| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹2.2 L+₹11,546.72 (5.48%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹5,291
Closing Date
10 Sept 2024, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive, Electrical wing irrigation Sub division Aluva
G E N E R A L A M C 2 0 2 4 2 5 F u l l y Comprehensive Annual Maintenance of Piravom and Thalackode LIS Under Electrical Lift Irrigation Section Ramamangalam General Electrical Work
2024_Irrig_688750_1
PWD/RLM/BLDG/5488/2024-2025
Open Tender
Electrical Works
Item Rate
365 days
Ramamangalam
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
₹5,291
27 Dec 2024
2 Sept 2024
12 Sept 2024
2 Sept 2024
10 Sept 2024
2 Sept 2024
Amount
Motor Overhauling Works
OD242972/2023-2024:Dismantling the 20 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD242907/2023-2024:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD242909/2023-2024:Dismantling the 100 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD242898/2023-2024: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load.
OD242901/2023-2024: Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD242916/2023-2024:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD242917/2023-2024:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make.
OD242918/2023-2024:Supply and Fixing of 200/5 A, 10 VA, accuracy class 1, Resin Cast Metering CT
OD242919/2023-2024: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD242920/2023-2024:Supply and Installing 20 W LED Tube light.
OD242921/2023-2024:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD242922/2023-2024:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD242923/2023-2024:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
OD242924/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316 , SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
OD242925/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 60 HP motor / pump set as per the direction of Departmental staff at site.
OD242926/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (50-120 HP) as per the direction of Departmental staff at site.
OD242927/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 90/100 HP motor's fully automatic star delta starter
90.14.24.26:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.20 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
OD110825/2024-2025:Providing and fixing following rating Operating Handle for Existing 400 Amps MCCB in the panel board with connecting rode and other Accessories , ABB made , (T5N400D)
Motor AMC
OD242910/2023-2024:Fully Comprehensive Annual Maintenance of 1 / 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 2 Motors, 12 months for Each Motor).
OD243071/2023-2024: Fully Comprehensive Annual Maintenance of 20 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . "
OD242913/2023-2024: Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD242915/2023-2024: Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Motor Lifting Works
OD242903/2023-2024: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD242906/2023-2024:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
POWER ELECTRICALS
Bidder Name
POWER ELECTRICALS
KAMALA ELECTRICALS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1071882.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .