| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Finance | ₹13.9 L | L1 | Admitted-Finance |
| 2 | L2₹15.0 LAdmitted-Finance | ₹15.0 L | L2 | Admitted-Finance |
| 3 | L3₹15.2 LAdmitted-Finance | ₹15.2 L | L3 | Admitted-Finance |
| 4 | L4₹16.5 LAdmitted-Finance | ₹16.5 L | L4 | Admitted-Finance |
| 5 | L5₹17.9 LAdmitted-Finance | ₹17.9 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Lalit Kumar Rajani Thekedar L2 | MOHD. ZAKI CONTRACTOR L4 | SARLA DEVI CONTRACTOR L3 | JABBAR AHMAD L5 | PARVEJ URF MEENU L7 | TYAGI JI CONTRACTOR L1 | M/S OM BALA JEE CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Silt clearance/trench digging in dry drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 49,986 | Cum | 23.9 ₹11.9 L | 26.06 ₹13.0 L | 23.9 ₹11.9 L | 28.5 ₹14.2 L | 34.34 ₹17.2 L | 19.8 ₹9.9 L | 36 ₹18.0 L |
| 1.02 | Silt clearance/trench digging in wetted drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 2,736 | Cum | 27 ₹73,872 | 33.43 ₹91,464.48 | 30.7 ₹83,995.20 | 30.35 ₹83,037.60 | 44.05 ₹1.2 L | 19.5 ₹53,352 | 35 ₹95,760 |
| 1.03 | Silt clearance/trench digging in under water in drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 3,878 | Cum | 50.5 ₹2.0 L | 56.1 ₹2.2 L | 51.5 ₹2.0 L | 61.4 ₹2.4 L | 73.92 ₹2.9 L | 19 ₹73,682 | 35 ₹1.4 L |
| 1.04 | Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning | 14,557 | Sqm | 2.55 ₹37,120.35 | 2.85 ₹41,487.45 | 2.6 ₹37,848.20 | 3.1 ₹45,126.70 | 3.76 ₹54,734.32 | 19 ₹2.8 L | 2 ₹29,114 |
Tender Value
Refer Docs
EMD Value
₹59,000
Closing Date
30 May 2026, 2:00 pmClosed
Executive Engineer
Office Sharda Sagar Division Pilibhit
Cleaning of Puranpur Drain Between Km.0.000 to Km 32.500 for Year 2026-27(Lot 02)
2026_UPIDC_1143214_24
02/E.E/2026-27
Open Tender
Civil Works
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹59,000
1 Jun 2026
25 May 2026
30 May 2026
25 May 2026
30 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Silt clearance/trench digging in dry drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 49,986 | Cum | 518 | ₹2,58,92,748 | Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge |
| 1.02 | Silt clearance/trench digging in wetted drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 2,736 | Cum | 100 | ₹2,73,600 | Earth work in embankment by power tranported earth with a leadUpto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders Diversion of Road. |
| 1.03 | Silt clearance/trench digging in under water in drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 3,878 | Cum | 100 | ₹3,87,800 | Earth work in embankment by power tranported earth with a leadUpto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders Diversion of Road. |
| 1.04 | Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning | 14,557 | Sqm | 10 | ₹1,45,570 | Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc. |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_2160556.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid