Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.7 LAccepted-AOC NULL | L1 | Accepted-AOC L1 | |
| 2 | L2₹69.1 L+₹5.5 L (8.56%)Rejected-AOC LINI NIVAS NALLILA KOLLAM | KOLLAM | KOLLAM | KERALA | L2 | Rejected-AOC L2 | |
| 3 | L3₹79.6 L+₹15.9 L (25.0%)Rejected-Finance MARATHAKAM PADAPPAKKARA P O KARIKUZHY | KARIKUZHY | THIRUVANANTHAPURAM | KERALA | 691503 | L3 | Rejected-Finance Third Lowest |
Tender Value
₹81.0 L
EMD Value
₹50,000
Closing Date
25 Jun 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer RIQCL Trivandrum
KIIFB Budget Speech 2022 2023 Improvements to MC Road to four Lane Stretch 3 Vazhode to Enath (Ch 43/500 to 82/500) Investigation Work
2024_PWD_675222_1
02/RIQCL/TENDER/2024-25
Open Tender
Civil Works - Roads
Item Rate
180 days
Vazhode to Enath
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
26 Sept 2024
11 Jun 2024
27 Jun 2024
11 Jun 2024
25 Jun 2024
11 Jun 2024
Amount
Soil collection & Testing
OD238318/2023-2024 Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.
OD238319/2023-2024 Conducting Moisture content, Soil Classification test, Standard Proctor Test, CBR test, Atterberg limits as per the IS Code guidelines and making report of one soil sample
OD250835/2023-2024 Conducting one test consisting of taking deflection at 10points each @ LHS & RHS at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Characteristic deflection of one test from one test data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81-1997) and submitting in hard and soft copy
OD238321/2023-2024 Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers
DGPS Survey
OD238308/2023-2024 To carry out DGPS survey to establish primary control points - it includes observation of raw data by using dual constellation GNSS receiver, processing, net work, adjustment and submission of data in WGS 84 datum and UTM/TM projection system including traverse report ( One intervisible pair per 5 Km)
OD238309/2023-2024 Providing and fixing RCC pillars for DGPS control points of size 0.3 m x 0.3 m x 0.5 m , 0.1m above ground level and 0.4 m below GL casted in M20 Grade concrete reinforced with 4 nos of 10 mm dia longitudinal bars and 8mm dia stirrups @ 0.15m c/c, firmly fixed in position using PCC of 0.5m wide and 0.4 m deep around the pillars in M15 grade concrete below ground level including painting 2 coats on exposed surface with paint
OD238310/2023-2024 Providing and fixing RCC pillars for DGPS traverse control points at every 250 m interval along the road, of size 0.15 m x 0.15 m x 0.45 m, 0.15 m above ground level and 0.3 m below GL casted in M20 Grade concrete reinforced with 4 nos of 10mm dia longitudinal bars and 8 mm dia stirrups @ 0.15 m c/c, firmly fixed in position using PCC of 0.40 m wide and 0.30 m deep around the pillars in M15 grade concrete below ground level including painting 2 coats on exposed surface with paint
OD238311/2023-2024 To carry out Traverse to establish horizontal control traverse stations on the proposed road stretch running through from one DGPS station at every 2.50 km using electronic total station instrument at maximum of 250 m interval with an accuracy of 1 in 20000 which includes submission of hard and soft copies as per IRC standards
OD238312/2023-2024 Fly levelling to shift levels from given Bench mark value to next Bench mark station to horizontal traverse station and available permanent structures all along the road for the elevation purpose by closed circuit which includes submission of the hard and soft copies as per IRC Standards
56.12.b Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
Traffic Survey
OD255648/2023-2024 Classified Turning movement survey at THREE ARM Junction-Conducting turning movement survey at junction for three days for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classified volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
OD255649/2023-2024 Classified Turning movement survey at FOUR ARM Junction-"Conducting turning movement survey at junction for three days for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classified volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials"
Inventory details of road
OD238317/2023-2024 Collecting and Tabulating all inventory details of Existing road, Culvert, Bridge, Approach roads, junctions and all other road side utilities and amenities in the prescribed format, complete as per the instructions of PWD officials
Subsoil Investigation
56.17.1 Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.1.a Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.a.2 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.2 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.c.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.2 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.5.b Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.9.1 Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10 Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.7 Conducting standard penetration test in bore hole at any depth.
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
OD259760/2023-2024 Conducting Bulk density test on soil samples collected by boring
OD259758/2023-2024 Conducting Moisture content test and Grain size analysis on soil samples collected by boring
OD259820/2023-2024 Conducting Atterberg limits test (LL) on soil samples collected by boring
OD259819/2023-2024 Conducting Atterberg limits test (PL) on soil samples collected by boring
OD259756/2023-2024 Conducting Specific gravity test on soil samples collected by boring
OD259754/2023-2024 Conducting UCC test on soil/rock samples collected by boring
OD259755/2023-2024 Conducting Consolidation test on soil samples collected by boring
OD259759/2023-2024 Conducting Direct Shear test on soil samples collected by boring
OD250740/2023-2024 Compilation of all field data with recommendation for a suitable foundation for bridges, retaining wall, culverts and providing design for ground improvement technique/soil stabilization (report in triplicate) as per the direction from departmental officers - Machine boring
56.15.a Hydraulic Velocity Calculation - River.
56.14.a Cross sectional details - River.
Liju D John
Lamanto T. Somervell
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .