| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹1.8 Cr+₹1.8 L (1.00%)Rejected-AOC | ₹1.8 Cr+₹1.8 L (1.00%) | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
29 Feb 2024, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 2 roads in Uppiliyapuram Block in Tiruchirappalli District under TNRRIS 2021-22 Package No.1
2024_RDTN_428933_1
E1/5988/2021 Dated 20.02.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.8 L
DRDA Tiruchirappalli
8 Mar 2024
23 Feb 2024
29 Feb 2024
23 Feb 2024
29 Feb 2024
23 Feb 2024
26 Feb 2024
Amount
Upgradation of the Road From Eragudi main Road to Okkarai Main Road in Okkarai Panchayat Km 0/0 - 1/290 ( R- 307 VPR ) Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A KM 0/0 - 1/290
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS KM 0/0 - 1/290
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. KM 0/0 - 1/290
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0 - 1/290
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0 - 1/290
Providing and Laying of Hot applied Thermoplastic compound 2.50 mm thick including reflectorising glass beads @ 250 gms per area , thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC:35. The Finished surface to be level uniform and free from streaks and holes etc., complete as per MORT & H specfication No.803 KM 0/0 - 1/290
Construction of Retaining Wall Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of sand and filling in to the basement including cost and all labours charges etc complete
CC 1:4:8 mix using 40metal including cost and conveyance of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete -10 cum
CC 1:3: 6 mix using 40 metal including cost and conveyance of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete -10 cum
Cost , supply and erection of steel centering for sides and soffits of all labours charges etc complete and conveyance of all materials to site and all labour charges etc complete
Provision for Weeb Holes
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision for Sign Board.
Provision for Name Board etc complete.
Strengthening of the road From Naganallur to Koppampatty Road (via) rice mill road in Naganallur Panchayat Km 0 / 0 - 4/150 ( R - 105 VPR ) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete KM 0/0 - 4/150
Picking the existing mettaled surface and sectioning including all labour charges etc, complete.KM 0/0 - 4/150
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A KM 0/0 - 4/150
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS KM 0/0 - 4/150
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 - 4/150
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. KM 0/0 - 4/150
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0 - 4/150
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0 - 4/150
Providing and Laying of Hot applied Thermoplastic compound 2.50 mm thick including reflectorising glass beads @ 250 gms per area , thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC:35. The Finished surface to be level uniform and free from streaks and holes etc., complete as per MORT & H specfication No.803 KM 0/0 - 4/150
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision for Sign Board.
Provision for Name Board etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
K SARAVANAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .