Executive Engineer Panchayat (R&B) Division, Gir Somnath
Construction of Anganvadi - Nandghar (Frame structure) at Various Village of Una and Gir Gadhada Taluka Dist. Gir Somnath (Package GIR/Anganvadi/Pac-19) (Navabandar -6 , Harmadiya -6 , Vadviyala -3)
321032
11/2026-27 Sr.No.15
Open
Civil Works - Buildings
Gir Somnath
5 documents required · 5 mandatory
₹1,500
DD in favour of Executive Engineer, Panchayat R&B Division - Gir Somnath
₹45,100
5 Jul 2026
5 Jul 2026
5 Jul 2026
15 Jul 2026
5 Jul 2026
Name of Work :- Construction of Anganvadi - Nandghar (Frame structure) at Various Village of
Una and Gir Gadhada Taluka Dist. Gir Somnath (Package GIR/Anganvadi/Pac-
19) ( Navabandar -6 , Harmadiya -6 , Vadviyala -3)
Bill of Quantities
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
1 140.100 Cum Excavation for foundation upto 1.50 164.64 Rupees One One
M.depth including sorting out Hundred Sixty Cubic
&stacking of useful materials i.e. Four and Paise metre
dispositing the excavated stuff up to Sixty Four only
all lead (a)Dense or Hard soil.
2 80.400 Cum Excavation for foundation upto 1.5 281.73 Rupees Two One
m depth including sorting out and Hundred Eighty Cubic
stacking of useful materials and One and Paise metre
disposing off the excavated stuff Seventy Three
upto all lead.(C) Hard Murrum.
3 42.900 Cum Providing and laying cement 2957.81 Rupees Two One
concrete 1:4:8 (1 cement, 4sand,8 Thousand Nine Cubic
Crushed stone aggregates 40 Hundred Fifty metre
mm.Nominal size)and curing Seven and Paise
Eighty One only
complete, excluding cost of
formwork in(a) Foundation and
4 73.800 Cum White Stone Bela mesonry block in 6375.99 Rupees Six One
course in Substructure with stone of Thousand Three Cubic
approved quality in Lime Mortar 1:6 Hundred Seventy metre
(1-Cement : 6- course sand) Five and Paise
Ninety Nine only
including packing the joints etc.
5 20.100 Cum Providing and laying ordinary 7271.95 Rupees Seven One
cement concrete1:1:2 Thousand Two Cubic
(1cement,1sand, 2 gradedstone Hundred Seventy metre
aggregates 20 mm.Nominal size) and One and Paise
Ninety Five only
finishing smooth with curing etc.
complete excluding cost of form
work and reinforcement for
reinforced cement concrete work in
in A) Foundations, footings, base of
columns and mass concrete
6 86.100 Cum Filling in foundation and plinth with 307.41 Rupees Three One
murrum or selected soil in layers of Hundred Seven Cubic
20cm. thickness including watering, and Paise Forty metre
ramming and consolidating etc. One only
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
7 56.400 Cum White Stone Bela mesonry block in 6671.13 Rupees Six One
course in superstructure with stone Thousand Six Cubic
of approved quality in Lime Mortar Hundred Seventy metre
1:6 (1-Cement : 6- course sand) One and Paise
including packing the joints etc.
8 82.200 Sqm White Stone Bela mesonry work in 708.40 Rupees Seven One
partition walls upto 15 cm thickness Hundred Eight Squere
in cement Mortar 1:4 ( 1- Cement : 4- and Paise Forty metre
course sand) only
9 11.400 Cum Providing and laying ordinary 11028.20 Rupees Eleven One
cement concrete1:1.5:3 (1cement, Thousand Cubic
1.5sand, 3 graded stone aggregates Twenty Eight and metre
20 mm .Nominal size) and finishing Paise Twenty only
smooth with curing etc. complete
including the cost of formwork but
excluding the cost of reinforcement
of R.C.C. work in Column (iii)
Having cross-sectional area more
than 0.085 Sq.M. and up to
10 0.900 Cum Providing & laying ordinary C.C. 1:1 9293.83 Rupees Nine One
1/2:3 ( 1 cement ,1 1/2 course sand, 3 Thousand Two Cubic
graded stone agg. of 20 mm nominal Hundred Ninety metre
size )and for R.C.C. LINTELS incl. Three and Paise
Eighty Three only
Finishing smooth with curring of
formwork but excl. the cost of
reinforcement.for above floor upto
Floor ALL level.
11 2.130 Cum Providing and laying cement 7329.99 Rupees Seven One
concrete1:1.5:3 (1cement, 1.5sand, Thousand Three Cubic
3 gradedstone aggregates20 Hundred Twenty metre
mm.Nominal size) and curing Nine and Paise
Ninety Nine only
complete, including cost of
formwork in sill and sides (R.C.C.
band) but excluding the cost of
reinforcement upto floor all level
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
12 2.400 Cum Providing & laying cement concrete 7100.95 Rupees Seven One
1:11/2:3 (1 cement ,11/2 course Thousand One Cubic
sand,3graded stone agg.of 20 mm Hundred and metre
nominal size) for rein-forcement Paise Ninety Five
concrete CHHAJJAS not exceeding
10cm. thickness upto floor two level
incl. finishing the exposed surface
with C.M. 1:3 (1 cement ,3 fine
sand) to give a smooth and ever
surface, centering, formwork and
curring comp.Excl. the cost of
reinforcement. above plinth Upto
floor all level.
13 27.300 Cum Providing & laying C.C. 1:1/2:3 (1 8035.64 Rupees Eight One
cement ,1/2 course sand,3 graded Thousand Thirty Cubic
stone agg.of 20 mm nominal size) Five and Paise metre
and finishing smooth with curring Sixty Four only
etc. comp. incl. the cost of formwork
but excl. the cost of reinforcement
for R.C.C. work in. (A) Beam :-
Having cross sectional Area 0.085 to
0.12 Sqm.upto floor all level
14 27.000 Cum Providing & laying ordinary cement 7258.19 Rupees Seven One
concrete1:11/2:3 (1 cement ,11/2 Thousand Two Cubic
course sand,3 graded stone agg.of 20 Hundred Fifty metre
mm nominal size) exposed work Eight and Paise
with curring etc.comp. incl. the cost
of formwork but excluding the cost
of reinforce ment for R.C.C. work
in. SLAB :- having more then 10cm.
and end upto 13cm. thickness.upto
floor all level
15 7791.000 Kg Providing TMT Bar FE 500/500D 77.29 Rupees One
reinforcement for R.C.C. work Seventy Seven Kilogram
including bending, binding and and Paise Twenty
placing in position complete upto Eight only
floor all level
16 51.600 Sqm Providing fixing of Granite Polished 3205.70 Rupees Three One
Marble Colour or Black frame for Thousand Two Squere
Doors & Windows, Platform Hundred Five and metre
including necessary holdfasts, holes Paise Seventy only
for fixtures and fastenings incl. all
labour & materials etc. comp
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
17 10.800 Sqm Providing and fixing 35mm. Thick 3946.58 Rupees Three One
Panelled,glazed orPanelled and Thousand Nine Squere
glazed shutters for doors,windows Hundred Forty Six metre
andclearstory windows including and Paise Fifty
anodised alluminiumbutt hinges with
necessary screws and Indian
TeakWood shutters with-(B) Partical
board panells.12mm. thick including
applying primer and two coats of oil
painting etc. complete
18 4.200 Sqm Providing and fixing 30mm thick FACTORY 2236.14 Rupees Two One
MADE SOLID BOTH SIDE PRELAM PANEL Thousand Two Squere
PVC DOOR SHUTTER consisting of frame made
out of M.S. tubes of 19 gauge thickness and size
Hundred Thirty metre
of 19mm x 19mm for stiles, top and bottom rails. Six and Paise
M.S. frame shall have a coat of steel primer of Fourteen only
approved makde and manufactures. M.S frame
covered with 5mm thick heat moulded prelim
PVC ‘C’ channel of siz 30mm thickness, 70 mm
width of which 50mm shall be flat and 20mm
shall be tapered in 45 degree Angle on either side
forming stiles, and 5mm thick, 95mm wide pream
PVC sheet out of which 75mm shall be flat and
20mm shall be tapered in 45 degree on the inner
side ot form top and bottom rail and 115mm wide
prelim PVc sheet out of which 75nmm shall be
flat and 20mm shall be tapered on both side to
form lock rail, Top, bottom and lock rails shall be
provided either side of the panel. 10mm (5mm x
2) thick 20mm wide cross PVC sheet shall be
provided as gap insert for top rail and bottom
rails. Panelling of 5mm thck both side prelim PVC
sheet to be fitted in the M.S. frame welded,sealed
to the stiles and rails with 7mm (5mm + 2 mm)
thick x 15mm wide PVC sheet beading on inner
side, and joined togeth with solvent cement
adhesive. An additional 5mm thick PVC strip of
20mm width is to be stuck on the interior side of
the ‘C” chanel using PVC solvent adhesive etc.
complete as per direction of Engineering in
charge, manufacture’s specification and rawing.
19 666.000 Sqm 20mm thick sand faced cement 358.72 Rupees Three One
plaster on wall up to height 10meters Hundred Fifty Squere
above ground level consisting of Eight and Paise metre
12mm thick backing coat of C.M. 1:3 Seventy Two only
(1 cement : 3 sand) and 8mm thick
finishing coat of C.M. 1:1 (1 cement
: 1 sand) etc. complete
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
20 396.000 Sqm Providing 10mm thick cement plaster 152.58 Rupees One One
in single coat on brick/concrete walls Hundred Fifty Squere
for interior plastering upto floor all Two and Paise metre
level and finished even and smooth Fifty Seven only
in (i)Cement mortar 1:3 (1-cement:3-
21 122.400 Sqm Providing and laying 24" x 24" 1324.63 Rupees One One
vitrified 8MM thick tile flooring Thousand Three Squere
over 20MM (average) base of Hundred Twenty metre
cement mortar 1:6 (1- Cement : 6- Four and Paise
Sixty Three only
Coarse Sand) on new surface or
fixing on existing flooring by adhe-
sive material including dismentalling
of existing flooring and jointed with
colour cement slurry including
finished with flush pointing and
cleaning the surface etc. complete.
For Light shade
22 15.300 Sqm Providing and laying Ceramic tiles 943.16 Rupees Nine One
6mm thick in flooring treads of steps Hundred Forty Squere
and landing laid on a bed of 12mm Three and Paise metre
thick cement mortar 1:3 (1cement : 3- Sixteen only
coarse sand ) finishing with flush
pointing in white cement
23 116.700 Sqm Providing and layingCeramic tiles 1091.96 Rupees One One
6mm thick in skrting risers of steps Thousand Ninety Squere
and dedo on 10mm thick cement One and Paise metre
plaster 1:3 (1-cement : 3coarse sand) Ninety Six only
and jointed with white cement slurry
24 395.700 Sqm Applying two coats of Birla or Asian 40.59 Rupees Forty One
acrylic lapy ( putty) & two coats of and Paise Fifty Squere
primer of approved brand and Nine only metre
manufacture on new wall surface to
give an even shade including
thoroughly brushing the surface free
from mortar dropping and other
foreign matter and sand papered
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
25 663.900 Sqm Finishing wall with weather proof 122.14 Rupees One One
exterior emulsion paint on wall Hundred Twenty Squere
surface(two coats) to give an Two and Paise metre
required shape even shade after Fourteen only
thoroughly brushing the surface to
remove all dirt, and remains of loose
powdered materials etc complete
26 396.000 Sqm Distempering (Two coats) with oil 79.29 Rupees One
bound distemper of approved brand Seventy Nine and Squere
and manufacture and of required Paise Twenty metre
shade on wall surface to give an even Eight only
shade over and including a priming
coat with distemper primer of
approved brand and manufacture
after thoroughly brushing the surface
free from mortar dropping and other
foreign matter and also including
preparing the surface even and
27 3.000 No Providing and fixing C.I. Manhole 958.17 Rupees Nine One
cover 0.60 M. x 0.45M. Size having Hundred Fifty Number
weight not less than 35Kg. Eight and Paise
28 3.000 No Proving and fixing water closet 1499.01 Rupees One One
squatting pan (Indian type W.C.Pan) Thousand Four Number
size 580 mm. incl. 100mm. Size P Hundred Ninety
trap & Foot rest(Earthwork, bed Nine and Paise
concrete,foot rests and trap to be
measured and paid for separately)
(A) Vitreous china (I) Long pattern
29 3.000 No Providing and fixing PVC SWR 614.19 Rupees Six One
Nahni trap IS 14735 for drain - 100 Hundred Fourteen Number
mm diameter with jali of the and Paise Ninteen
following nominal diameter of self only
cleansing design with C.I scread
down or hinged grating including the
cost of cutting and making good the
30 9.000 Rm Proving and fixing cast iron spigot 892.39 Rupees Eight One
and socket soil, waste and ventilating Hundred Ninety Running
pipes of the following nominal Two and Paise metre
size.(C) 100 mm. Dia. Thirty Nine only
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
31 3.000 No Proving and fixing in position cowl 505.17 Rupees Five One
vent to pipes(C) 100 mm. Dia. Hundred Five and Number
Paise Seventeen
32 6.000 No Providing and fixing S.W. gully trap 1292.19 Rupees One One
with C.I. grating brick masonry Thousand Two Number
chamber and water tight C.I. cover Hundred Ninety
with frame of 300mm x 300mm size Two and Paise
(inside) with standard weight.(i)
Square mouth traps. (A) 100mm x
100mm size P type.
33 3.000 No Constructing brick masonry road 3504.02 Rupees Three One
gully chamber 450mm x 450mm x Thousand Five Number
775mm with vertical grating Hundred Four and
complete With C.I. Manhole Cover Paise Two only
450x600 mm size
34 3.000 No Providing and fixing washbasin with 2380.56 Rupees Two One
single hole for pillar tap with C.I. or Thousand Three Number
M.S. brackets painted white Hundred Eighty
including sutting holes and making and Paise Fifty Six
good (A) Vitreous China:(ii) Flat
Back washbasin 550 mm x 400mm
size. (i) In white colour. with CP
brass couplin, padastal matching the
shade, waste pipe,rubber pipe etc
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
35 48.000 Rm Providing, laying and jointing in true line 918.67 Rupees Nine One
and level 110 diametre U.P.V.C (Type Hundred Eighteen Running
B) conforming to IS 13592-1992 with and Paise Sixty metre
one end plain and other end socketed Seven only
with rubber ring, & fittings conforming
to ISI 14735-1999 of approved make for
drainage system pipe line, pipe shall be
jointed with each other with rubber
lubricant, pipe shall be fixed on wall
using of PVC clamp of the size 110 mm
diametre x 149 mm length x 145 mm
heigh at every 2000 mm center to center
or shall be concealed in walls as directed
including necessary fittings such as
bends, shoes etc. including testing of
pipes and joints and jointed with
adhesive solvent cement including cost
of all materials.
36 15.000 Rm Providing laying and jointing in true line 834.38 Rupees Eight One
and level 160 mm dia. U.P.V.C. SWR Hundred Thirty Running
Type B pipe conforming to IS 13592- Four and Paise metre
1992 with one end plain and other end Thirty Eight only
socketed with rubbering & fitting
conforming to ISI 14735-1999 of
approved make for drainage system pipe
line, pipe shall be jointed with each other
with rubber lubricant.Pipe shall be fixed
on the wall using of PVC clamp of the
size 110 mm dia X 149 mm length X
mm high at every 2000 mm center to
center or shall be concealed in wall as
directed including necessary fittings such
as bends, shoes etc. including testing of
pipe and joints and jointed with adhesive
solvent cement, including cost of all
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
37 30.000 Rm Providing and fixing concealed 338.24 Rupees Three One
center point to wall ceiling & floor Hundred Thirty Running
CPVC (SDR 13.5) PIPE having Eight and Paise metre
National Sanitation Foundation Twenty Four only
(NSF) seal for potable water of
following dia. nominal bore tube
fittings and clamps including making
good the wall, ceiling and floor etc.
complete. [D] 32mm.
38 30.000 Rm Providing and fixing concealed 208.80 Rupees Two One
center point to wall ceiling & floor Hundred Eight Running
CPVC (SDR 13.5) PIPE having and Paise Eighty metre
National Sanitation Foundation only
(NSF) seal for potable water of
following dia. nominal bore tube
fittings and clamps including making
good the wall, ceiling and floor etc.
complete. [B] 20mm.
39 9.000 No Proving and fixing screw down bib 186.83 Rupees One One
taps of following size.(A) Brass Hundred Eighty Number
screw downbib tap polished bright. Six and Paise
(I) 15 mm. Dia. Eighty Three only
40 3.000 No Proving sock pit of 5.0 Cumt. 3516.51 Rupees Three One
Volume including excavating and Thousand Five Number
filling brick bats with dry masonary Hundred Sixteen
work at top for 45 cm. Height and Paise Fifty
including covering the top with stone
including providing vatas in c.m. 1;3
with finishing,curing etc. complete
41 3000.000 Lit Providing and Fixing double coated 3.95 Rupees Three One Litre
Syntex or Equivalent PVC ( ISI) and Paise Ninety
mark water tank of required capacity Five only
each with all necessary fittings and
connection etc. comp on terrace or as
directed by Engineer - in- charge.
42 3.000 No Providing & Constructing filter 10894.87 Rupees Ten One
Chamber of size 1.76 x 1.21 x 1.20 Thousand Eight Number
mt. Including connecting rain water Hundred Ninety
pipes as per detail drawing or as Four and Paise
Eighty Seven only
directed by engineer incharge.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
43 3.000 No Providing and Constructing 21272.62 Rupees Twenty One
Percolation Sockwell of 1.54 mt One Thousand Number
internal clear diameter and 3.50 Mt Two Hundred
depth including brick masonary in Seventy Two and
Paise Sixty Two
C.M 1:6.,R.C.C. Top slab of 10 cm
thick.filling witth gravel
etc.complete as per detail drawing or
as directed by engineer in charge.
44 153.000 Sqm Providing and laying broken 779.70 Rupees Seven One
china mosaic flooring for terrace Hundred Seventy Squere
using 12 mm to 20 mm broken Nine and Paise metre
pieces of glazed tiles to be laid over Seventy only
cement mortar 1:3 to plain or slope
and to be tempered to bring
mortar creme out upto surface
using white cement including
rounding off junctions and extending
them upto 15 cm along the
wall,clearing with water and oxalic
acid etc. as directed.
45 19.500 Sqm Pro. /Fix. with windows with 3944.48 Rupees Three One
40x40x5mm. Iron angle & frame Thousand Nine Squere
30x30x4 mm size in Double Shutter Hundred Forty metre
with B.G. 20 Gauge Sheet plates Four and Paise
Forty Eight only
with , Hold fasts ,Iron hinges
handles,stopper ,and locking
arrangement etc. comp. Steel welded
is built up section cutting hoisiting
finishing in two coats of oil painting
over coat of primer coat etc. comp.
46 3.000 No Providing, Painting, Lettering " 2020.00 Rupees Two One
Nandghar" Logo board as per design Thousand Number
specified and providing two Twenty and Paise
photograph copies -4 of each in
postcard size of the completed work
as directed 23cm.x45cm.
47 3.000 No Providing, Painting, Lettering, of 50500.00 Rupees Fifty One
Soft-boards, blackboards, Storage Thousand Five Number
areas as per drawing including all Hundred and
direction of Engineer in charge
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
48 3.000 No Providing, Painting, Lettering Mic. 6060.00 Rupees Six One
Play / Activities and out door Thousand Sixty Number
installations & Notice Board as per and Paise Zero
drawing including all material & only
taxes etc. complete as per direction
of Engineer in charge
49 387.000 Kg Providing and fixing M.S. Grills of 180.39 Rupees One One
required pattern to frames of Pipe / Hundred Eighty Kilogram
Angles etc.including Priming coat of and Paise Thirty
approved primer and Two coats of Nine only
Oil painting etc. complete (A) Plain
50 30.000 Point Point wiring for Light / Bell with 2- 465.61 Rupees Four One Point
1.5 sq.mm & earth wire of 1.5 sq.mm Hundred Sixty
(Green) both are of ISI marked 1.1 Five and Paise
KV grade FRLS PVC insulated multi Sixty One only
strand copper wires up to 10 mtr
length , in below type of pipe erected
with 6A Modular type switch / bell
push & accessories and earth
continuity of following type, erected
on PVC / Metallic/Wooden box,
single mounting base frame covered
with textured/metallic/white front
plate modules erected on / in wall /
ceiling as per pipe erected, with
necessary Lamp holder/ceiling rose /
H.D.Connector as directed. (f) with
medium class Rigid PVC pipe and
accessories erected concealed in
wall/ceiling complete Cat- II
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
51 9.000 Point Point wiring for FAN with 2-1.5 654.48 Rupees Six One Point
sq.mm & earth wire of 1.5 sq.mm Hundred Fifty
(Green) both are of .ISI marked 1.1 Four and Paise
KV Grade FRLS PVC insulated Forty Eight only
multi strand copper wires up to
mtr length, in below type of pipe
erected with 6A Modular type switch
and hum free EME step type
electronic fan regulator mounted and
accessories with earth continuity of
following type erected on PVC /
Metallic/Wooden box, single
mounting base frame covered with
textured/metallic/white front plate
modules erected on / in wall / ceiling
as per pipe erected. with necessary
ceiling rose / H.D.Connector as
directed. (f) with medium class Rigid
PVC pipe and accessories erected
concealed in wall/ceiling
completeCat- II
52 6.000 Point Point wiring for on board Looped 236.34 Rupees Two One Point
Plug with 6A Modular type switch & Hundred Thirty
5 pin socket erected on PVC / Six and Paise
Metallic/Wooden box, single Thirty Four only
mounting base frame covered with
textured / metallic/white front plate
modules erected on / in wall / ceiling
with following type accessories Cat-
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
53 6.000 Point Point wiring for Individual Plug with 493.89 Rupees Four One Point
& earth wire of 1.5 sq.mm (Green) Hundred Ninety
both are of ISI marked 1.1 KV grade Three and Paise
FRLS PVC insulated multi strand Eighty Nine only
copper wires up to 10 mtr length, in
below type of pipe erected complete
with Modular type switch & 5 pin
Plug erected on
PVC / Metallic/Wooden box covered
with appropriate front plate modules
erected on / in wall / ceiling as per
pipe erected with following type of
accessories. [I] For 6A Plug and 6 a
switch with 2-1.5 sq.mm Cu. Wire
from nearby switchboard/mcb db
board (f) with medium class Rigid
PVC pipe and accessories erected
concealed in wall/ceiling complete -
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
54 24.000 No supplying and erecting LED indoor 238.36 Rupees Two One
fittings with LEDs of wattage 0.2 Watt Hundred Thirty Number
to 0.5 Watt assembled on single Eight and Paise
MCPCB, with housing used as a heat Thirty Six only
sink shall be made of thick sheet Steel
conforming to IS: 513/CRCA/
aluminium die cast powder coated and
high U.V. & corrosion resistance with
diffuser with company mark/name 160V
to 270V, Power Factor more than 0.95,
THD < 15%, CCT 3000 K to 6500K,
Luminaire efficacy> 85 lumens/watt
LED driver efficiency > 85 %
( fitting required LM-79 & LM-80
Certificates)(NOTE: Below description
have shown ranges of Wattage capacity
of LED fittings.The Engineer incharge
may select any wattage capacity between
the ranges shown.) (A) Tube Light with
integral driver (iii) 18-20 Watts, Surge -
2KV,IP-20, conventional 4 feet cat-II
55 3.000 No providing and erecting Miniature 91.91 Rupees One
circuit breaker single pole 6A to 25A Ninety One and Number
suitable to operate on 240 V A.C. Paise Ninety One
system and having breaking capacity only
10 KA to be erected in existing box.
confirming to IS 8828/1996 with ISI
56 3.000 No Providing & erecting 240 V MCB 278.76 Rupees Two One
double pole switch for lighting Load Hundred Seventy Number
(B Curve) having 10 KA breaking Eight and Paise
capacity & confirms to IS : 8828 in Seventy Six only
existing box having following
capacity (A) 6 to 32 Amp. - Cat-III
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
57 3.000 No Providing and erecting Sheet Steel 1492.78 Rupees One One
powder coated MCB distribution Thousand Four Number
board - flush / surface mounted fitted Hundred Ninety
with busbar, neutral link, earth bar Two and Paise
Seventy Eight only
and DIN rail, Conforms to IS 8623-1
& 3, IEC 61439-1 & 3 without MCB
to house appropriate nos. of
MCBs.(The DBs should be used of
same company of MCB to be used)
suitable for (A) single phase
incoming and horizontal single phase
outgoing (b) sheet steel double door
(IP-43) (iv) 12 Way
58 6.000 No Providing and erecting Approved 1596.81 Rupees One One
make Ceiling fan with double ball Thousand Five Number
bearing ISI mark with condenser Hundred Ninety
A.C. 23OV.50 c/s.1200 mm. sweep Six and Paise
Eighty One only
complete, canopy erected on existing
hook or clamp with earthing.
59 6.000 No Providing and Erecting following 219.17 Rupees Two One
Shock Proof Tissino Type Hundred Ninteen Number
accessories erected on 3 mm thick and Paise
PC (Polycarbonate) Sheet in PVC / Seventeen only
Metal Box erected on Wall / Ceiling.
(14) Electronic Hum Free EME
Socket Type Step Fan Regulator.
60 3.000 No Supplying Erecting Aproved make 2105.85 Rupees Two One
Bracket Fan of ISI Mark with 230 Thousand One Number
Volt A.C., 50 Cy/S 400/450 mm Hundred Five and
Sweep complete on Wall or With Paise Eighty Five
lead cores and connections complete.
(Make shall be Approved by
Engineer in Charge)Category II.
61 3.000 No Providing and erecting Pipe type 994.85 Rupees Nine One
earthing with 40 mm dia 2.5 mtr long Hundred Ninety Number
'B' grade G.I. pipe with necessary Four and Paise
coupling buch buried in specially Eighty Five only
prepared earth pit & G.I. earth wire
of 8 SWG erected & connected as
directed. For using salt and charcoal
/ coke as required for pipe type
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
62 105.000 Rm Mains with 1.1 KV FRLS PVC 62.62 Rupees Sixty One
insulated ISI Marked Standard Two and Paise Running
Copper Conductor wire in following Sixty Two only metre
Type of Pipe to be erected Concealed
in / Flushed on Wall / Ceiling with
1.5 Sq.mm Copper Conductor FRLS
PVC Insulated Standered wire of
Green Colour for Earth continuity of
following size. (A) With Medium
Class Rigid PVC Pipe and
Accessories. (a) 2 wire 1.5 Sq.mm.
63 3.000 No Supplying & erecting approved make 4819.72 Rupees Four One
self-priming domestic monoblock Thousand Eight Number
water pump with 0.5 H.P. motor, Hundred Ninteen
suitable for operation on 230 volts and Paise Seventy
50 c/s. AC supply with metallic
flange, delivery and discharge of
LPM at 10 mtrs.head. Cat. II
64 3.000 No Providing and fixing 600mm x 859.41 Rupees Eight One
450mm bevelled edge mirrror of Hundred Fifty Number
superior glass mounted on 6mm Nine and Paise
thick A.C. sheet or plywood sheet Forty One only
and fixing to wooden pluge with C.P.
brass screws and washers.
65 90.000 Sqm Providing and fixing pre-cast Rubber 708.16 Rupees Seven One
Dye / steel Dye inter locking Hundred Eight Squere
concrete block 60mm thick with and Paise Sixteen metre
grade of concrete M300 pnumatic only
compressed / vibrated mechanically
and as per approved design
Confirming to IS 15658 :
including 35 mm Sand layer for
levelling and filling the joint with
sand in proper line and level as per
guidlines of IRC : SP 63-2018 etc.
66 3.000 No Supplying and Fixing 32 Inch & 18180.00 Rupees One
Display Resolution 1280 x 720 Eighteen Number
L.E.D. TV complete as per direction Thousand One
of Engineer in charge (Product Id. Hundred Eighty
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
67 3.000 No Supplying and Fixing Storage Type 15150.00 Rupees Fifteen One
Water Cooler With Storage Capacity Thousand One Number
15 Liter complete as per direction of Hundred Fifty and
68 3.000 No Providing and Painting of typical 3984.15 Rupees Three One
Logo. Writing letter or figures on Thousand Nine Number
any surface with Thick White Paint Hundred Eighty
Incl. stops, comas, hyphens etc as Four and Paise
required) : Indian (Letters/figures).
as per instruction of engg. In charge.
69 3.000 No Providing and Fixing SS 304 6060.00 Rupees Six One
Foldable Checking bed having size Thousand Sixty Number
1.50 X 0.60 X 0.75 mm including and Paise Zero
using of 25mm dia pipe, SS 2mm only
thick, matter of 25.4 (1") of
density, cover with regine cloth of
approved quality etc completed as
directed by Engineer incharge.
70 3.000 No Providing and Placing IT wood 15150.00 Rupees Fifteen One
writing table having size 1.50 X 0.75 Thousand One Number
X 0.75 mt with one side drawer with Hundred Fifty and
cover with 1 mm thick wood type
Formica including using of all
necessary material & labour etc
completed as directed by Engineer
71 20.250 Rm Providing and fixing Fabric cloth 858.50 Rupees Eight One
Curtain having length 1.8 mtr for Hundred Fifty Running
covering of checking area including Eight and Paise metre
using of alluminum sliding channel Fifty only
etc complete as directed by Engineer
72 60.000 No Providing and Fixing of SS 304 252.50 Rupees Two One
Hanger for bag including using all Hundred Fifty Number
necessary materials like SS rail, Two and Paise
screw etc completed as directed by Fifty only
Engineer lncharge.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
73 3.000 No Providing and Fixing pin cushion 606.00 Rupees Six One
display board having size 1.20 X Hundred Six and Number
alluminum section frame, 18mm
thick WB plywood, nevy blue
Cushion cloth pin etc completed as
directed by Engineer lncharge.
74 5.400 Sqm Providing and fixing PVC modular 7575.00 Rupees Seven One
kitchen cabinet consisting of base Thousand Five Squere
and wall units, made from high Hundred Seventy metre
quality rigid PVC boards (minimum Five and Paise
15-18 mm thick), including shutters,
shelves, drawers, SS hinges,
telescopic channels, handles,
magnetic locks, necessary fittings,
cutting, fixing, complete as per
design and direction of Engineer
75 145.800 Kg Providing and fixing foldable MS 110.77 Rupees One One
ladder having 0.90mt wide & 3.60mt Hundred Ten and Kilogram
long including rod hinge Paise Seventy
arrangement at middle with ladder Seven only
including one coat of red oxide &
two coats of oil paint etc completed
as directed by Engineer incharge.
76 3.000 No Providing and fixing of hook of 303.00 Rupees Three One
10mm or 12mm dia including Hundred Three Number
drilling hole, fixing of male- female and Paise Zero
thrade fastner sealing the same with only
appoxy compound, finishing the
same etc complete as directed by
Engineer lncharge.
77 3.000 No Providing and fixing medical device 1414.00 Rupees One One
& equipment standio meter height Thousand Four Number
measuring scale 2.10mt long Hundred Fourteen
including fixing in wall with using of and Paise Zero
all heavy SS screw, rail etc complete
as directed by Engineer incharge.
78 3.000 No Providing and supplying standard 1010.00 Rupees One One
PVC (Polyvinyl chloride) Chair with Thousand Ten Number
handle of approved design and make and Paise Zero
as directed byEngineer incharge. only
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
79 3.000 No Providing and supplying standard 606.00 Rupees Six One
PVC (Polyvinyl chloride) Chair with Hundred Six and Number
as directed by Engineer incharge.
80 3.000 No Providing & fixing ABC type fire 1515.00 Rupees One One
extinguisher 4 kg ISI marked Thousand Five Number
complete Hundred Fifteen
81 75.000 Rm Providing and fixing 0.60 Meter high 305.53 Rupees Three One
fencing with 1.10 ( Y shape) meter Hundred Five and Running
long M.S. angle posts 40mm x 40mm Paise Fifty Three metre
x 6mm and oil painting 3 coats fixed only
at 3.00 Mt. c/c with Three horizontal
lines and two diagonals of
galvanized steel barbed wire
weighing 9.38 Kg per 100meter
strained and fixed to posts with G.I.
staples including fixing the posts in
Compoundwall masonary & Coping
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Forty Five Lakh Ten Thousand Eight Hundred Ninety Nine and Paise Six only Total Rs.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent (
Should be written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our
tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Una Gir Somnath
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular All.zip
ZIP
Genaral Condition.pdf
11_2026-27 Nivida Gir Som.pdf
Schedule B Pac 19.pdf
SBD Nandghar Pac-19 Una Gir Gadhada.pdf
SPECIFICATION.pdf
DRG Pac-19.pdf
8 Cement.pdf
6 Qty Sheet.pdf
3 Test Schedule.pdf
Download all tender documents and submit your bid