| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC PADIYARA MEENADAM P O KOTTAYAM 686 516 | KOTTAYAM | KOTTAYAM | KERALA | 686516 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹7.0 L+₹89,025.13 (14.6%)Rejected-AOC | L2 | Rejected-AOC HIGHER RATE NOT ADMITTED | |
| 3 | L3₹7.2 L+₹1.1 L (17.2%)Rejected-AOC | L3 | Rejected-AOC HIGHER RATE NOT ADMITTED | |
| 4 | L4₹7.3 L+₹1.2 L (19.9%)Rejected-AOC | L4 | Rejected-AOC HIGHER RATE NOT ADMITTED | |
| 5 | L5₹7.7 L+₹1.6 L (26.1%)Rejected-AOC | L5 | Rejected-AOC HIGHER RATE NOT ADMITTED |
| Sl No | Description | Qty | Unit | ABOO.V L5 | RAJAN VARGHESE L1 | Basheer N L2 | karthikeyan L6 | MUHAMMED SAFUVAN KONNADAN L3 | SUROJ L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00open stage | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.31 | cum | 327.41 ₹4,032.05 | 350 ₹4,310.25 | 297.44 ₹3,662.97 Lowest | 330 ₹4,063.95 | 300 ₹3,694.5 | 311.16 ₹3,831.94 |
| 1.00 | OD538518/2024-2025:Dry rubble masonry -Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges complete as per Departmental officer at site | 12.7 | cum | 3,634.84 ₹46,144.29 | 3,750 ₹47,606.25 | 3,302.07 ₹41,919.78 | 3,673.98 ₹46,641.18 | 2,200 ₹27,929 Lowest | 3,454.34 ₹43,852.85 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 18.06 | cum | 7,594.24 ₹1,37,151.97 | 6,500 ₹1,17,390 Lowest | 6,898.98 ₹1,24,595.58 | 7,675 ₹1,38,610.5 | 7,100 ₹1,28,226 | 7,217.12 ₹1,30,341.19 |
| 1.00 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.38 | cum | 6,217.7 ₹2,350.29 | 7,000 ₹2,646 | 5,648.46 ₹2,135.12 Lowest | 6,284 ₹2,375.35 | 6,800 ₹2,570.4 | 5,908.94 ₹2,233.58 |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 17.68 | cum | 663.89 ₹11,740.89 | 1,540 ₹27,234.9 | 603.11 ₹10,666 Lowest | 670 ₹11,848.95 | 700 ₹12,379.5 | 630.92 ₹11,157.82 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 225.5 | sqm | 351.48 ₹79,258.74 | 750 ₹1,69,125 | 319.3 ₹72,002.15 | 355.3 ₹80,120.15 | 250 ₹56,375 Lowest | 334.03 ₹75,323.77 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.55 | kilogram | 102.33 ₹56.28 | 100 ₹55 | 92.96 ₹51.13 Lowest | 103.4 ₹56.87 | 110 ₹60.5 | 97.25 ₹53.49 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.5 | cum | 9,069.16 ₹49,880.38 | 7,500 ₹41,250 Lowest | 8,238.87 ₹45,313.79 | 9,166.8 ₹50,417.4 | 8,500 ₹46,750 | 8,618.8 ₹47,403.4 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 1.89 | sqm | 336.55 ₹636.08 | 325 ₹614.25 | 305.74 ₹577.85 Lowest | 339.5 ₹641.66 | 360 ₹680.4 | 319.84 ₹604.5 |
Tender Value
₹8.5 L
EMD Value
₹21,135
Closing Date
6 Aug 2025, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER DIST PANCHAYAT PALAKKAD
NECHULLI GHS OPEN STAGE AND YARD INTERLOCK TILES -General Civil Work
2025_LSGD_778579_18
03/AEE/2025-26 DT 19.07.2025
Open Tender
Civil Works - Others
Item Rate
180 days
PALAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,865
Yes
₹21,135
Yes
28 Oct 2025
26 Jul 2025
8 Aug 2025
26 Jul 2025
6 Aug 2025
26 Jul 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1276613.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .