| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.2 CrAdmitted-Finance | ₹95.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹95.2 CrAdmitted-Finance | ₹95.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹98.2 CrAdmitted-Finance C O VOLTAS LIMITED SPARE PARTS DEPOT OLD HUTMENT COLONY NCL NIGAHI SINGRAULI M P 486884 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486884 | ₹98.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹99.1 CrAdmitted-Finance | ₹99.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹99.2 CrAdmitted-Finance | ₹99.2 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Koya and Company Construction Limited L17 | UNICORN INDIA PRIVATE LIMITED L14 | Zuberi Engineering Construction Private Limited L11 | Shivam Condev Private Limited L1 | Shree Balaji Engicons Limited L13 | M S INFRAENGINEERS PVT. LTD. L8 | M/s GCKC PROJECTS and WORKS PVT LTD L22 | NALANDA ENGICON PRIVATE LIMITED No Rank | Universal MEP Projects & Engineering Services Limited L3 | R R Infraprojects Private Limited L4 | The Indian Hume Pipe Co. Ltd., L5 | ENVIRO INFRA ENGINEERS LIMITED L7 | EAGLE INFRA INDIA LTD L16 | EAST INDIA UDYOG LIMITED L2 | SCC Infrastructure Private Limited L23 | Shree Girrajjee Infra Heights Private Limited L6 | LCC Projects Limited L15 | S.B.E.ENGINEERING&INFRASTRUCTURE PVT.LTD. L19 | M/S KEYSTONE INFRA PRIVATE LIMITED L10 | LNA Infraprojects Pvt Ltd L18 | VR WATER INFRA COMAPANY L21 | LC Infra Projects Pvt Ltd L9 | K BHUPAL ENGINEERS AND CONTRACTORS PVT LTD L12 | Bansal Infraprojects Pvt ltd L24 | DRS INFRATECH PRIVATE LIMITED L20 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction Work:
Implementation of 24x7 Water Supply Project for Town Planning Scheme (T.P. 1, 2 & 3) under Jurisdiction of Bhubaneshwar Development Authority (BDA)” on Engineering, Procurement & Construction (EPC) Contract Including Operation & Maintenance for a Period of Five Years etc. all complete as per terms, conditions, scope of work and technical specification stipulated in Draft Agreement and as per conditions of RFP Document. The offer price is submitted in accordance with the bidding documents and the agreement in Appendix-IB (Letter Comprising the Financial Bid). | 1 | Job | 1,03,72,63,920 ₹103.7 Cr | 1,00,69,23,920 ₹100.7 Cr | 96,23,84,800 ₹96.2 Cr | 89,64,76,610 ₹89.6 Cr | 98,98,00,000 ₹99.0 Cr | 95,02,48,800 ₹95.0 Cr | 1,09,61,39,388 ₹109.6 Cr | - | 92,71,00,000 ₹92.7 Cr | 92,91,00,000 ₹92.9 Cr | 91,76,00,015 ₹91.8 Cr | 92,84,04,000 ₹92.8 Cr | 1,02,39,83,685.45 ₹102.4 Cr | 89,77,84,676 ₹89.8 Cr | 1,10,48,43,000 ₹110.5 Cr | 93,62,99,532.65 ₹93.6 Cr | 1,00,72,88,000 ₹100.7 Cr | 1,05,00,00,000 ₹105 Cr | 95,80,15,840 ₹95.8 Cr | 1,02,83,50,000 ₹102.8 Cr | 1,09,28,46,800 ₹109.3 Cr | 94,92,16,809 ₹94.9 Cr | 97,08,82,493 ₹97.1 Cr | 1,15,09,13,136 ₹115.1 Cr | 1,10,58,60,000 ₹110.6 Cr |
| 2.00 | Operation & Maintenance (excluding energy charge):
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 1st Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 1,10,14,006 ₹1.1 Cr | 1,06,91,846 ₹1.1 Cr | 1,02,18,915 ₹1.0 Cr | 97,87,000 ₹97.9 L | 1,17,60,000 ₹1.2 Cr | 1,00,90,051.2 ₹1.0 Cr | 1,28,86,400 ₹1.3 Cr | - | 85,46,300 ₹85.5 L | 1,16,18,700 ₹1.2 Cr | 1,19,31,887 ₹1.2 Cr | 1,22,36,400 ₹1.2 Cr | 92,70,904.11 ₹92.7 L | 93,57,032 ₹93.6 L | 1,15,99,000 ₹1.2 Cr | 99,22,528 ₹99.2 L | 1,06,95,712 ₹1.1 Cr | 1,20,00,000 ₹1.2 Cr | 1,31,72,524 ₹1.3 Cr | 1,28,86,400 ₹1.3 Cr | 1,16,04,203 ₹1.2 Cr | 92,05,138 ₹92.1 L | 1,03,09,131 ₹1.0 Cr | 1,43,71,597 ₹1.4 Cr | 80,00,000 ₹80 L |
| 3.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 2nd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 1,10,14,006 ₹1.1 Cr | 1,06,91,846 ₹1.1 Cr | 1,02,18,915 ₹1.0 Cr | 97,87,000 ₹97.9 L | 1,17,60,000 ₹1.2 Cr | 1,00,90,051.2 ₹1.0 Cr | 1,28,86,400 ₹1.3 Cr | - | 90,65,800 ₹90.7 L | 1,16,18,700 ₹1.2 Cr | 1,25,28,481 ₹1.3 Cr | 1,22,36,400 ₹1.2 Cr | 92,70,904.11 ₹92.7 L | 95,13,545 ₹95.1 L | 1,15,99,000 ₹1.2 Cr | 99,22,528 ₹99.2 L | 1,06,95,712 ₹1.1 Cr | 1,20,00,000 ₹1.2 Cr | 94,22,524 ₹94.2 L | 1,28,86,400 ₹1.3 Cr | 1,16,04,203 ₹1.2 Cr | 96,99,650 ₹97.0 L | 1,03,09,131 ₹1.0 Cr | 1,22,43,368 ₹1.2 Cr | 85,00,000 ₹85 L |
| 4.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 3rd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 1,10,14,006 ₹1.1 Cr | 1,06,91,846 ₹1.1 Cr | 1,02,18,915 ₹1.0 Cr | 97,87,000 ₹97.9 L | 1,17,60,000 ₹1.2 Cr | 1,00,90,051.2 ₹1.0 Cr | 1,28,86,400 ₹1.3 Cr | - | 96,09,700 ₹96.1 L | 1,16,18,700 ₹1.2 Cr | 1,31,54,906 ₹1.3 Cr | 1,22,36,400 ₹1.2 Cr | 92,70,904.11 ₹92.7 L | 96,73,079 ₹96.7 L | 1,15,99,000 ₹1.2 Cr | 99,22,528 ₹99.2 L | 1,06,95,712 ₹1.1 Cr | 1,20,00,000 ₹1.2 Cr | 94,22,524 ₹94.2 L | 1,28,86,400 ₹1.3 Cr | 1,16,04,203 ₹1.2 Cr | 1,04,20,859 ₹1.0 Cr | 1,03,09,131 ₹1.0 Cr | 1,22,43,368 ₹1.2 Cr | 90,00,000 ₹90 L |
| 5.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 4th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 1,10,14,006 ₹1.1 Cr | 1,06,91,846 ₹1.1 Cr | 1,02,18,915 ₹1.0 Cr | 97,87,000 ₹97.9 L | 1,17,60,000 ₹1.2 Cr | 1,00,90,051.2 ₹1.0 Cr | 1,28,86,400 ₹1.3 Cr | - | 1,01,86,300 ₹1.0 Cr | 1,16,18,700 ₹1.2 Cr | 1,38,12,650 ₹1.4 Cr | 1,22,36,400 ₹1.2 Cr | 92,70,904.11 ₹92.7 L | 98,35,692 ₹98.4 L | 1,15,99,000 ₹1.2 Cr | 99,22,528 ₹99.2 L | 1,06,95,712 ₹1.1 Cr | 1,20,00,000 ₹1.2 Cr | 94,22,524 ₹94.2 L | 1,28,86,400 ₹1.3 Cr | 1,16,04,203 ₹1.2 Cr | 1,09,83,351 ₹1.1 Cr | 1,03,09,131 ₹1.0 Cr | 1,22,43,368 ₹1.2 Cr | 95,00,000 ₹95 L |
| 6.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 5th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 1,10,14,006 ₹1.1 Cr | 1,06,91,846 ₹1.1 Cr | 1,02,18,915 ₹1.0 Cr | 97,87,000 ₹97.9 L | 1,17,60,000 ₹1.2 Cr | 1,00,90,051.2 ₹1.0 Cr | 1,28,86,400 ₹1.3 Cr | - | 1,07,97,500 ₹1.1 Cr | 1,16,18,700 ₹1.2 Cr | 1,45,03,282 ₹1.5 Cr | 1,22,36,400 ₹1.2 Cr | 92,70,904.11 ₹92.7 L | 1,26,92,251 ₹1.3 Cr | 1,15,99,000 ₹1.2 Cr | 99,22,528 ₹99.2 L | 1,06,95,712 ₹1.1 Cr | 1,20,00,000 ₹1.2 Cr | 94,22,524 ₹94.2 L | 1,28,86,400 ₹1.3 Cr | 1,16,04,203 ₹1.2 Cr | 1,19,11,668 ₹1.2 Cr | 1,03,09,131 ₹1.0 Cr | 1,22,43,368 ₹1.2 Cr | 1,00,00,000 ₹1 Cr |
| 7.00 | Energy Charges for Operation & Maintenance:
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 1st year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 14,30,426 ₹14.3 L | 13,88,586 ₹13.9 L | 13,27,165 ₹13.3 L | 12,79,150 ₹12.8 L | 12,26,400 ₹12.3 L | 13,10,428.8 ₹13.1 L | 16,73,600 ₹16.7 L | - | 13,38,880 ₹13.4 L | 7,00,000 ₹7 L | 16,19,352 ₹16.2 L | 16,73,600 ₹16.7 L | 15,33,000 ₹15.3 L | 6,88,745 ₹6.9 L | 15,06,400 ₹15.1 L | 16,73,600 ₹16.7 L | 13,89,088 ₹13.9 L | 15,00,000 ₹15 L | 13,21,140 ₹13.2 L | 16,73,600 ₹16.7 L | 15,07,077 ₹15.1 L | 22,93,200 ₹22.9 L | 13,38,885 ₹13.4 L | 15,90,087 ₹15.9 L | 13,00,000 ₹13 L |
| 8.00 | Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 2nd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 14,30,426 ₹14.3 L | 13,88,586 ₹13.9 L | 13,27,165 ₹13.3 L | 12,79,150 ₹12.8 L | 12,26,400 ₹12.3 L | 13,10,428.8 ₹13.1 L | 16,73,600 ₹16.7 L | - | 13,38,880 ₹13.4 L | 7,50,000 ₹7.5 L | 16,19,352 ₹16.2 L | 16,73,600 ₹16.7 L | 15,33,000 ₹15.3 L | 6,88,745 ₹6.9 L | 15,06,400 ₹15.1 L | 16,73,600 ₹16.7 L | 13,89,088 ₹13.9 L | 15,00,000 ₹15 L | 13,21,140 ₹13.2 L | 16,73,600 ₹16.7 L | 15,07,077 ₹15.1 L | 22,93,200 ₹22.9 L | 13,38,885 ₹13.4 L | 15,90,087 ₹15.9 L | 13,50,000 ₹13.5 L |
| 9.00 | Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 3rd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 14,30,426 ₹14.3 L | 13,88,586 ₹13.9 L | 13,27,165 ₹13.3 L | 12,79,150 ₹12.8 L | 12,26,400 ₹12.3 L | 13,10,428.8 ₹13.1 L | 16,73,600 ₹16.7 L | - | 13,38,880 ₹13.4 L | 8,00,000 ₹8 L | 16,19,352 ₹16.2 L | 16,73,600 ₹16.7 L | 15,33,000 ₹15.3 L | 6,88,745 ₹6.9 L | 15,06,400 ₹15.1 L | 16,73,600 ₹16.7 L | 13,89,088 ₹13.9 L | 15,00,000 ₹15 L | 13,21,140 ₹13.2 L | 16,73,600 ₹16.7 L | 15,07,077 ₹15.1 L | 22,93,200 ₹22.9 L | 13,38,885 ₹13.4 L | 15,90,087 ₹15.9 L | 14,00,000 ₹14 L |
| 10.00 | Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 4th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 14,30,426 ₹14.3 L | 13,88,586 ₹13.9 L | 13,27,165 ₹13.3 L | 12,79,150 ₹12.8 L | 12,26,400 ₹12.3 L | 13,10,428.8 ₹13.1 L | 16,73,600 ₹16.7 L | - | 13,38,880 ₹13.4 L | 8,50,000 ₹8.5 L | 16,19,352 ₹16.2 L | 16,73,600 ₹16.7 L | 15,33,000 ₹15.3 L | 6,88,745 ₹6.9 L | 15,06,400 ₹15.1 L | 16,73,600 ₹16.7 L | 13,89,088 ₹13.9 L | 15,00,000 ₹15 L | 13,21,140 ₹13.2 L | 16,73,600 ₹16.7 L | 15,07,077 ₹15.1 L | 22,93,200 ₹22.9 L | 13,38,885 ₹13.4 L | 15,90,087 ₹15.9 L | 14,25,000 ₹14.3 L |
Tender Value
₹128.6 Cr
EMD Value
₹1.3 Cr
Closing Date
4 Oct 2025, 5:00 pmClosed
Managing Director
The Managing Director, WATCO Ground Floor, Unnati Bhawan, Satyanagar, Bhubaneswar-751007, Odisha, India (0674) 2571444
Implementation of 24x7 W/S Project for Town Planning Scheme (T.P. 1, 2and 3) under Jurisdiction of (BDA) on Engineering, Procurement and Construction (EPC) Contract Including Operation and Maintenance for a Period of Five (5) Years
2025_WATCO_116949_1
WATCO (W)-13/2025-26 Dtd.08.08.2025
National Competitive Bid
Civil Works - Water Works
730 days
Bhubaneswar
Please refer Tender documents.
4 documents required · 4 mandatory
₹35,400
₹1.3 Cr
Yes
Bhubaneswar
19 Dec 2025
16 Aug 2025
10 Oct 2025
16 Aug 2025
4 Oct 2025
16 Aug 2025
16 Aug 2025 - 26 Aug 2025
29 Aug 2025
Amount
Construction Work: Implementation of 24x7 Water Supply Project for Town Planning Scheme (T.P. 1, 2 & 3) under Jurisdiction of Bhubaneshwar Development Authority (BDA)” on Engineering, Procurement & Construction (EPC) Contract Including Operation & Maintenance for a Period of Five Years etc. all complete as per terms, conditions, scope of work and technical specification stipulated in Draft Agreement and as per conditions of RFP Document. The offer price is submitted in accordance with the bidding documents and the agreement in Appendix-IB (Letter Comprising the Financial Bid).
Operation & Maintenance (excluding energy charge): Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 1st Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 2nd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 3rd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 4th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 5th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Energy Charges for Operation & Maintenance: Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 1st year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 2nd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 3rd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 4th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 5th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
EAST INDIA UDYOG LIMITED (BID ID -3087904)
Universal MEP Projects & Engineering Services Limited (BID ID -3076340)
R R Infraprojects Private Limited (BID ID -3069273)
The Indian Hume Pipe Co. Ltd., (BID ID -3073312)
Shree Girrajjee Infra Heights Private Limited (BID ID -3109077)
ENVIRO INFRA ENGINEERS LIMITED (BID ID -3087704)
M S INFRAENGINEERS PVT. LTD. (BID ID -3108959)
LC Infra Projects Pvt Ltd (BID ID -3090395)
M/S KEYSTONE INFRA PRIVATE LIMITED (BID ID -3108695)
Zuberi Engineering Construction Private Limited (BID ID -3090328)
K BHUPAL ENGINEERS AND CONTRACTORS PVT LTD (BID ID -3107246)
Shree Balaji Engicons Limited (BID ID -3108604)
UNICORN INDIA PRIVATE LIMITED (BID ID -3087806)
LCC Projects Limited (BID ID -3108917)
EAGLE INFRA INDIA LTD (BID ID -3090872)
Koya and Company Construction Limited (BID ID -3069167)
LNA Infraprojects Pvt Ltd (BID ID -3109100)
S.B.E.ENGINEERING&INFRASTRUCTURE PVT.LTD. (BID ID -3108818)
DRS INFRATECH PRIVATE LIMITED (BID ID -3098359)
VR WATER INFRA COMAPANY (BID ID -3077077)
M/s GCKC PROJECTS and WORKS PVT LTD (BID ID -3109807)
SCC Infrastructure Private Limited (BID ID -3101066)
Bansal Infraprojects Pvt ltd (BID ID -3109447)
NALANDA ENGICON PRIVATE LIMITED (BID ID -3101479)
Bidder Name
NALANDA ENGICON PRIVATE LIMITED
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_549410.xls
BOQ • 0.26 MB
RFP.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid