Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹608.96Accepted-AOC | ₹608.96 | L1 | Accepted-AOC BID IS RESPONSIVE |
Tender Value
₹6.4 Cr
EMD Value
₹12.9 L
Closing Date
2 Sept 2021, 1:00 pmClosed
CE URRDA
Ist floor in Directorate of panchayati raj opposite IT Park, Shastradahra Road Dehradun, Uttarakhand
Sahastradhara to Naliwala Motor road stage II
2021_CCUK_112819_1
UT510
National Competitive Bid
Civil Works - Roads
Item Rate
270 days
Dehradun
Refer to technical bid
3 documents required · 3 mandatory
₹5,900
₹12.9 L
Yes
SE PMGSY circle Mussoorie
2 Nov 2021
21 Aug 2021
2 Sept 2021
21 Aug 2021
2 Sept 2021
25 Aug 2021
23 Aug 2021
Amount
EARTH WORK
Earth work in hill road (hill side cutting/filling):- Excavation in hilly area for construction of road in all types of soils & rocks with E&B and BLB as met at site true to lines as per plan, X section, L section camber, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lead, lifts and safe disposal of surplus excavated material at suitable dumping places by mechanical means/ manual means indicated in the drawing with out damaging forest and forest land including slip clearance during hill side cutting as directed by Engineer-in-charge.
Excavation in soil in Hilly Area by mechanical means without using dozer, including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using dozer, including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.
Excavation in hilly areas in hard rock requiring blasting, by mechanical means (not cu.musing dozer) , including lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2
Excavation in Cutting in all type of Soil and rock by manual means with lead up to 50 M for carrying of cut earth to embankment ( Half cut and half fill ) as directed by Engineer-in-charge and MORD specifications for Rural Roads 2014. (For Superelevation)
Construction of Embankment with material obtained from Roadway Cutting/with approved materials deposited at site from roadway as directed by Engineer-in-charge and MORD specifications for Rural Roads 2014 (Filling/Patri Filling)
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
Providing edge stones RCC grade M 15 (500 mm x 120 mm x 100 mm) on valley side of formation as per drawing .
Prepration Of Subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
PROTECTION WORK
Excavation in foundation for structures in all types of soils and rocks including all lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Construction of R.R. stone masonary laid dry , supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
Construction of R.R. stone masonary in cement mortar 1:5 including supply of all materials,labour, T&P,Royalty etc required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
HP stone filling in back of structures including supply of all material, labour, T&P, royalty etc. required for proper completion as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Parapet as per standard drawing attached including supply of all material, labour, T&P etc. required for proper completion of work as per direction of Er I/C.With C.C.Base
i) E/W in excavation in foundation
ii) Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. (As per PWD Uttarakhand specifications)
iii) White washing
Construction Of Pucca Drain
i) E/W in excavation in foundation
RR 1:5 Per Cum
Plaster 1:4
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each (crate size 3.00m * 1.50m* 1.25m) as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
By Mix in Place Method Construction of granular sub-base by providing locally available material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. by Mecahnical means
WBM Grading-3…. Providing, laying, spreading and compacting stone aggregates of specific sizes(53mm to 22.4 mm) to water bound macadam including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screenings to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 of MORD Specification for Rural Roads 2014 by Mecahnical means
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.00 kg/sqm using mechanical means as per Technical Specification Clause 502 of MORD Specification for Rural Roads 2014
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MORD Specification for rural roads 2014
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2
Providing and laying seal coat by Bitumen /Bituminious Emulsion (Tailor made binder) as binder for sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using as per Technical Specification Clause 508 of MORD Specification for Rural Roads 2014. (TYPE-B)
CROSS DRAINAGE WORKS
CAUSEWAY
Providing and laying of concrete for plain concrete in open foundations for structures including supply of all materials, labour, T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. P.C.C grade M 10. (Causeway)
Providing and laying of concrete for reinforced concrete for structures including supply of all materials, labour, t&p, shuttering, centering , royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.R.C.C.grade M 25 for cross drainage structures such as Culverts , Bridges etc.(Causeway)
Supplying, cutting , and placing of HYSD bar reinforcement in substructure/superstructure complete (IS1786:2008 clause no. 1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014
Construction Of Culvert (8m Span)
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Depth 3 m to 6 m
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M20 in (raft foundation)
Random Coursed Rubble stone masonry in 1:4 cement and sand mortar in superstructure including supply of all materials, labour,T&P required for proper completion of the work.
Random Coursed Rubble stone masonry in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 R.C.C grade M20 (1:1 1/2:3) in bends
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M25 (1:1.5:3) in Superstructure
Supplying, fitting and placing HYSD bar reinforcement complete M.T.as per drawing and technical specifications .(The reinforcement steel shall be procured from original (primary) steel producersas per clause no. 1009.3.1 of MORTH specifications (Fifth Revision'2013) and IS1786:2008 clause no. 1.6)
In Foundation
In Substructure
In Superstructure
Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)
ROAD FURNITURE
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per IRC/ MORD Specification for Rural Roads 2014.
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
Maintainance Activities:
EMERGENCY MAINTENANCE
Deploying Hydrolic Excavators of 0.90 Cum Bucket for Opening of Road with required Slip Clearence in all type of Soil, Rock and Boulders including its Operetor, Fuel, all other charge and taxes required for proper completion of work.
1St year
2nd year
3rd year
4th year
5th year
Slip clearance of earth and boulders and other small loose materials after hill side cutting in rainy season including disposal of material as directed by Engineer-in-charge and as per MoRD specifications, Clause 1611 .
1St year
2nd year
3rd year
4th year
5th year
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications)
1St year
2nd year
3rd year
4th year
5th year
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing
1St year
2nd year
3rd year
4th year
5th year
Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
1St year
2nd year
3rd year
4th year
5th year
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .