| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 CrAccepted-AOC | ₹21.5 Cr | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹24.6 CrRejected-AOC | ₹24.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹25.0 CrRejected-AOC | ₹25.0 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹25.2 CrRejected-AOC | ₹25.2 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹27.2 CrRejected-AOC | ₹27.2 Cr | L5 | Rejected-AOC L5 |
Tender Value
₹27.5 Cr
EMD Value
₹5 L
Closing Date
10 Apr 2023, 5:00 pmClosed
Superintending Engineer, MICC Ernakulam
Office of the Superintending Engineer, MICC, Civil Station, Kakkanad, Ernakulam- 682030
Construction of Check dam across Bharathapuzha in Pattambi Palakkad district
2023_Irrig_566070_1
9/IRR/IA/TR/1795/2022_5_1_1/1
Open Tender
Civil Works - Others
545 days
Pattambi in Palakkad Dt
Please refer Tender documents.
7 documents required · 7 mandatory
₹19,518
Yes
₹5 L
Yes
MICC Ernakulam
31 Jul 2023
13 Mar 2023
12 Apr 2023
13 Mar 2023
10 Apr 2023
28 Mar 2023
13 Mar 2023 - 10 Apr 2023
27 Mar 2023
Amount
Appendix I
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD5168/2022-2023:Putting up ring bund of bottom width 8.00m, top width 5.00m. with earth filled cement bags having a core gap of 1.80m. and filling with puddle clay to a height of 3.00m including dismantling of the bund after completion of the work etc. complete as directed by the deptl. officers Details for 20.00m.
60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD5735/2022-2023:Providing casing pipe of 1000 mm inner dia made out of 6mm thick MS plate for cast in site board piles and erecting at site to line and levels and driving down to the required depth including cost and conveyance of all materials all fabrication charges and welding charges with all leads and lifts etc. Complete according to the necessity at site as per the direction of Engineer in charge at site
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
OD30683/2022-2023:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-30 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.1000 mm dia piles
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.
60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
OD29768/2022-2023:Providing Z sheet piles of size 400X185X7.5/8.5mm.Hot rolled steel sheet piling sections conforming to IS 2314-1989 or Hot rolled equivalent Z steel sheet piles having equel or more values of section modulus, minimum yield stress of 350 MPa and minimum thickness of 8.5mm driving down vertically in lines and levels,with vibratory pile driving pile driving unit conforming to IS 11150-1993 and all accessories including all labour ,hire charges, all leads and lifts ,all other incidental charges etc. complete as per the directions and witnessed and convinced by Asst. Engineer and Asst. Executive Engineer in charge of work which shall be video graphed and recorded for reference.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.5.3:DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m in rock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD30839/2022-2023:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of as per drawing including drilling holes and filling the gap with cement grout( 0.10kg/each) etc complete.
OD5272/2022-2023:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD29781/2022-2023:Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 100 tonnes capacity Initial test
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD30704/2022-2023:Supplying and stacking hard granite broken stone of different sizes and Laying and spreading the same after taking measurements for inverted filter in uniform thickness as per the direction of engineer in charge at site.
OD30708/2022-2023:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
VRR CONSTRUCTION
P.G. CONSTRUCTIONS
Infab Infrastructure Pvt Ltd
ABM4Builders
PAULOSE GEORGE CONSTRUCTION COMPANY PVT LTD
ABDUL RAHIMAN T.A
POONAM GRAH NIRMAN PVT LTD
Bidder Name
POONAM GRAH NIRMAN PVT LTD
A.Ibrahimkutty
ABM4Builders
ABDUL RAHIMAN T.A
P.G. CONSTRUCTIONS
PAULOSE GEORGE CONSTRUCTION COMPANY PVT LTD
Infab Infrastructure Pvt Ltd
VRR CONSTRUCTION
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf