Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.5 LAccepted-AOC | L1 | Accepted-AOC Agreement to Muhammed sherif is done by 02/11/20 So AOC is issued | |
| 2 | L2₹55.0 L+₹2.5 L (4.76%)Rejected-Finance | L2 | Rejected-Finance Second lowest | |
| 3 | L3₹55.0 L+₹2.5 L (4.84%)Rejected-Finance | L3 | Rejected-Finance Third lowest |
Tender Value
₹55.8 L
EMD Value
₹50,000
Closing Date
24 Aug 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Soil Conservation Officer, Alappuzha
District Soil Conservation Office,Zilla Panchayath building, Third Floor, Collectrate P O, Alappuzha
Retaining wall 1.50m height
2020_DSSC_366939_2
C(2)575/2020-5
Open Tender
Civil Works - Others
Item Rate
365 days
mannar panchayath ward 18
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,500
online
₹50,000
9 Nov 2020
29 Jul 2020
26 Aug 2020
29 Jul 2020
24 Aug 2020
29 Jul 2020
29 Jul 2020 - 24 Aug 2020
60 days
Amount
Manappuram puncha mannar panchayath Retaining wall 1.50m height , 1175 Rm
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.5 Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, griders bressumers and cantilivers.
4.1.5 Proving and laying in possition cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level 1:32:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size)
2.216.1 Extra for every additional lift 1.50m or part there of inexcavation / banking excavated or stacked materials. All kind of soil.
Saijith A S
A GOPALAKRISHNAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_529518.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .