Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC 1350 B SHYAM LAL BAGH NEAR NAND CINEMA HISAR 125001 | HISAR | HARYANA | 125001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹1.3 L (23.3%)Rejected-AOC 1098 SUNDANA ROHTAK 124412 | ROHTAK | ROHTAK | HARYANA | 124412 | L2 | Rejected-AOC L2 |
Tender Value
₹5.3 L
EMD Value
₹10,600
Closing Date
28 Nov 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SDE(CIVIL)
ENGG. CELL BPSMV
Tender for construction of Army Tank Platform in the campus of BPSMV Khanpur Kalan
2022_HRY_245614_1
105
Open Tender
Civil Works
Works
30 days
BPSMV
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹10,600
Yes
2 Jan 2023
15 Nov 2022
29 Nov 2022
15 Nov 2022
28 Nov 2022
15 Nov 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. HSR:-4.14.1 All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: HSR:-6.1.6 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded cum stone aggregate 40 mm nominal size)
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: HSR:-7.20.1 Cement mortar 1:4 (1 cement: 4 coarse sand)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: HSR:-6.14.1 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size)
15 mm cement plaster on the rough side of single or half brick wall of mix : HSR:-11.6.1 1 :4 (1 cement: 4 fine sand)
Centering and shuttering including strutting, propping etc. and removal of form for HSR:-6.30.1 Foundations, footings, bases of columns, etc. for sqm mass concrete
Construction of Embankment with Material obtained from Borrow pits Construction of Embankment with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications Note:- Compensation for earth will vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth will not be required. The position is required to be clearly stated in the cost estimate.HSR:-17.6
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: HSR:-11.96.1 New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete. HSR:-11.58
Providing and fixing granite stone in all shades 15mm to 18 mm thick in sqm skirting /dado, risers of steps, pillars and wall facing, laid in any pattern as specified over base of 12mm thick cement coarse sand mortar 1 :3 and jointed with white cement slurry mixed with pigment to match the shade of Granite including labour for fixing cramps pins and dowels etc.
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level.HSR:-6.34.3 Cold twisted bars Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) (HSR-13.41)
THE DEEPAK GOVT. CONTRACTOR ROHTAK
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .