| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC LSGD SECTION THAZHEKODE PERINTHALMANNA MALAPPURAM | MALAPPURAM | KERALA | 670612 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 L+₹22,846.63 (4.67%)Rejected-AOC LID EW SECTION AREEKODE | KANNUR | KERALA | 670002 | ₹5.1 L+₹22,846.63 (4.67%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BASHEER K L1 | M.K. ABDUL HAMEED L2 |
|---|---|---|---|---|---|
| 1.00ANNUAL MAINTENANCE | |||||
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 40 | sqm | 120.3 ₹4,812 Lowest | 125.7 ₹5,028 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 10,020 | sqm | 16.3 ₹1,63,326 Lowest | 17.1 ₹1,71,342 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 24 | hour | 419 ₹10,056 Lowest | 438.1 ₹10,514.4 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.43 | cum | 327.8 ₹1,778.64 Lowest | 342.7 ₹1,859.49 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 492 | cum | 236.3 ₹1,16,259.6 Lowest | 247 ₹1,21,524 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 14.4 | cum | 8,820.9 ₹1,27,020.96 Lowest | 9,223 ₹1,32,811.2 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 96 | sqm | 370.1 ₹35,529.6 Lowest | 387 ₹37,152 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 2.38 | cum | 7,522.8 ₹17,904.26 Lowest | 7,865.7 ₹18,720.37 |
| 1.01 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 3.88 | cum | 3,293.5 ₹12,775.49 Lowest | 3,443.6 ₹13,357.72 |
Tender Value
₹4.5 L
EMD Value
₹11,150
Closing Date
18 Sept 2024, 6:00 pmClosed
Assistant Executive Engineer
MI Sub division Parappanangadi
GENERAL AM ANNUAL MAINTENANCE OF VAZHAKKAD LI SCHEME IN VAZHAKKAD PANCHAYATH KONDOTTY LAC FOR THE YEAR 2024 25 General Civil Work General Civil Work
2024_Irrig_689016_1
IRR/IA/1698/2024-2025
Open Tender
Civil Works - Others
Item Rate
180 days
Vazhakkad Malappuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹985
Yes
₹11,150
Yes
14 Aug 2026
3 Sept 2024
23 Sept 2024
3 Sept 2024
18 Sept 2024
3 Sept 2024
Amount
ANNUAL MAINTENANCE
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
M.K. ABDUL HAMEED
Bidder Name
M.K. ABDUL HAMEED
BASHEER K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1072301.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .