| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.1 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹42.0 Cr+₹86.6 L (2.10%)Admitted-Finance AT LADUGAON PS KOKSARA DIST KALAHANDI PIN 766019 ODISHA | LADUGAON | KALAHANDI | ODISHA | 766019 | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹39.2 Cr
EMD Value
₹39.2 L
Closing Date
27 Jan 2026, 5:00 pmClosed
CE AND BM MB BURLA
Office of the Chief Engineer and Basin Manager Mahanadi Basin Burla At Po Burla Dist Sambalpur Odisha Pin 768017
Construction of Box Conduit over Bargarh Distributary from RD 3561m to 5473m Phase I Canal Front Development in Bargarh Town from RD 4145m to RD 5140m
2026_CEBBU_124182_1
CE AND BM MB 39-2025-2026(Online)
Open Tender
Civil Works - Bridges
Percentage
730 days
At Bargarh Block Bargarh Dist Bargarh
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹39.2 L
22 Jun 2026
5 Jan 2026
28 Jan 2026
5 Jan 2026
27 Jan 2026
5 Jan 2026
5 Jan 2026 - 27 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantalling and removing cement concrete including stacking, the useful materials for reuse and removing debris abate from worksite with all lead etc. complete as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 2 | Earthwork in slushy soil (in water upto 0.60m. Depth requiring the aid of pans and vessels) within 50 m initial lead and 1.50m initial lift as per the direction and specification of the Engineer-In-Charge. | 1 | Cum | 1 | ₹1 |
| 3 | Earthwork excavation of foundation in hard soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge | - | Cum | 1 | - |
| 4 | Filling in foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 0.6 | Cum | 1 | ₹0.6 |
| 5 | Cement concrete M-15 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 0.8 | Cum | 1 | ₹0.8 |
| 6 | Reinforced Cement Concrete M-25 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | - | Cum | 1 | - |
| 7 | Cement concrete M-20 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | - | Cum | 1 | - |
| 8Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge. for (i) Foundation | |||||
| 8.1 | ii) Wall | - | Sqm | 1 | - |
| 8.2 | III) Slab | 1 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
DTCNBoxConduit.pdf
Tender Documents • 7.46 MB
BOQ_574439.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .