RCC drain construction work from Munshi Nagar Colony to Sau Phuta Road via Munshi Nagar Square.
2025_DOLBU_1097293_1
303/CE/CD/25-26 (1 To 20) Sr No 1 Tender List 20 Date-06.12.2025
Open Tender
Civil Works
Percentage
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹6.3 L
2 Feb 2026
8 Dec 2025
15 Dec 2025
8 Dec 2025
15 Dec 2025
8 Dec 2025
Dismantling of old damage Brick workand stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M
Dismantling of old damage RCC or RB work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches.( S.I. No.251) (Excluding Royalty)
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches.( S.I. No.251) (Excluding Royalty)
Disposal of debris upto 5 km qty Same as Item No. 3
S/L of empty cement bags filled with local earth sand and carriage upto site of work including stching loading and unloading stacking and also including…
Providing 7.5kv desiel pumping set for dewatering including supply of diesel drive & required materials etc.
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches.( S.I. No.251) (Excluding Royalty)
Sand filling in plinth including supply of necessary quality of sand from the site of work and including warering, dressing etc.
Providing and laying cement concrete in 1:4:8 (1 cement : 4 Fine sand : 8 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 281)
RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284
RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284
Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work.
12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc
Fabrication of Mild steel or iron work of grill and stair case railling (When not included in an overall rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts and wastage etc. and there fixing if required for proper completion of work.(S.I.No.502c)
S/F of 19mm thick black mirror inaugration stone of size 900X600mm
Deduction cost of brick bats
Deduction cost of bricks
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.03 MB
T-2tenderdocuments.pdf
Tender Documents • 26.08 MB
BOQ_2020440.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .