Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.8 LAdmitted-Fee/PreQual/Technical/Finance | -27.00% | ₹32.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹38.2 L+₹5.3 L (16.3%)Admitted-Fee/PreQual/Technical/Finance | -15.10% | ₹38.2 L+₹5.3 L (16.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹39.1 L+₹6.3 L (19.2%)Admitted-Fee/PreQual/Technical/Finance AT P O RAIHARI DIST MAYURBHANJ | MAYURBHANJ | ODISHA | -12.99% | ₹39.1 L+₹6.3 L (19.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹39.3 L+₹6.5 L (19.9%)Admitted-Fee/PreQual/Technical/Finance AT SAUNTAPUR PO GUDESHIRA PS DIST BARGARH BARGARH | BARGARH | ODISHA | 768027 | -12.50% | ₹39.3 L+₹6.5 L (19.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44.9 L
EMD Value
₹44,941
Closing Date
17 Aug 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER (R AND B) DIVISION BGH
O/O THE SUPERINTENDING ENGINEER (R AND B) DIVISION BARAGADA, AT-NEAR GOVT BUS STAND INFRONT OF WOMENS COLLEGE BARAGADA
BUILDING WORK 9CIVIL, EI AND PH)
2026_EICCL_137794_1
IFB-SE PWD BGH No.05 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Bargarh
2 documents required · 2 mandatory
₹6,000
₹44,941
Yes
18 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
4 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the E.I.C.(As Per AR Page No.-1, Item No.-1) | 224.44 | cum | 282.9 | ₹63,494.08 |
| 2 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. (As Per A/R Page No-1, Item No-2) | 138.38 | cum | 567.4 | ₹78,516.81 |
| 3 | Diluting and injecting chemical emulsion (to be supplied free of cost at site of work) for PRE CONSTRUCTIONAL Anti-termite treatment and creating a continuous chemical barrier under and all-round the column pits, wall trenches, basement excavation, top perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment). | 213 | sqm | 138 | ₹29,394 |
| 4 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 35.19 | cum | 5,912.6 | ₹2,08,064.39 |
| 5 | Cement Concrete (1:2:4) using 20mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 15 | cum | 7,637.8 | ₹1,14,567 |
| 6 | Brick work with Flyash Bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Foundation & Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. | 35.45 | cum | 5,635.7 | ₹1,99,785.57 |
| 7 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. i) Column base Footing | 40.36 | cum | 6,449.1 | ₹2,60,285.68 |
| 8 | Plinth Beam | 6.16 | cum | 7,329.2 | ₹45,147.87 |
| 9 | Column in S/S & roof Beam G floor | 16.14 | cum | 15,872.7 | ₹2,56,185.38 |
| 10 | Lintel | 2.49 | cum | 14,221.8 | ₹35,412.28 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.86 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_604454.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .