Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC M 1154 WARD NO 07 KAPILDHARA COLONY POST BIJURI DISTT ANUPPUR M P PIN 484440 | BIJURI | ANUPPUR | MADHYA PRADESH | 484440 | ₹13.2 L Quoted ₹11.2 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹12.7 LRejected-Finance | ₹12.7 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹13.1 LRejected-Finance | ₹13.1 L | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹14.1 LRejected-Finance | ₹14.1 L | L4 | Rejected-Finance L4 bidder |
| Sl No | Description | Qty | Unit | ranvijay singh L4 | NAIMUDDIN ANSARI L3 | service idea L1 | VIVEK KUMAR L2 |
|---|---|---|---|---|---|---|---|
| 1.00Description of Work | |||||||
| 1.01 | Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 ) | 64.8 | Cum | 713.95 ₹46,263.96 | 664.71 ₹43,073.21 | 500 ₹32,400 | 642.4 ₹41,627.52 |
| 2.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018) | 7.29 | Cum | 1,798.1 ₹13,108.15 | 1,674.1 ₹12,204.19 | 1,100 ₹8,019 | 1,617.91 ₹11,794.56 |
| 3.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone In floor ( Sl No.- 2a of GMSOR 2018 ) | 5.35 | Cum | 6,332.43 ₹33,878.50 | 5,895.74 ₹31,542.21 | 3,700 ₹19,795 | 5,697.85 ₹30,483.50 |
| 4.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone in roof ( Sl No.- 2a of GMSOR 2018 ) | 3.56 | Cum | 6,332.44 ₹22,543.49 | 5,895.74 ₹20,988.83 | 3,700 ₹13,172 | 5,697.85 ₹20,284.35 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl No.- 12 of GMSOR 2018 ) | 89.1 | Cum | 6,961.77 ₹6.2 L | 6,481.63 ₹5.8 L | 5,200 ₹4.6 L | 6,264.07 ₹5.6 L |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 ) | 486 | Sqm | 426.56 ₹2.1 L | 397.14 ₹1.9 L | 400 ₹1.9 L | 383.81 ₹1.9 L |
| 7.00 | 12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018) | 486 | Sqm | 401.97 ₹2.0 L | 374.25 ₹1.8 L | 380 ₹1.8 L | 361.69 ₹1.8 L |
| 8.00 | Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018) | 146.57 | Cum | 274.55 ₹40,240.79 | 255.62 ₹37,466.22 | 220 ₹32,245.40 | 247.04 ₹36,208.65 |
| 9.00 | Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018) | 146.57 | Cum | 199.77 ₹29,280.29 | 186.01 ₹27,263.49 | 160 ₹23,451.20 | 179.77 ₹26,348.89 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
23 Mar 2026, 5:00 pmClosed
GM (Oprn.), Baikunthpur Area
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 18 Nos. Ventilation Stopping at 21LE proposed LHCM Panel of Seam - II in Pandavpara Mine.
2026_SECL_356380_1
SECL/BKP/GMO/25-26/PP/eT/34 Dated 11.03.2026
Open Tender
Civil Works - Others
180 days
Pandavpara Mine
Please refer Tender document
4 documents required · 4 mandatory
₹22,000
9 May 2026
12 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
13 Mar 2026 - 16 Mar 2026
Description of Work
Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 )
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018)
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone In floor ( Sl No.- 2a of GMSOR 2018 )
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone in roof ( Sl No.- 2a of GMSOR 2018 )
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl No.- 12 of GMSOR 2018 )
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 )
12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018)
Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018)
Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018)
Lead for transportation of materials for every 15 mtr or part by head load for 50 m. (10 Leads) ( Sl No.- 7 of GMSOR 2018)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 1.47 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_369234.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid