| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAccepted-Finance | ₹37.9 L | L1 | Accepted-Finance PLACE WORK ORDER |
| 2 | L2₹43.3 L+₹5.3 L (14.0%)Rejected-Finance | ₹43.3 L+₹5.3 L (14.0%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹46.3 L+₹8.4 L (22.0%)Rejected-Finance | ₹46.3 L+₹8.4 L (22.0%) | L3 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | HARIOM ENTERPRISES L1 | Janardhan and sons L3 | M/S K.K.ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Items : | ||||||
| 1.01 | Dismantling of Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings | 42 | m2 | 1,890 ₹1,890 | 1,680 ₹1,680 Lowest | 1,722 ₹1,722 |
| 1.02 | Dismantling structural steel work including doors, gates but excluding framed truss etc. | 6 | qtl | 4,500 ₹4,500 | 3,000 ₹3,000 Lowest | 4,062 ₹4,062 |
| 1.03 | Demolition of reinforce cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) | 11.35 | m3 | 18,511.85 ₹18,511.85 | 10,215 ₹10,215 Lowest | 11,088.95 ₹11,088.95 |
| 1.04 | Surface excavation in soft/ loose soil n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out including removing shrubs, vegetation, grass, bush, weed, trees and saplings, undergrowth, roots, and trees not exceeding 30cm grith (measured one metre above ground level), in soft/ loose soil. | 190 | m2 | 12,350 ₹12,350 | 9,500 ₹9,500 | 7,790 ₹7,790 Lowest |
| 1.05 | Dismantling wall/floor tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 129 | m2 | 12,900 ₹12,900 | 77,400 ₹77,400 | 8,643 ₹8,643 Lowest |
| 1.06 | Excavating in trenches in hard/ dense soil, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out. | 30 | m3 | 24,000 ₹24,000 | 10,500 ₹10,500 Lowest | 12,630 ₹12,630 |
| 1.07 | Removing excavated material, exc. 250m but n exc 500m outside the periphery of area under clearance and depositing where as directed by Engineer in charge. | 30 | m3 | 9,720 ₹9,720 | 7,740 ₹7,740 Lowest | 10,410 ₹10,410 |
| 1.08 | M&L Hardcore of broken stones or boulder, gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface. | 12 | m3 | 24,840 ₹24,840 | 21,600 ₹21,600 | 14,532 ₹14,532 Lowest |
| 1.09 | M&L Cement concrete in foundations, filling and mass concrete, Type C2, 1:3:6 (40mm graded aggregate). | 2 | m3 | 11,724 ₹11,724 | 9,500 ₹9,500 | 8,222 ₹8,222 Lowest |
Tender Value
₹49.7 Cr
EMD Value
₹99,490
Closing Date
9 Mar 2026, 10:00 amClosed
The Chief General Manager
Ordnance Factory Varangaon
Repairs and replacement of damaged shed with RCC structure for bleaching mixing and dosing plant unit, repair and strengthening of Reinforced Cement Concrete slab of Aeration foundation tank near Alum mixing and dosing unit, Repair and renovation of
2026_MIL_267368_1
RD2509/EO/09
Open Tender
Civil Works
Works
180 days
Ordnance Factory Varangaon
3 documents required · 3 mandatory
₹0
₹99,490
Yes
11 Jul 2026
17 Feb 2026
10 Mar 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Items : | |||||
| 1.01 | Dismantling of Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings | 42 | m2 | 35 | ₹1,470 |
| 1.02 | Dismantling structural steel work including doors, gates but excluding framed truss etc. | 6 | qtl | 623.6 | ₹3,741.6 |
| 1.03 | Demolition of reinforce cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) | 11.35 | m3 | - | - |
| 1.04 | Surface excavation in soft/ loose soil n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out including removing shrubs, vegetation, grass, bush, weed, trees and saplings, undergrowth, roots, and trees not exceeding 30cm grith (measured one metre above ground level), in soft/ loose soil. | 190 | m2 | 53.1 | ₹10,089 |
| 1.05 | Dismantling wall/floor tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 129 | m2 | 89.5 | ₹11,545.5 |
| 1.06 | Excavating in trenches in hard/ dense soil, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out. | 30 | m3 | 675 | ₹20,250 |
| 1.07 | Removing excavated material, exc. 250m but n exc 500m outside the periphery of area under clearance and depositing where as directed by Engineer in charge. | 30 | m3 | 582.6 | ₹17,478 |
| 1.08 | M&L Hardcore of broken stones or boulder, gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface. | 12 | m3 | 2,070.8 | ₹24,849.6 |
| 1.09 | M&L Cement concrete in foundations, filling and mass concrete, Type C2, 1:3:6 (40mm graded aggregate). | 2 | m3 | 5,862 | ₹11,724 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TERMSANDCONDITIONSRD2509.pdf
Tender Documents • 0.14 MB
ATTACHMENTS1.pdf
Other Document • 0.38 MB
BOQ_310834.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .