| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.1 LAccepted-AOC SCO 26 SEC 30 KURUKSHETRA 136118 | KURUKSHETRA | HARYANA | 136118 | L-1 | Accepted-AOC AOC | |
| 2 | L-2₹32.1 L+₹3.0 L (10.3%)Rejected-Finance | L-2 | Rejected-Finance Highest | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Reosponsive | |
| 4 | Rejected-Technical SCO 117 118 FF CABIN NO 104 SECTOR 17B CHANDIGARH | - | Rejected-Technical Non Reosponsive | |
| 5 | Rejected-Technical 8 99 GROUND FLOOR GEETA COLONY NEW DELHI DELHI 110031 | SHAHDARA | DELHI | 110031 | - | Rejected-Technical Non Reosponsive |
Tender Value
₹37.8 L
EMD Value
₹75,700
Closing Date
18 Jun 2019, 5:00 pmClosed
Ritesh Nandal
Executive Engineer, Elect. Division PWD B and R Br., Ambala Cantt
Const. of Examination -cum -Multipurpose Hall in Shri Krishna Govt. Ayurvedic College, Kurukshetra (Pdg. VRF System Only) (Recall).
2019_HRY_79684_1
PWD/Elect-KNL/Elect-AMB/10504
Open Tender
Construction Works
Works
90 days
Ambala
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Executive Engineer, Elect. Division PWD BandR Br.
₹75,700
8 Nov 2021
7 Jun 2019
20 Jun 2019
7 Jun 2019
18 Jun 2019
7 Jun 2019
Amount
PART A
1 Inverter based VRF System
Supply, installation testing & commissioning of Air Cooled VRV/VRF units with Rotary /scroll Compressor capable of modulating capacity ,i,e it should be able to vary speed of the compressor as per the varying load conditions and works on R410A with heating & cooling both.The outdoor unit shall be a factory assembled unit housed in a sturdy weather proof casing constructed form rust-proofed mild steel panels coated with powder coated finish.The outdoor unit shall have multiple Rotary/scroll compressors and be able to operate even in case of breakdown of any one of compressor. Each ODU should have variable compressors. Each unit shall be equipped, with an oil separator to ensure stable operation with long refrigerant piping.Note:- Out door units shall not be of chinese manufacturing and only companies having their own manufacturing are eleigible to qoute. Variable refrigerant flow modular type air- conditioning system suitable for Cooling/Heating by inverter driven capacity control compressor Outdoor unit having minimum COP at 100% Load to be >3.9 & 5.45 at 50% as per ARI Conditions complete in all respect upto entire satisfaction Engineer in charge of work. The manufacturer of ODU and compressor shall be same. i.e the make of compressor shall be identical of the ODU.
1.1 Outdoor units.
18 HP (Heat Pump type) DVM S
2 AHU FLOOR STANDING
2.1 Supply of Air Handling indoor units with evaporator copper coil, fan and fan motor drain pan. The units shall be of following capacities :
30.0 TR (10500 CFM)
2.2 HI WALL INDOOR SPLIT
Supply of indoor units with evaporator copper coil, fan and fan motor drain pan. The units shall be of following capacities :
3 Supply of Remotes (Corded)
4 Supply of Refnets
5 Supply of AHU connecting Kits
10 HP Kits
6 Refrigerant Piping
Interconnecting refrigerant pipe work with (19mm/13 mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the building shall be properly supported with MS hanger complete in all respect upto entire satisfaction Engineer in charge of work.
7 Drain Piping
Supply, installation testing & commissioning of Rigid PVC piping complete with fittings, supports as per specifications and duly insulated with 6 mm thick closed cell nitrile rubber insulation complete in all respect upto entire satisfaction Engineer in charge of work.
7.1 25 mm dia
7.1 32 mm dia
7.2 40 mm dia
8 Control & Transmission Wiring
Providing & fixing control cum transmission wiring of 2 core x 1.5 sqmm copper in suitable conduits between indoor and out door unitcomplete in all respect upto entire satisfaction Engineer in charge of work.
9 Power Cable
Providing & fixing of copper Power conducter armoured cable from Electrical panel to ODUs as per the cable size recommended by the manufacturer complete in all respect upto entire satisfaction Engineer in charge of work.
4 Core X 16 SQmm
10 GRIL/DIFFUSER/DAMPER
Suppply, installation, testing & commissioning of Aluminium extruded grill for supply/return air
Suppply, installation, testing & commissioning of MS volume control damper for supply air
11 Suppply, installation, testing & commissioning of GI DUCTING
GI 24G (0.64mm)
GI 22G (0.64mm)
12 Suppply, installation, testing & commissioning of INSULATION
Ascoustic insulation
Thermal insulation thickness of 6mm
13 Suppply, installation, testing & commissioning of CANVAS
Suppply, installation, testing & commissioning of canvas connection between duct and indoor
ELECTRICAL Panel - 1
14 LT panel for 24 HP - 3 No.
Fabrication of Powder Coated Enclosure fully Compartmentalized made out of TATA make CRCA sheet having 2 mm for load bearing surfaces & 1.6 mm for non load bearing surfaces ,duly processed powder coated having Siemens grey colour. (OUTDOOR TYPE {AS PER IP 6X} PANEL WITH DOUBLE DOOR FRONT WITH PROPER PROTECTION FROM MOISTURE/WATER/etc). = 1
Assembly of Hardware (PVC Channels/MCB Channels/Fibre-Glass/Gaskits/nuts/Bolts/washers/ Terminal blocks, etc). = 1
Complete Wiring inclusive of control wiring, power wiring, Aluminum Solid connections/interconnections including insulators, thimbles, etc. = 1
INCOMING SUPPLY
MCCB 250-320 Amps 4 Pole 50 KA Microprocessor release Protection with Earth/Ground fault protection with CTs of the MCCB make company only. The MCCB shall be double break & the ICS=100% ICU (Make - Schnieder/L&T/Siemens/ABB) = 1
Spreader Link with phase Barriers (Set of 2 for each side of the MCCB) (Make - Schnieder/L&T/Siemens/ABB) = 3
Rotary Mechanism (Make - Schnieder/L&T/Siemens/ABB) = 1
Metering Section
Control MCB SP C Curve. (Make - Schnieder/L&T/Siemens/ABB) = 3
CT's 300/5 (Make - C&S/AE/Nippen) = 3
Indication Lamps LED Type RYB (Make - Schnieder/Siemens/ESSEN) = 3
Outgoing Feeder for 24 HP VRV / VRF Units - 3 nos
63-100A ,3Pole MCCB,25 KA with Thermal magenetic release The MCCB shall be double break & the ICS=100% ICU (for VRV / VRF unit 26 HP) (Make - Schnieder/L&T/Siemens/ABB) = 3
Spreader Link with phase Barriers (Set of 3 for each side of the MCCB) (Make - Schnieder/L&T/Siemens/ABB) = 8
Rotary Mechanism (Make - Schnieder/L&T/Siemens/ABB) = 3
Contactors of equivalent rating as per the machine combination (with auto phase sequence system for proper operation of the VRVs) Each set of machine / VRFs (herein meaning 22 HP section of VRV / VRF) shall have its own independent auto phase sequence corrector (Make Schnieder/L&T/Siemens/ABB) = 6
Over Load Relay (Make - Schnieder/L&T/Siemens/ABB) = 5
SPP (Make - Minilec) = 3
INDICATING LAMPS LED Type (Make - Schnieder/L&T/Siemens/ABB) = 3
Control MCB SP C Curve for control (Make - Schnieder/L&T/Siemens/ABB) = 3
CT's 100/5 (Make - C&S/AE/Nippen) = 9
The panel should be complete in all respect upto the entire satisfaction of Engineer-in-charge of work.
15 Misc Civil Works i.e opening of wall / slab for lying of copper pipe, communication cable & drain etc. and making foundation for ODU's complete in all respect upto entire satisfaction Engineer in charge of work.
16 After completion, operation cost during free comprehensive maintenance period i.e during guarantee period for one year.
modern cooling solution
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .