Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49,875Accepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | L1 | Accepted-AOC work order | |
| 2 | L2₹51,300+₹1,425 (2.86%)Rejected-Finance | L2 | Rejected-Finance Rejected as higher rate is quoted | |
| 3 | L3₹52,380+₹2,505 (5.02%)Rejected-Finance AT PHUSBUNGLOW PO BHAGA DIST DHANBAD 828301 | DHANBAD | DHANBAD | JHARKHAND | 828301 | L3 | Rejected-Finance Rejected as higher rate is quoted |
Tender Value
₹49,875
Closing Date
11 Feb 2023, 12:00 pmClosed
AREA MANAGER (EXCVN)
AREA MANAGER(EXCVN), LODNA AREA OFFICE,BCCL, P.O. Bhaga, DHANBAD-828301
1- Complete Cabin Dashboard Under Body Channel Cutting, Welding and Channel replacement, Fitting Including Materials with Labour Cost. 2- Rear and Front Wheel Brake Chember Booster Complete Dismantling/Overhauling, Removing Fitting.
2023_BCCL_269927_1
BCCL/LA/EXC/E-TENDER/22-23/174
Open Tender
Excavation Department Work
Item Wise
10 days
ANTST-JG OCP, LODNA AREA, BCCL
Please refer Tender documents.
12 documents required · 12 mandatory
Yes
31 Mar 2023
3 Feb 2023
13 Feb 2023
3 Feb 2023
11 Feb 2023
4 Feb 2023
3 Feb 2023 - 10 Feb 2023
Amount
Repairing of Ashok Leyland Truck, having Registration No. BPW-7371 at ANTST-JG OCP, Lodna Area, BCCL.
Repairing of Ashok Leyland Truck, having Registration No. BPW-7371 at ANTST-JG OCP, Lodna Area, BCCL. 1- Complete Cabin Dashboard Under Body Channel Cutting, Welding and Channel replacement, Fitting Including Materials with Labour Cost. 2- Rear and Front Wheel Brake Chember Booster Complete Dismantling/Overhauling, Removing Fitting. 3- Rear and Front Wheel Brake Chember Booster Body Complete Refacing. 4- Rear and Front Wheel Brake Chember Booster Hose Removing and Changing , fitting. 5- F.I. Pump Complete Removing, Fitting and Coupling Patti with Bolt Removing and Changing, Fitting. 6- Diesel Mobile Filter Kit Removing Changing, Fitting. 7- Rear Spring Leaf Removing and Necessary Recambering, Fitting. 8- Rear Spiring U. Bolt Cutting, Removing, Changing, Fitting. 9- Rear Spiring Leaf Cutting and Welding. 10- Rear Spiring Hanger with Shackle Removing and Changing, Fitting. 11- Front Spiring I. Bolt Removing, Fitting and Checking and Tight and Necessary Washer Replacement Fitting.
Total impact of GST for the purpose of CTC
R A AUTO WORKS
Naz Automobile and Tyre Repairing Works
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_279265.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .