdf
Download all tender documents and submit your bid