Executive Engineer, P.H. Works Division, Vadodara, Dist : Vadodara
Demolition of 04 Nos. of RCC ESR: RCC ESR (2.70 LL * 17 Mtr Ht) at Abhor Sub Head Work, RCC ESR (1.00 LL * 7 Mtr Ht) at Kotna Sub Head Work, RCC ESR (10.00 LL * 15 Mtr Ht) at Muval Sub Head Work, RCC ESR (1.5 LL * 10 Mtr Ht) at Sarsavni Sub Head Work Along with 02 Nos of Pump house at sarsavani sub headwork, 02 Nos of Staff quarters at Chapad SHW & 01 Pump house at Kotna SHW under Padra augmentation RWSS. Ta. Padra, Dist.: Vadodara.
317767
07 OF 2026-2027
Open
Civil Works - Water Works
Vadodara
2 documents required · 1 mandatory · 1 optional
₹900
Executive Engineer, P.H. Works Division, Vadodara
₹8,344
25 Jun 2026
25 Jun 2026
25 Jun 2026
10 Jul 2026
25 Jun 2026
Quantity Unit Particulars Rate Per Amount
Demolition and dismantling of the existing RCC Elevated Storage Reservoir (ESR),
located at Different SHW of old Padra RWSS. The scope includes the complete
dismantling of the RCC structure, including walls, slabs, beams, columns, foundation and
other related components. All serviceable materials such as steel reinforcement bars,
stairs, C.I. pipes, C.I. specials (tees, bends, sluice valves), G.I. pipe railings, and C.I.
manhole frames and covers must be taken away by the contractor at no extra cost for the
conveyance of the demolished scrap (inclu. crushed concrete). The demolition has to be
done mechanically (with machineries) & in the order from top towards bottom of the
ESR safely, using machineries such as Concrete Crushers, etc.
After demolition, the contractor must ensure that the site is cleaned, all debris removed
and the gound is levelled, leaving the site in a clean and safe condition as per the
Engineer-in-charge's instructions.
The rates for this work shall include the cost of all serviceable materials and scrap value
of reusable items. The contractor must comply with all relevant permits, safety
measures, and local regulations. The entire work, from demolition to site cleanup, must
be completed with due diligence, ensuring no debris is left and the site is left in an
acceptable condition, as specified by the Engineer-in-charge.
1.00 Job RCC ESR (2.70 LL * 17 Mtr Ht) at Abhor Sub Head Work -295802.59 Job -295802.59
1.00 Job RCC ESR (1.00 LL * 7 Mtr Ht) at Kotna Sub Head Work -38347.57 Job -38347.57
1.00 Job RCC ESR (10.00 LL * 15 Mtr Ht) at Muval Sub Head Work -539028.99 Job -539028.99
1.00 Job RCC ESR (1.5 LL * 10 Mtr Ht) at Sarsavni Sub Head Work -46243.67 Job -46243.67
Demolition and dismantling of the existing Staff quarters and Pump house, located at Different
SHW of old Padra RWSS. The scope includes the complete dismantling of the RCC structure,
including walls, slabs, beams, columns, and other related components. All serviceable
materials such as steel reinforcement bars, stairs, C.I. pipes, C.I. specials (tees, bends, sluice
valves), G.I. pipe railings, and C.I. manhole frames and covers must be taken away by the
contractor at no extra cost for the conveyance of the demolished scrap (inclu. crushed
concrete). The demolition has to be done mechanically (with machineries) & in the order from
top towards bottom of the structure safely, using machineries such as Concrete Crushers, etc.
After demolition, the contractor must ensure that the site is cleaned, all debris removed and the
gound is levelled, leaving the site in a clean and safe condition as per the Engineer-in-charge's
instructions. The rates for this work shall include the cost of all serviceable materials and scrap
value of reusable items. The contractor must comply with all relevant permits, safety measures,
and local regulations. The entire work, from demolition to site cleanup, must be completed
with due diligence, ensuring no debris is left and the site is left in an acceptable condition, as
02 Nos of Staff quarters at Chapad SHW, 02 Nos of Pump House at Sarsavni SHW and a
Pump House at Kotna SHW Under PADRA RWSS
Total Rs. -834384.02
The bidder shall be required to pay GST directly to the GST department as per apllicable government norms.
In negative amount tenders, the bidder quoting the highest final payable amount to the department shall be considered as L1.
Negative amount (–) indicates payment to the department by the bidder.
GST is calculated on the absolute value of the final quoted amount.
This example is for clarification only and actual payable amount will depend on the actual tendered value and bidder's quoted rate.
Special Condition:
All bidders shall compulsorily submit a “Bahendari” (Affidavit) on ₹300 non-judicial stamp paper as per the prescribed format attached with the tender.
Failure to submit this affidavit along with the bid shall result in the bid being excluded from the evaluation process.
Note: Approximate quantities and amount for the work shown in the Schedule - B.
I /We am/are willing to carry out the work at _________% above/below _______________
percent ( should be written in figures and words ) above / below the tendered. The rate
mentioned above, amount of my/our tender work as under.
*Estimated amount put *Estimated amount put
Deduct _________ % below Add __________% above
(Please strike out which is not applicable)
Special Information
Say Tender Quoted
Amount to be deposited to Department
Amount Percentage
Deputy Executive Engineer
Signature of Contractor Public Health Sani. Sub Division
Gujarat. W. S. & S. Board
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.DMO_2941_01-Apr-2026_744.pdf
2. Affidavit-GwSSB 300 stamp.pdf
3. G.S.T. all Circular.pdf
4. Insurance-GR.pdf
5. Labour cess GR.pdf
6. Time limit circular.pdf
7. Un balacne Rate.pdf
8 .I.P Address GR.pdf
9. Submission of Doc GR.pdf
10. GWSSB Circular.pdf
11. ERP Entry Letter.pdf
12. Price Variation Paripatra 2023.pdf
13. 2024-10-03.pdf
14. B-1 Form 09-14-2022 12.56.pdf
15. Integrity Pact and Insurance.pdf
16. Sch A.pdf
17. Sch B.pdf
18. Specification.pdf
19. nit No. 07.pdf
Download all tender documents and submit your bid