Loading…
Loading…
140 results • Latest
Design, Drawing, Const. Testing and Comm. of S/S, 100 KLD Sewage Treatment Plant (STP) and 25 KLD Effluent Treatment Plant (ETP) for Subdivisional Hospital in Hinjilicut including Operation and Maint. for a period of Five Years
Construction of 5 Nos of Branch Storm Water Drain (Box Drain) namely Drain No.3L,3R,4R,5R and 6R of MSWC-1 of Cuttack Municipal Corporation on EPC Contract (Engineering, Procurement and Construction) basis
Improvement of water supply to RITI Larpank at Hirakud under WATCO Section-III, Hirakud
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Bhuasuni, Bhubaneswar City
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Museum, Bhubaneswar City
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Mulapadia, Bhubaneswar City
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Baragada, Bhubaneswar City
Construction of ESR and laying of distribution system including automation work to different zones of Ward No.4 for 24x7 water supply to Naharkanta to Phulnakhara area BMC including O and M period of 5 years
Construction of Intake well, 20 MLD WTP with raw water and clear water rising main with 24x7 water supply to Ward No.4 Naharkanta to Phulnakhara area of BMC including OandM period of 5 years
Construction of DRINKING WATER KIOSK at Chhunavati Chhak Jobra Canal Road Ward No - 40 Zone-30 Under WATCO Section Ranihat, Kataka
Design, Construction, Testing and Commissioning of the RCC ESR of 20 lakh liter capacity for 24x7 Water Supply to Deulisahi, Ramachandrapur Kabarkhana area in ward No-10, Baripada under WATCO Division Baripada in Mayurbhanj district
Construction of DRINKING WATER KIOSK in Ward No 42, Chauliaganj under WATCO Section, Nayabazar, Kataka
DRINKING WATER KIOSK at different places of Burla area under WATCO Sub Division, Burla
Erection of Pre-cast compound wall around Burla WTP area under WATCO Section-II, Burla
DRINKING WATER KIOSK at different places of Burla area under WATCO Sub-Division, Burla
Shifting of existing 900mm dia DI pipe line along NH 16 from Kaliabali to Pukudibandha Jn. in connection with Puintola to Ichhapur road chainage at Pukudibandha JN under WATCO Division, Berhampur
Shifting of existing 900mm dia DI pipe line along NH 16 from Kalibala to Pukudibandha Jn. in connection with Puintola to Ichhapur road chainage at IRE JN. (VUP) under WATCO Division, Berhampur
Shifting of existing 900mm dia. DI pipe line along NH 16 from Kalibala to Pukudibandha Jn. with 100m shifting for Ankuli line existing 400 mm dia DI pipe for Flyover under WATCO Division, Berhampur
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Bomikhal, Bhubaneswar City
Design, Drawing, Construction, Testing and Commissioning of Sewerage System, 220 KLD Sewage Treatment Plant (STP) and 55 KLD Effluent Treatment Plant (ETP) for City hospital in Berhampur including Operation and Maintenance for a period of Five Years
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Pokhariput, Bhubaneswar City
Supply, Installation, Testing and Comm.of 500KVA Silent DG set and const.of 500KVA DG Shed at 7.5 MLD Intake well Jokadia and 380KVA Silent DG set and foundation of 400KVA DG Shed 9.5 MLD WTP at Mundamala under WATCO Section-1, Vyasanagar
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Laxmisagar Bhubaneswar City
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Dumuduma, Bhubaneswar City
Construction of 50 MLD Capacity Intake well, 20 MLD WTP with Raw Water and Clear water Rising Main for 24x7 Water Supply to Jharsuguda Municipality including O and M period of 5 years
Construction of ESR and laying of Distribution system Including Automation work to Different Zones for 24X7 water supply to Jharsuguda Municipality Including O and M period of 5 Years
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, H.L. Tank, Bhubaneswar City
Supply and Installation of DG sets with ancillary arrangement at different Pump houses under WATCO Division, Puri
Water Supply to Football Training Centre at Mandalia Ground, Sambalpur
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Dharmavihar, Bhubaneswar City
Cleaning and Desludging of existing sewerage system of different areas for the period of 2 years (24 Months) under WATCO Section, Baramunda H.B. Colony, Bhubaneswar City
Operation and Maintenance of existing sewerage system of different areas under WATCO Section, GGP, Bhubaneswar City
Operation and maintenance of existing sewerage system in BDA colony, Housing board colony and seven acre areas of ward no.8 and 13, Under WATCO Section Niladrivihar, Bhubaneswar
Operation and maintenance of existing sewerage system of different areas under WATCO Section, Maitreevihar, Bhubaneswar City
Operation and maintenance of existing sewerage system of different areas under WATCO Section, Sailashreevihar, Bhubaneswar City
Operation and maintenance of existing sewerage system of different areas under WATCO Section, Chandrasekharpur, Bhubaneswar City
Re-construction of RCC manhole chambers in place of existing damaged brick masonary chamber at Saikh Sahi, jadupur near house of Sk. Mustakin to Sayad Zamal Alis house under WATCO Section, Dumuduma, Bhubaneswar
Operation and Maintenance of existing Sewerage System of different areas under WATCO Section, Unit-IX Road Zone, Bhubaneswar City
Operation and Maintenance of existing Sewerage System of Saheed Nagar areas under WATCO Section, Unit-IX Flat, Bhubaneswar City
Operation and Maintenance of existing Sewerage System of Unit-IX flat, Acharyavihar etc areas under WATCO Section, Unit-IX Flat, Bhubaneswar City
Laying of 200mm DI Distribution main pipe line from Kimbhiria ESR to GGP Labour stand in Ward No.19, BMC, Under WATCO Section GGP Colony, BBSR
Laying of 200mm Dia DI loading main pipe line from Sai Temple to Sameigadia old pump house in Ward No-05,BMC, Under WATCO Section GGP Colony, BBSR
Provision for laying of sewerage system and interconnection of ECCI Sewer line from Medha Basti to CMDE apartment (Debray College road) under WATCO Section, Nayapalli, BBSR
Laying of 150mm dia DI Distribution main pipe line from Sameigadia old pump house to Mancheswar Village in Ward No.5, BMC, under WATCO Section GGP Colony, BBSR
Provision for Shifting of the existing pipe line along the road from OERC Sqr to LPR road via Kanyasharm from 0/600 km to 1/027 km under WATCO Section, Niladri Vihar
Raising of 250mm height of Manhole Chambers in various Catchments of the work Construction of Sewerage System of Sambalpur Town.
Construction of Inspection chambers of size 600 mm square at various locations at in Catchment-8 in Part Commissioning Areas.
Construction of Inspection chambers of size 600 mm square at various locations at Kumbharpada in Catchment-3 in Part Commissioning Areas.
Improvement such as widening and strengthening of Sergarh-Nilgiri-Kaptipada-Medinapur border road from 31.300 km. to 60.00 km. under State Plan in the district of Mayurbhanj
Supplying, installation, testing and commissioning of water purifier cooler 120 ltr capacity inside Shailabala Autonomous Womens College, Cuttack