Loading…
Loading…
Tender Value
₹98.7 L
EMD Value
₹99,000
Closing Date
15 May 2026, 6:00 pmClosed
Executive Engineer, Salinity Control Division, Porbandar
REPAIRING ROGHDA BIG CHEKDAM ON BHADAR RIVER AT KUTIYANA OF TALUKA KUTIYANA DIST PORBANDAR UNDER SSJA 2026.
301768
03 of 2026-27
Open
Civil Works - Others
Porbandar
10 documents required · 8 mandatory · 2 optional
₹2,400
Executive Engineer, Salinity Control Division, Porbandar
₹99,000
6 May 2026
6 May 2026
6 May 2026
15 May 2026
6 May 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at such
rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to there levant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledge hammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by
ripping with a tractor of at least 150kw with a single rear mounted heavy duty
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item (with brief Rate
specification and reference to book of Qty Unit (Without
No. (Without GST)
specifications) GST)
1 Dismantling of RCC work viz. slab, beam, lintel, 740.00 Cum 1362.00
barrel, staircase, etc. including removing the steel
from the dismantled portion without damage to
reinforcement sorting and stacking of useful and
unuseful material from the dismantled material as
directed etc comp.
2 Excavation in all sort of strata and formations 100.00 Cum 79.00
incl.depositing the unuseful excavated stuff as and
where directed incl sorting and stacking useful
materials as directed upto 200 mt lead and all lift
etc. complete incl.dewatering.
(A) IN OVERBURDEN INCL. HARD MURRUM.
3 Providing & Laying in position 'NOMINAL MIX' 740.00 Cum 3465.00
cement concrete using cement sand and crushed
machine mix incl. necessary formworks ,centering
,scaffolding compaction by mechanical vibrator
curing as directed with all lead & lift etc
E) Concrete grade 1:1.5:3 and MSA-20mm(Graded)
4 Providing & Laying in position 'NOMINAL MIX' 900.00 Cum 4458.00
cement concrete using cement sand and
crushed aggregate by
machine mix incl. necessary formworks
,centering ,scaffolding compaction by
mechanical vibrator curing as directed with all
lead & lift etc
E) Concrete grade 1:1.5:3 and MSA-
5 Drilling 25mm dia holes at distance as specified and 220.00 Rmt 252.00
depth upto 3.0mt for check dam foundation &
fixing anchor bars of specified diameter with
cement grout incl cleaning holes as directed
etc.(excluding cost of bars)
6 Providing,cutting,bending,binding and fixing in 29.03 MT 76574.00
position as per drawing .TMT BAR , reinforcement
for R.C.C. works and anchor bars incl cost of black
annealed 16 to 18 BWG M.S.. Wire etc.complete
with all lead and lift.
Total Amount :-
Total Amount :-
In words (Ninety Eight Lac Seventy Thousand Four Hundred Sixty Three and Twenty
Two Paisa Only.)
I/We am/are willing to carry out the work at….......................% above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Ded ct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
specification and reference to Quantity Unit Amount
book of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… EE
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference
of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Roghada Big Checkdam.pdf
Roghada Big Checkdam 3rd final copy Uplod NEW.pdf
03 of 2026-27 NEW.pdf
Download all tender documents and submit your bid