Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹286.7 CrAccepted-AOC | ₹286.7 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹300.3 CrRejected-AOC 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹300.3 Cr | L2 | Rejected-AOC Not a lowest bidder |
| 3 | L3₹302.4 CrRejected-AOC 84 1A 3RD FLOOR TRINITY PLAZA TOPSIA ROAD SOUTH TOPSIA KOLKATA WEST BENGAL 700046 | KOLKATA | WEST BENGAL | 700046 | ₹302.4 Cr | L3 | Rejected-AOC Not a lowest bidder |
| 4 | L4₹340 CrRejected-AOC | ₹340 Cr | L4 | Rejected-AOC Not a lowest bidder |
Tender Value
₹312 Cr
EMD Value
₹3.1 Cr
Closing Date
1 Dec 2022, 5:00 pmClosed
Chief Executive Officer
The Chief Executive Officer, WATCO Ground Floor, Unnati Bhawan, H.B. Colony, Satyanagar, Bhubaneswar-751007, Odisha, India (0674) 2391444
Intake Arrangement, DI MS Raw water pipe line, raw water reservoir, 130 MLD WTP, MBR, ESR, GSR, CWR Rising main and Distribution main with pumping arrangement and external-internal electrification
2022_WATCO_82290_1
WATCO (W)-27/ 2022-23 Dt.28.09.2022
National Competitive Bid
Civil Works - Water Works
730 days
Bhubaneswar
Please refer Tender documents.
3 documents required · 3 mandatory
₹35,400
Yes
₹3.1 Cr
Yes
Bhubanswar
10 Mar 2023
17 Oct 2022
7 Dec 2022
17 Oct 2022
1 Dec 2022
17 Oct 2022
17 Oct 2022 - 1 Nov 2022
4 Nov 2022
Amount
Construction Work: Design, Construction, Supply, Installation, Testing and Commissioning of the Work Construction of 130MLD Water Treatment Plant and its Ancillary Structures for Improvement of Water Supply to Bhubaneswar City” on Engineering, Procurement & Construction (EPC) Contract Including Operation & Maintenance for a Period of Five Years etc. all complete as per terms, conditions, scope of work and technical specification stipulated in Draft Agreement and as per conditions of RFP Document. The offer price is submitted in accordance with the bidding documents and the agreement in Appendix-IB (Letter Comprising the Financial Bid).
Operation & Maintenance (excluding energy charge): Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 1st Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 2nd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 3rd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 4th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 5th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Energy Charges for Operation & Maintenance: Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 1st year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 2nd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 3rd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 4th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 5th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Gannon Dunkerley And Co Ltd
WPIL Limited
LCC PROJECTS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid