Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.5 Cr+₹1.8 L (1.21%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.6 Cr+₹11.4 L (7.83%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.6 Cr+₹12.5 L (8.59%)Admitted-Finance NOT AVAILABLE | NA | NA | 121004 | L4 | Admitted-Finance | ||
| 5 | L4₹1.6 Cr+₹12.5 L (8.59%)Admitted-Finance AT KHARIAR PO KHARLAR DIST NUAPADA | L4 | Admitted-Finance |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
18 Aug 2026, 5:00 pmClosed
Managing Director
The Managing Director, WATCO Ground Floor, Unnati Bhawan, Satyanagar, Bhubaneswar-751007, Odisha, India (0674) 2571444
Water Supply to Football Training Centre at Mandalia Ground, Sambalpur
2026_WATCO_137464_1
WATCO (W)-12/2026-27 Dtd.29.07.2026
National Competitive Bid
Civil Works - Water Works
Percentage
270 days
Sambalpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹1.6 L
Yes
25 Sept 2026
3 Aug 2026
20 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
3 Aug 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour, T&P for dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres,stacking serviceable and unserviceable materials separately including cost of contractor profit & labour cess etc all complete as per direction of Engineer-in-charge. | 60 | Cum | 1,750.1 | ₹1,05,006 |
| 2 | Cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T & P etc. all complete as per the direction of engineer-in-charge. | 225.6 | Cum | 1,016.5 | ₹2,29,322.4 |
| 3 | Supplying all labour, T&P and earth work in excavation in all kinds of soil within initial lead of 50m lead & initial lift of 1.50m. including rough dressing breaking clods & laying in layers not exceeding 0.30m. In depth, leveling the bed, using pans, vessels for slushy soil & including sundries supervision charges & labour cess etc, as per the direction of Engineer-in-charge. | 1,142.4 | Cum | 306.01 | ₹3,49,585.82 |
| 4 | Supplying & laying of DI pipes in trench : Supplying pipes, all other material,labour, T & P and laying of centrifugally cast(spun) Ductile Iron (DI) pressure pipes with socket and spigot ends in trenches for transportation of sewage conforming to IS - 8329 in standard lengths of class-K9 suitable for tyton joints(rubber gasket jointing) including cutting the pipes to required length, lowering and aligning the pipes inside trench, testing the pipe lines with required water pressure and commissioning including taxes & duties etc all complete as per specification and direction of the Engineer(excluding earth work in excavation, back filling, jointing and disposal of surplus earth).
DI K-9 Pipe | - | - | - | - |
| 5 | 150mm dia DI K-9 pipe | 2,380 | Mtr. | 2,027.9 | ₹48,26,402 |
| 6 | Providing push-on-joints conforming to IS:3114-1994 to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes using Rubber Gaskets Conforming to I.S 5382 of S.B.R quality including testing of joints as per specification complete . | - | - | - | - |
| 7 | 150 mm dia | 455 | Nos. | 261.5 | ₹1,18,982.5 |
| 8 | Supplying all materials, labour, T&P and filling in pipe line/leak pits with sand well watered and rammed including conveyance of all materials to work site, payment of royalty ,additional charges along with DMF &EMF, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge. | 1,122.77 | Cum | 1,065.2 | ₹11,95,974.6 |
| 9 | Supplying all materials, labour, T&P and providing cement concrete(1:3:6) with 40cm size crusher broken black hard granite metal including watering , curing, conveyance of all materials to work site, payment of royalty ,additional charges along with DMF &EMF contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge. | 142.8 | Cum | 6,154.5 | ₹8,78,862.6 |
| 10 | Supplying all labour, materials ,T&P and providing Cement concrete (1:1½:3) with crusher broken hard granite chips on 12mm size CC works including cost of conveyance & royalty ,additional charges along with DMF &EMF,sundries , watering ,curing &lifting &laying concrete at a height of 5mtr. Maximum,contractor profit & labour cess complete etc all complete | 30 | Cum | 8,486.7 | ₹2,54,601 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_603868.xls
BOQ • 0.33 MB
DTCN.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .