| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.0 LAccepted-Finance | ₹64.0 L | L1 | Accepted-Finance QUALIFIED |
| 2 | L2₹66.5 L+₹2.5 L (3.98%)Rejected-Finance | ₹66.5 L+₹2.5 L (3.98%) | L2 | Rejected-Finance DISQULIFIED |
| 3 | L3₹68.6 L+₹4.7 L (7.29%)Rejected-Finance | ₹68.6 L+₹4.7 L (7.29%) | L3 | Rejected-Finance DISQULIFIED |
| 4 | L4₹68.8 L+₹4.9 L (7.63%)Rejected-Finance | ₹68.8 L+₹4.9 L (7.63%) | L4 | Rejected-Finance DISQULIFIED |
| 5 | L5₹69.3 L+₹5.3 L (8.36%)Rejected-Finance | ₹69.3 L+₹5.3 L (8.36%) | L5 | Rejected-Finance DISQULIFIED |
| Sl No | Description | Qty | Unit | M/s Shiv Shakti Associates L4 | M/s Shriyansh Construction L2 | M/s DIVINE CONSTRUCTION L6 | BRIJMOHAN SINGH PANWAR L3 | D S NEGI CONTRACTOR L5 | JAYBEER SINGH L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. (By Manual Means) | 0.15 | Hct. | 20,421.46 ₹3,063.22 | 19,727.59 ₹2,959.14 | 21,000 ₹3,150 | 23,206 ₹3,480.9 | 20,525.88 ₹3,078.88 | 18,332.74 ₹2,749.91 Lowest |
| 2.00 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in -charge | 400 | CUM | 408.41 ₹1,63,363.2 | 394.53 ₹1,57,812.56 | 400 ₹1,60,000 | 300 ₹1,20,000 Lowest | 410.49 ₹1,64,196 | 366.56 ₹1,46,624 |
| 3.00 | Providing concrete in P.C.C. 1:3:6 for plain/reinforced concrete in open foundations complete as per drawings and technical specifications . | 240 | CUM | 6,370.76 ₹15,28,982.4 | 6,154.3 ₹14,77,031.75 | 6,500 ₹15,60,000 | 6,500 ₹15,60,000 | 6,403.33 ₹15,36,799.2 | 5,718.81 ₹13,72,514.4 Lowest |
| 4.00 | R.R. Stone Masonry in 1:5 CM including supply of all materials,labour and T&P etc. required for proper completion of work | 480 | CUM | 4,642.44 ₹22,28,371.2 | 4,484.7 ₹21,52,657.22 | 4,800 ₹23,04,000 | 4,100 ₹19,68,000 Lowest | 4,666.17 ₹22,39,761.6 | 4,167.25 ₹20,00,280 |
| 5.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications RCC grade M20 | 11.12 | CUM | 7,403.35 ₹82,325.27 | 7,151.81 ₹79,528.09 | 8,000 ₹88,960 | 8,412 ₹93,541.44 | 7,441.21 ₹82,746.26 | 6,645.48 ₹73,897.74 Lowest |
| 6.00 | Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications. | 0.57 | MT | 57,987.78 ₹33,053.03 | 56,017.51 ₹31,929.98 | 65,000 ₹37,050 | 65,895 ₹37,560.15 | 58,284.3 ₹33,222.05 | 52,057.05 ₹29,672.52 Lowest |
| 7.00 | Pointing with cement mortar 1:3 i.c. all cost of labour,material T&P etc. | 280 | Sqm | 82.02 ₹22,964.48 | 79.23 ₹22,184.21 | 90 ₹25,200 | 93 ₹26,040 | 82.43 ₹23,080.4 | 73.47 ₹20,571.6 Lowest |
| 8.00 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions. (The work includes filling boulders in the gabions). | 30 | No. | 8,196.85 ₹2,45,905.44 | 7,918.34 ₹2,37,550.24 | 8,300 ₹2,49,000 | 7,000 ₹2,10,000 Lowest | 8,238.75 ₹2,47,162.5 | 7,358.06 ₹2,20,741.8 |
| 9.00 | Providing Lowering into Trenches with true to alignment, Lalying & Jointing of full lenghts of HDPE Pipes of specified grade as per IS:4984-1995 and specifications, with testing of pipe line including supply jointing materials.PN6 | 552 | M | 3,449.6 ₹19,04,179.2 | 3,332.39 ₹18,39,480.38 Lowest | 3,600 ₹19,87,200 | 3,920 ₹21,63,840 | 3,550 ₹19,59,600 | 3,488.8 ₹19,25,817.6 |
| 10.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 17.5 | CUM | 985.86 ₹17,252.62 | 952.37 ₹16,666.42 | 1,030 ₹18,025 | 1,120 ₹19,600 | 990.6 ₹17,335.5 | 884.8 ₹15,484 Lowest |
Tender Value
₹92.3 L
EMD Value
₹1.9 L
Closing Date
11 May 2026, 5:00 pmClosed
SACHIN KUMAR SINGHAL
Office of Executive Engineer Irrigation Division Uttarkashi
Repair,Restoration and Reconstruction work of Sanj Hill Canal in Bhatwari Block of District Uttarkashi.(Reach 0.00 Km to 2.000 Km)
2026_IRDCE_94767_1
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
365 days
BHATWARI
REQUIRED DETAILS TO BE FILLING AS PER STANDARD BIDDING DOCUMENT
3 documents required · 3 mandatory
₹4,720
EXECUTIVE ENGINEER IRRIGATION DIVISION
₹1.9 L
Office of Executive Engineer Irrigation Division U
30 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. (By Manual Means) | 0.15 | Hct. | - | - |
| 2 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in -charge | 400 | CUM | - | - |
| 3 | Providing concrete in P.C.C. 1:3:6 for plain/reinforced concrete in open foundations complete as per drawings and technical specifications . | 240 | CUM | - | - |
| 4 | R.R. Stone Masonry in 1:5 CM including supply of all materials,labour and T&P etc. required for proper completion of work | 480 | CUM | - | - |
| 5 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications RCC grade M20 | 11.12 | CUM | - | - |
| 6 | Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications. | 0.57 | MT | - | - |
| 7 | Pointing with cement mortar 1:3 i.c. all cost of labour,material T&P etc. | 280 | Sqm | - | - |
| 8 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions. (The work includes filling boulders in the gabions). | 30 | No. | - | - |
| 9 | Providing Lowering into Trenches with true to alignment, Lalying & Jointing of full lenghts of HDPE Pipes of specified grade as per IS:4984-1995 and specifications, with testing of pipe line including supply jointing materials.PN6 | 552 | M | - | - |
| 10 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 17.5 | CUM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_112114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_112114.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .