Loading…
Loading…
28 live17 closing this weekmost from WATCO Bhubaneswar
28 results • Latest
Newly Construction of 450000 ltr UGR at Karapalli at Kaliabali Sub-division under WATCO division Brahmapur.
Sinking of 200x150mm dia of 2 nos of Tube Well with Installation of Handpumps, 7 nos of Drinking Water Kiosk and 8nos. of New Water Supply Connection to the different kiosk locations Under HinjiliKatuMuncipality
Construction of dedicated water supply system for Gopalpur beach festival including laying of 100 mm dia DI pipeline under WATCO Division, Brahmapur
Laying of 100mm dia DI Distribution pipeline in newly developed areas of Hinjli Katu under WATCO Division, Brahmapur
Installation of 1100 and 700 NB Dia Electromagnetic flow meter and Pressure Transducer at CWRM line for the measurement of real time water flow to greater Brahmapur under WATCO Section, Kaliabali
Supply and Installation of Chlorine, PH and Turbidity Analyser for raw water monitoring at Jagdalpur and Dakhinapur Water Treatment Plant under WATCO Division Brahmapur
Construction and commissioning of 60000 Ltr UGR and pump set with all electric arrangements at LIC Colony, Jobra including laying of 100mm dia DI pipe line under WATCO Section, Ranihat, Kataka
Operation and maintenance of 6 MLD WTP excluding Fuel Energy charges, Chemical and Major spare parts at Jagatpur Ward No.48 of KMC, Kataka (For 2 Years)
Construction of DRINKING WATER KIOSK near Batamangala Temple at Patapola under Ward No 17, Kataka
Cleaning and Desludging of existing sewerage system of K-1, K-2, K-3(B), K-8 at Kalinga Nagar and Ghatikia Village for the period of 2 years (24 months) under WATCO Section Ghatikia, Bhubaneswar City
Operation and Maintenance of existing sewerage system of different areas under WATCO Section Nayapalli, Bhubaneswar City in Ward No.37, 38 and 39 of BMC
Operation and Maint. of existing S/S in Niladrivihar areas (GA Plot, Lumbinivihar, GA Defence Colony, Aryavihar, Vigilance Colony, Pragati Enclave and Prachi enclave, District Center and Sector-1 to Sector-5, Gopabandhu Basti of Ward No.8(P) and 14
Cleaning and Desludging of existing sewerage system of the areas K-4, K-6A, K-6B,K-7 and K-3A for the period of 2 year (24 months) of Ward No.23 under WATCO Section, Kalinga Nagar, Bhubaneswar City
Operation and Maint. of existing s/s of N1, N2, N3, N4, N5 and N6 area including G.A Deptt. Govt. Quarters Near CRPF Square, B and C -Zone and Trunk sewer line from CRPF Square to Jayadev vihar under WATCO Section IRC Village, Bhubaneswar City
Improvement of Water Supply with fitting and fixing of the 100 mm and 150 mm Glove valve for the Implementation of 24x7 water supply to DMA-3 Area UDALA, under WATCO Division Baripada in Mayurbhanj District
Supply and Installation of 415 Volt 1010 KVA LT DG Set including changeover Pannel, Cabling arrangement and D.G Set shed for 2 Nos. LT Motor and LT loads at 9 MGD Positive Suction Pump House at WTP Palasuni, BBSR
Improvement of Water Supply with lane level water Control for the Implementation of 24x7 water supply to DMA-2 Revenue colony Under WATCO Section UDALA, under WATCO Division Baripada in Mayurbhanj District
Improvement of Water Supply to Mendhasahi DMA-I with Lane level control valve for the Implementation of 24x7 water supply to DMA-I Area UDALA, under WATCO Division Baripada in Mayurbhanj District
Supply, installation, testing and commissioning of 3.3 KV HT Motor pump set and HFSR Soft starter and laying of 11KV Cable at Positive suction pump house at 9MGD, Palasuni, Bhubaneswar
Supply, installation, testing and commissioning of 3.3KV, 4 Pole, 250 KW HT Motor at 6MGD pump house of WTP, Palasuni, BBSR
Construction of positive suction pump house with PLC room and construction of operator rest room with washroom arrangement at Govt. Polytechnic, Bhubaneswar
Construction of MHC and Laying of 200mm dia sewer line with interlinking with the trunk sewer for improvement of sewerage system to hospital to administrative building and workshop building area of Sainik school, Chandrasekharpur, Bhubaneswar
Operation and Maintenance of existing Sewerage System of Sambalpur Town for a period of one year
Improvement of Drink from Tap and 24x7 water supply to Lingaraj Vihar, Kargil Basti and Its adjoining areas from Munduli WTP command, BBSR
Construction of ESR with laying of water supply feeder mains with all other ancillary works for Improvement of 24x7 water supply to BDA Transit house, New Mayfair and other adjoining areas, Niladri Vihar, Bhubaneswar
Internal House Sewer connection including construction of Inspection chamber at different areas under WATCO Section Baramunda HB Colony, Bhubaneswar
Construction of 1.50 ML capacity ESR at Zone-26 (Sriharinagar) for Improvement of water supply to Sriharinagar area, Berhampur
Construction of Waste Water Treatment Plant at the Confluence Point of River Daya and Ganguanala (Phase-II) including Operation and Maintenance for a period of Five Years