| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC | L1 | Accepted-AOC below rate | |
| 2 | L2₹23.3 L+₹2.5 L (11.8%)Rejected-AOC 184 KEELA STREET NEIKULAM NEDUNGUR LALGUDI 621105 | TIRUCHIRAPPALLI | TAMIL NADU | 621105 | L2 | Rejected-AOC above rate |
| Sl No | Description | Qty | Unit | A S POWER SOLUTIONS L1 | ASV CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Rectifying the 160 mm dia PVC/ HDPE pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 20 | Nos | 6,620 ₹1,32,400 Lowest | 10,000 ₹2,00,000 |
| 2.00 | Rectifying the 110 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 25 | Nos | 5,160 ₹1,29,000 Lowest | 6,000 ₹1,50,000 |
| 3.00 | Rectifying the 90 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 40 | Nos | 4,000 ₹1,60,000 Lowest | 5,000 ₹2,00,000 |
| 4.00 | Rectifying the 63 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 40 | Nos | 2,395 ₹95,800 Lowest | 3,000 ₹1,20,000 |
| 5.00 | Rectifying the 200 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 5 | Nos | 8,370 ₹41,850 Lowest | 9,000 ₹45,000 |
| 6.00 | Rectifying the 100 mm dia AC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 10 | Nos | 5,670 ₹56,700 Lowest | 6,500 ₹65,000 |
| 7.00 | Rectifying the 150 mm dia AC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 10 | Nos | 8,810 ₹88,100 Lowest | 9,500 ₹95,000 |
| 8.00 | Rectifying the 200 mm dia AC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 5 | Nos | 11,900 ₹59,500 Lowest | 13,000 ₹65,000 |
| 9.00 | Rectifying the 100 mm dia CI pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 10 | Nos | 12,182 ₹1,21,820 Lowest | 13,500 ₹1,35,000 |
| 10.00 | Rectifying the 200 mm dia CI pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 5 | Nos | 23,149 ₹1,15,745 Lowest | 25,500 ₹1,27,500 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
27 Feb 2026, 3:00 pmClosed
Commissioner
azad road
Attending leak and burst works in the distribution main pumping main reconditioning of existing distribution valves etc at zone II of KCMC.
2026_MAWS_667556_1
E1/330/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Item Rate
KCMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
9 Oct 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Rectifying the 160 mm dia PVC/ HDPE pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 20 | Nos | - | - |
| 2 | Rectifying the 110 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 25 | Nos | - | - |
| 3 | Rectifying the 90 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 40 | Nos | - | - |
| 4 | Rectifying the 63 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 40 | Nos | - | - |
| 5 | Rectifying the 200 mm dia PVC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 5 | Nos | - | - |
| 6 | Rectifying the 100 mm dia AC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 10 | Nos | - | - |
| 7 | Rectifying the 150 mm dia AC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 10 | Nos | - | - |
| 8 | Rectifying the 200 mm dia AC leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 5 | Nos | - | - |
| 9 | Rectifying the 100 mm dia CI pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 10 | Nos | - | - |
| 10 | Rectifying the 200 mm dia CI pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete. | 5 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_801959.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .