| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Fee/PreQual/Technical/Finance | -34.20% | ₹14.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.6 LAdmitted-Fee/PreQual/Technical/Finance AT KRUSHNAPRASAD P O PATIKUDA P S KRUSHNAPRASAD DIST PURI PIN 752032 | PURI | ODISHA | 752032 | -33.99% | ₹14.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.8 LAdmitted-Fee/PreQual/Technical/Finance | -33.12% | ₹14.8 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹15.0 LAdmitted-Fee/PreQual/Technical/Finance AT BHIANPADA PO BAULANGA PS GOP DIST PURI | -32.50% | ₹15.0 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹15.4 LAdmitted-Fee/PreQual/Technical/Finance | -30.58% | ₹15.4 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹22.2 L
EMD Value
₹23,000
Closing Date
21 Aug 2026, 5:00 pmClosed
General Manager
General Manager, WATCO Division-I, Vanivihar Square, Bhubaneswar, Odisha, Pin-751022, Phone (0674) -2542821
Laying of 100mm dia DI K-7 Distribution main at Newly Ploted area behind Hyundai/KIA motors in Champadanda Nagar, Ward No.04, BMC, BBSR
2026_GWCDB_137964_1
GMWATCO-I/33(01)/2026-27 Dt.31.07.2026
National Competitive Bid
Civil Works - Water Works
Percentage
30 days
Champadanda Nagar, Ward No.04, BMC, BBSR
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹23,000
Yes
24 Aug 2026
7 Aug 2026
22 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately | 49.5 | cum | 1,738 | ₹86,031 |
| 2 | Cutting metalled road of grannualar course of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T & P etc. all complete as per the direction of engineer-in-charge. | 27 | cum | 697.4 | ₹18,829.8 |
| 3 | Supplying all materials, labour and T&P for Earth work excavation in foundation and trenches in all kind of soil within 50m, initial lead and 1.5m, initial lift dressing levelling, compacting the excavated bed,breaking clods to maximum 5cm to 7cm,sorting of excavted material into serviceable & unserviceable, laying servicable and unservicable material in layers not exceeding 0.3m in depth etc. all complete as per specification and direction of the Engineer-in-charge. | 385 | cum | 299.53 | ₹1,15,319.05 |
| 4 | Supplying all labour materials T & P for Dewatering by Pump with 5HP diesel engine | 15 | hour | 233.1 | ₹3,496.5 |
| 5 | Supplying all materials, labour and T&P for Filling in foundatin and plinth with sand (including cost of sand & labour) etc. all complete as per specification and direction of Engineer-in-charge. | 57.75 | cum | 524.6 | ₹30,295.65 |
| 6 | Supplying and laying of ISI Marked Centrifugally Cast (Spun) Ductile Iron Socket & Spigot Pressure Pipes in standard length with internal cement mortar lining and external bituminous coating conforming to IS 8329:2000 and its subsequent amendments & ISI Marked SB/EPDM Rubber Gasket (IS:5382) for Push-on type Flexible Joints of DI Pipes,including inspection, transportation, handling, loading, unloading, stacking, etc. all complete. (Cost of rubber gaskets shall be inclusive in the cost of pipes of different diameters.) | - | - | - | - |
| 7 | 100mm dia D.I. (K-7) Pipe | 700 | mtr. | 1,233.2 | ₹8,63,240 |
| 8 | Supplying all materials, labour and T&P for Providing, laying, fixing & testing of D.I / C.I Specials, Bends, etc in trenches confirming to IS: 1538 all complete as per specification and direction of Engineer-in-charge including supplying of all labour, material, tools & plants required to perform the work. (excluding earthwork) | 5.39 | Qntl | 15,661.8 | ₹84,417.1 |
| 9 | Supplying all labour materail T and P for Cutting of D.I. / C.I. Pipe Cutting in different dia etc. all complete as per the direction of E.I.C. | 13.82 | mtr | 1,809 | ₹25,000.38 |
| 10 | Supplying all materials, labour and T&P for Providing, laying, fixing & testing of D.I / C.I Specials, Bends, etc in trenches confirming to IS: 1538 all complete as per specification and direction of Engineer-in-charge including supplying of all labour, material, tools & plants required to perform the work. (excluding earthwork) | - | - | - | - |
stage.html
html • 0.06 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
DTCN.pdf
Tender Documents • 1.11 MB
BOQ_604734.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].