| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L₹3.7 LAccepted-AOC | L | Accepted-AOC Lowest | |
| 2 | L2₹4.0 LRejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹8,648
Closing Date
21 Nov 2024, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive, Electrical wing irrigation Sub division Aluva
G E N E R A L - A M C 2 0 2 4 - 2 5 - F u l l y Comprehensive Annual Maintenance Contract Neeleeswaram No1 and Neeleeswaram No2 LIS under Electrical irrigation section Kalady- General Electrical Work
2024_Irrig_694670_18
PWD/BLDG/KLDY/6889/2024-2025
Open Tender
Electrical Works
Item Wise
365 days
Kalady
Please refer Tender documents.
11 documents required · 11 mandatory
₹765
₹8,648
3 Feb 2025
12 Nov 2024
23 Nov 2024
12 Nov 2024
21 Nov 2024
12 Nov 2024
Amount
Motor Overhauling Works
OD241155/2023-2024:Dismantling the 50 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD241156/2023-2024:Dismantling the 100 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD267774/2023-2024:Dismantling the 75 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD241149/2023-2024: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD241151/2023-2024: Lowering down and erecting 50 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD241152/2023-2024: Lowering down and erecting 75 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD267779/2023-2024: Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD76083/2024-2025:Supply and filling oil for pumps
OD241159/2023-2024:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make.
OD26786/2024-2025:Supply and fixing of 200/5 A, 10 VA accuracy class 1, resin cast metering CT
OD241160/2023-2024: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD241161/2023-2024:Supply and Installing 20 W LED Tube light.
OD241162/2023-2024:Supply and clamping the 25 x 3mm GI strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
OD241163/2023-2024:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD241164/2023-2024:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD241165/2023-2024:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
OD251979/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6315 , SKF / FAG or equivalent, suitable for 75 HP-100 HP as per the direction of Departmental staff at site.
OD241167/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 75 HP motor / pump set as per the direction of Departmental staff at site.
OD101770/2024-2025:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6313 , SKF / FAG or equivalent, suitable for 75 HP motor / pump set, as per the direction of Departmental staff at site.
OD253163/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (50-120 HP) as per the direction of Departmental staff at site.
OD76255/2024-2025:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 , SKF / FAG or equivalent, as per the direction of Departmental staff at site.
OD252008/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 70 or equivalent suitable for 50 HP motor's fully automatic star delta starter
OD76171/2024-2025:Supply and fixing 185A 3 pole Power contactor for 100HP motor starter AC3 rating at 415v with Ac coil, Auxiliary contacts 2NO/NC (L&T or equivalent make)
OD1341/2024-2025:Supply of electronic timer for FASD(L&T ST 80329000 ) or equivalent
OD76168/2024-2025:Supply and fixing of L&T Overload relay for 100 HP Squirrel cage motor starter
OD76309/2024-2025:Supply , Conveyance and fitting 315/400 A, HRC Fuse Base with suitable HRC Fuse
OD101748/2024-2025:Supply , installation, Testing and Commissioning of Phase Failure relay and UV release in conjunction with existing L&T MCCB in the Panel board using 40A 4 pole Isolator,3 Indicators and 6 Numbers of 6A SP MCB with suitable Control Wiring to get complete protection against Single phasing, Under voltage, Over voltage etc.
Motor AMC
OD271875/2023-2024:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through out the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total two motors , 12 months for each motor)
OD271785/2023-2024:Fully Comprehensive Annual Maintenance of 50 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD241174/2023-2024: Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD241178/2023-2024: Fully Comprehensive Annual Maintenance of 75 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD267780/2023-2024:Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed. (Total two motors, 12 months for each motor)
Motor Lifting Works
OD241181/2023-2024: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD241183/2023-2024: Lifting the 50 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD241184/2023-2024:Lifting the 75 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD267781/2023-2024:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
Roy M.X (BID ID -1983586)
Bidder Name
Edward P J
Roy M.X
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1102423.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .