Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 13 2 GAYATRI NAGAR VNIT ROAD IT PARK PARSODI NAGPUR MAHARASHTRA 440022 | NAGPUR | MAHARASHTRA | 440022 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance AHMEDNAGAR | MAHARASHTRA | 413201 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical NOT ELIGIBLE |
| 5 | Rejected-Technical | Rejected-Technical NOT ELIGIBLE |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
24 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADMINISTATOR (CHATRAPATI SAMBHAJI NAGAR/WALUJ)
CIDCO of Maharashtra Limited, CIDCO, Udyog Bhavan, Chatrapati Sambhaji Nagar - 431 003
Survey and demarcation work of land/plots with fixing of pole/stone within New Towns of CIDCO Chatrapati Sambhaji Nagar, Waluj Mahanagar, New Nashik, New Nanded, New Jalna and Chikhaldara.
2024_CIDCO_1130623_1
CANO01/CIDCO/ADM/LVO/24-25
Open Tender
Miscellaneous Services
Item Rate
1095 days
CIDCO LTD
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹50,000
Yes
10 Mar 2025
27 Dec 2024
28 Jan 2025
27 Dec 2024
24 Jan 2025
27 Dec 2024
Survey & Demarcation Work
Carrying out Total Station Survey of open lands preparing maps indicating existing landuse, existing feature status on land viz –bunds, boundries, Compound wall, barbed wire fencing, trees, electric line, well, lake, Pacca /Kaccha buildings, barbed wire fencing, drainage lines, cannal, drips, telephone cables etc. with duct. After completion of field measurements fixation of gut/ Survey no. boundaries as per measurement plan etc, & as ownership shown in 7/12 on CIDCO plan, layout. Preparation of maps to the scale with various details as per requirement of various departments and reports about problem if any. Including submission of 02 soft copies & 05 hard copies. The scope also includes preparation of ground for carrying out survey works including its approaches, fixing temporary change points etc.
Carrying out Total Station Survey of populated land with all requirements indicated in Sr. No. 01 with all structures.
Providing demarcation of plots with lime marking- Note:- The item includes twice redemarcation for confirmation if required. Item also includes all labour,material, making approaches to location, taking care of all extent of work for ease of survey. Submission of drawing showing adjoining properties, features & number of stones/points fixed on it.
A) Area 01 to 100 Sq. Mtr.
B) Area 101 to 300 Sq. Mtr
C) Area 301 to 1000 Sq. Mtr
D) Area 1001 and above
Providing demarcation of road with pegs & lime marking on both side. Note :- The item includes twice re-demarcation for confirmation if required. Item also includes all labour, material, making approaches to location, taking care of all extent of work for ease of survey. Submission of drawing showing adjoining properties, features & number of stones/points fixed on it.
A) 3.00 M.W. Pathway to 11.00 M.W. Road
B)Above 11.00 M.W road
Fixing 150 x 150 mm top & 450 mm long tapered stone, 300 mm deep in cement concrete 1:1.5:3 as per detailed drawing, including excavation in all types of soil, refilling, compaction, watering, curing etc. at all location as per direction for either plot or road as directed in It. No. 3 & 4 above. Note :- Item includes all labour, material, making approaches to location, taking care of all extent of work for ease of survey.
Fixing 150 x 150x 600 mm size cement pole, 300 mm deep in cement concrete 1:1.5:3 as per detailed drawing, including excavation in all types of soil, refilling, compaction, watering, curing etc. Note :- Item includes all labour, material, making approaches to location, taking care of all extent of work for ease of survey.
Fixing 100 x 100x 600 mm size cement pole, 300 mm deep in CC 1:1.5:3. Note :- Item includes Excavation in all types of soil with necessary backfilling, all labour, material, making approaches to location, taking care of all work for ease of survey.
Carrying out the work of excavation of trenches/dog bailing with 0.5 m bottom width and depth 0.9m as along length with mechanized means including disposal of excavated material on CIDCO area fairly leveled, taking suitable measures to avoid obstruction to services. Services if damaged, work will be restored by the contractor. No separate payment will be given.
Carrying contour survey by taking levels on 10 x 10 mtr. Grid, at every 0.50 m distance plotting of contour and preparing contour map in scale with grid levels and submission of 02 soft copies & 05 hard copies as per requirement of Department. The works shall be as per GTS and contractor has to carry out GTS at site of work and fix TBM including marking of TBM on permanent structure for future reference.
Carrying out survey of pathway upto 11.00 m wide road at every 10 m intervals or at change of alignment longitudinally & 0.5 m laterally by taking L section as per width of road & cross section, submission of drawings in 02 soft copies and 05 hard copies as per requirement of Department. Survey should includes at least one reading beyond both sides of width to have idea about adjoining structure/features. The works shall be as per GTS and contractor has to carry out GTS at site of work and fix TBM including marking of TBM on permanent structure for future reference.
Carrying out survey of 11.00 m and above wide roads at every 10 m intervals or at change of alignment longitudinally & 0.5 m laterally by taking L section as per width of road & cross section, submission of drawings in 02 soft copies and 05 hard copies as per requirement of Department. Survey should includes at least one reading beyond both sides of width to have idea about adjoining structure/features. The works shall be as per GTS and contractor has to carry out GTS at site of work and fix TBM including marking of TBM on permanent structure for future reference.
Providing spot wise one survey team comprising of 01 Surveyor, 02 Assistants, 02 Mazdoors having knowledge of survey work along with required flags, bamboo, measuring tape, lime, oil paint with brush etc. the survey team should be made available on 24 hrs notice at all locations.
Providing spot wise one survey team comprising of 01 Surveyor, 02 Assistants, 02 Mazdoors having knowledge of survey work along with required flags, bamboo, measuring tape, lime, oil paint with brush etc. the survey team should be made available on 24 hrs notice at all locations.
Providing & fixing 250 mm dia. NP-2 class pipes as boundary pillars. Item includes excavation for foundation, providing soling PCC 1:2:4, Reinforcement, RCC, Painting & lettering as per detailed drawing, refilling. Compaction, watering, curing and surveying, reconfirmation of the points of the plot etc complete as directed by Engineer.
Providing & fixing board of 0.90 m x 0.60 m size displaying required information made out 18 gauge (1.25 mm) thick mild steel sheet painted with one coat zinc chromate stoving primer and two coat of enamel paint on front side and border with approved color shade etc. complete, on M. S. angle of size 35x35x3 mm frame with properly cross braced M. S. angle of size 35x35x3 mm duly painted including two M.S. angle iron post of size 65x65x6 mm, 3.65 m long painted with approved colour including all fixture and fixing the board in 1:2:4 of size 60x60x75 cm including excavation, refilling and transportation etc. complete.
Cleaning & leveling the plots by mechanical means [JCB/Dozer] including cutting, filling, removal of grass etc to make ground firmly level including disposal of surplus.
Providing unskilled heavy labour.
Carrying out longitudinal & cross section of stream/nallas to entire width and plotting L-sections along.
Carrying out detailed survey for isolated structure like culvert / bridge/ C.D. works etc. irrespective of its size in one unit.
Final editing & correction on drawing of Auto-cad with superimposing of other data as estimated along with colour/B&W Prints.
Providing one AutoCAD expert for editing of drawing with submission of daily report.
Carrying out Control Points for detailed survey work by D.G.P.S. All the D.G.P.S. points must be in WGS84 system, Northing-Easting will be clearly marked on the site on cement pole of size 150 X 150 mm duly numbered including fixing of concrete poles.
Digging a trench 60 cm. wide and 60 cm deep with JCB machine.
MANDLIK INFRACON INDIA PRIVATE LTD (BID ID -6438541)
K. P. and Associates (BID ID -6430367)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .