Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
175 results • Latest
Laying of 200mm DI Distribution main pipe line from Kimbhiria ESR to GGP Labour stand in Ward No.19, BMC, Under WATCO Section GGP Colony, BBSR
Laying of 200mm Dia DI loading main pipe line from Sai Temple to Sameigadia old pump house in Ward No-05,BMC, Under WATCO Section GGP Colony, BBSR
Provision for laying of sewerage system and interconnection of ECCI Sewer line from Medha Basti to CMDE apartment (Debray College road) under WATCO Section, Nayapalli, BBSR
Laying of 150mm dia DI Distribution main pipe line from Sameigadia old pump house to Mancheswar Village in Ward No.5, BMC, under WATCO Section GGP Colony, BBSR
Provision for Shifting of the existing pipe line along the road from OERC Sqr to LPR road via Kanyasharm from 0/600 km to 1/027 km under WATCO Section, Niladri Vihar
Raising of 250mm height of Manhole Chambers in various Catchments of the work Construction of Sewerage System of Sambalpur Town.
Construction of Inspection chambers of size 600 mm square at various locations at in Catchment-8 in Part Commissioning Areas.
Construction of Inspection chambers of size 600 mm square at various locations at Kumbharpada in Catchment-3 in Part Commissioning Areas.
Improvement such as widening and strengthening of Sergarh-Nilgiri-Kaptipada-Medinapur border road from 31.300 km. to 60.00 km. under State Plan in the district of Mayurbhanj
Supplying, installation, testing and commissioning of water purifier cooler 120 ltr capacity inside Shailabala Autonomous Womens College, Cuttack
Repair and renovation of common and disable friendly toilet inside MS old Hostel along with construction of disabled friendly toilet inside SB Womens College, Cuttack
Re-construction of RCC manhole chambers by replacement with brick Masonary manhole chamber at Gangua Bhoi Sahi, Singha Sahi and Kumbhar Sahi, Kapileswar under WATCO Section, Mulapadia, Bhubaneswar
Design, Drawing, Const.Testing and Comm.of Sewerage System, 390 KLD Sewage Treatment Plant (STP) and 95 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Baripada including Operation and Maint.for a period of Five Years
Design, Drawing, Const. Testing and Comm. of S/S, 610 KLD Sewage Treatment Plant (STP) and 11 Nos of 2.5 KLD Effluent Treatment Plant (ETP) inside Capital Hospital, Bhubaneswar including Operation and Maint. for a period of Five Years
Supply, Installation, Testing and Commissioning of On-Grid Ground Mounted / Rooftop, 110 KW Solar Power Plants with Automation (SCADA, PLC) at STP , Basuaghai, Bhubaneswar
Design, Drawing, Const.Testing and Comm. of Sewerage System, 380 KLD Sewage Treatment Plant (STP) and 95 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Jharsuguda including Operation and Maint. for a period of Five Years
Design, Drawing, Const.Testing and Comm.of Sewerage System, 330 KLD Sewage Treatment Plant (STP) and 85 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Sambalpur including Operation and Maint. for a period of Five Years
Design, Drawing, Const. Testing and Comm.of S/S, 220 KLD Sewage Treatment Plant (STP) and 55 KLD Effluent Treatment Plant (ETP) for Sub-division Head Quarter Hospital in Rairangpur, Baripada including Operation and Maint. for a period of Five Years
Design, Supply, Const. Erection, Comm. and Testing, ensuring connectivity permission as per OERC guidelines for net metering of a total aggregated capacity of 100 KWP grid-connected solar rooftop power plants, including comprehensive warranty and ann
Design, Drawing, Const. Testing and Comm.of S/S, 120 KLD Sewage Treatment Plant (STP) and 30 KLD Effluent Treatment Plant (ETP) for Sub-division Head Quarter Hospital in Karanjia, Baripada including Operation and Maint. for a period of Five Years
Design, Drawing, Const. Testing and Comm. of S/S, 90 KLD Sewage Treatment Plant (STP) and 20 KLD Effluent Treatment Plant (ETP) for Sub-division Head Quarter Hospital in Udala, Baripada including Operation and Maint. for a period of Five Years
Design, Drawing, Const. Testing and Comm. of S/S, 140 KLD Sewage Treatment Plant (STP) and 35 KLD Effluent Treatment Plant (ETP) for Sub-division Head Quarter Hospital in Anandapur, Keonjhar including Operation and Maint. for a period of Five Years
Annual Maintenance of Facultative Pond, Wet well and Pumping Station at Kochilaput, inside STP Campus, Bhubaneswar
Repair and renovation of common and disabled friendly toilet inside MS Hostel (Tile, Sanitary and sewerage) of Shailabala (Auto) Womens College, Cuttack
Design, Drawing, Construction, Testing and Commissioning of Sewerage System, 65 KLD Effluent Treatment Plant (ETP) inside District Head Quarter Hospital in Sundargarh including Operation and Maintenance for a period of Five Years
Design, Drawing, Construction, Testing and Commissioning of Sewerage System, 80 KLD Effluent Treatment Plant (ETP) inside Rourkela Government Hospital, Rourkela including Operation and Maintenance for a period of Five Years
Design, Drawing, Const., Testing and Comm. of Sewerage System, 240 KLD Sewage Treatment Plant (STP) and 60 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Khordha including Operation and Maint. for a period of Five Years
Construction of DRINKING WATER -KIOSK at Meria Bazar Chack in Ward No- 22 Zone-19 under WATCO Section, Killa, Cuttack
Construction of Pump House, Pipeline interconnection, Electrification and ancillary works for Improvement of Water Supply to R and R Colony, Jamda, Hirakud
Improvement of water supply to Newly Developed area to Rairangpur Muncipality in Mayurbhanj District
Construction, Testing and commissioning of the 1.00 ML Capacity RCC UGR at 9 MLD WTP Belgadia Under WATCO Division Baripada in Mayurbhanj district
Strengthening and Establishing 46 Nos. Water Quality Testing Laboratory in Water Treatment Plants (WTP)/ULB under WATCO and Water Quality Monitoring for the Period of Ten Years
Design, Drawing, Const. Testing and Comm. of S/S, 160 KLD Sewage Treatment Plant (STP) and 40 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital (City Hospital) in Cuttack including Operation and Maint. for a period of Five Years
Provision for laying of pipe line with ancillary works for water supply to under Ground Reservoir of Rehabilitation project for slum and informal settlements under HFA for Economically weaker section(EWS) at Ghatikia, Bhubaneswar
Provision for laying of 100mm dia water supply pipeline with installation valves and ancillary work to NCC Directorate, Chandrasekharpur, Bhubaneswar
Design, Drawing, Const. Testing and Comm. of Sewerage System, 320 KLD Sewage Treatment Plant (STP) and 80 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Keonjhar including Operation and Maint. for a period of Five Years
Construction of DRINKING WATER KIOSK in Ward No- 56 under WATCO Section, Chhatrabazar-II, Cuttack
Shifting of Utility (Water Supply pipe lines) for widening and strengthening of Taladanda Canal left embankment road from Nayabazar Junction to SH 12 (from 5/130km to 6/730) under WATCO Section, Nayabazar, Cuttack
Improvement of water supply to Mahanadi, Kathajodi and Birupa Residential Building and Clinical Blocks in connection with redevelopment of SCBMCH, Cuttack
Construction of Underground S/S for Town Planning Scheme (T.P.1, 2 and 3) under Jurisdiction of (BDA) on Engineering, Procurement and Construction (EPC) Contract Including Operation and Maintenance for a Period of Five (5) Years
Implementation of 24x7 W/S Project for Town Planning Scheme (T.P. 1, 2and 3) under Jurisdiction of (BDA) on Engineering, Procurement and Construction (EPC) Contract Including Operation and Maintenance for a Period of Five (5) Years
Construction of MHPS for disposal of sewerage of Sailashree Vihar Phase-2 and Phase-7 near Pragati Vihar Chowk under Sewerage Dist-VI, Bhubaneswar
Rehabilitation and Improvement of Sewerage system for Sector-6 and 7 within CDA under Municipal Corporation, Cuttack including O and M period of 5 years
Rehabilitation and Improvement of Sewerage system for Sector-8 and 9 within CDA under Municipal Corporation, Cuttack including O and M period of 5 years
Rehabilitation and Improvement of Sewerage system for Sector-10 and 11 within CDA under Municipal Corporation, Cuttack including O and M period of 5 years
Request for Proposal (RFP) for Selection of Chartered Accountant Firms for Engagement of Divisional Accounts Officer in WATCO
Operation and Maintenance of 7 MLD WTP Excluding Fuel, Energy charges, Chemical and Major spare parts at Mundamal Vyasanagar Municipality, Jajpur Road for the year of 2026
Construction of Waste Water Treatment Plant at the Confluence Point of River Daya and Ganguanala
Laying of sewer network for uncovered areas of Ward No-16 within Puri Municipality
Supply of 500ml water bottle for the devotees of Car Festival-2026 ( Part-I)