| 1 | L1₹13.2 LAccepted-AOC M 1154 WARD NO 07 KAPILDHARA COLONY POST BIJURI DISTT ANUPPUR M P PIN 484440 | BIJURI | ANUPPUR | MADHYA PRADESH | 484440 | ₹13.2 L Quoted ₹11.2 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹12.7 L+₹1.5 L (13.3%)Rejected-Finance | ₹12.7 L+₹1.5 L (13.3%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹13.1 L+₹1.9 L (17.2%)Rejected-Finance | ₹13.1 L+₹1.9 L (17.2%) | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹14.1 L+₹2.9 L (25.9%)Rejected-Finance | ₹14.1 L+₹2.9 L (25.9%) | L4 | Rejected-Finance L4 bidder |
| Sl No | Description | Qty | Unit | ranvijay singh L4 | NAIMUDDIN ANSARI L3 | service idea L1 | VIVEK KUMAR L2 |
|---|---|---|---|---|---|---|---|
| 1.00Description of Work | |||||||
| 1.01 | Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 ) | 64.8 | Cum | 713.95 ₹46,263.96 | 664.71 ₹43,073.21 | 500 ₹32,400 Lowest | 642.4 ₹41,627.52 |
| 2.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018) | 7.29 | Cum | 1,798.1 ₹13,108.15 | 1,674.1 ₹12,204.19 | 1,100 ₹8,019 Lowest | 1,617.91 ₹11,794.56 |
| 3.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone In floor ( Sl No.- 2a of GMSOR 2018 ) | 5.35 | Cum | 6,332.43 ₹33,878.5 | 5,895.74 ₹31,542.21 | 3,700 ₹19,795 Lowest | 5,697.85 ₹30,483.5 |
| 4.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone in roof ( Sl No.- 2a of GMSOR 2018 ) | 3.56 | Cum | 6,332.44 ₹22,543.49 | 5,895.74 ₹20,988.83 | 3,700 ₹13,172 Lowest | 5,697.85 ₹20,284.35 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl No.- 12 of GMSOR 2018 ) | 89.1 | Cum | 6,961.77 ₹6,20,293.71 | 6,481.63 ₹5,77,513.23 | 5,200 ₹4,63,320 Lowest | 6,264.07 ₹5,58,128.64 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 ) | 486 | Sqm | 426.56 ₹2,07,308.16 | 397.14 ₹1,93,010.04 | 400 ₹1,94,400 | 383.81 ₹1,86,531.66 Lowest |
| 7.00 | 12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018) | 486 | Sqm | 401.97 ₹1,95,357.42 | 374.25 ₹1,81,885.5 | 380 ₹1,84,680 | 361.69 ₹1,75,781.34 Lowest |
| 8.00 | Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018) | 146.57 | Cum | 274.55 ₹40,240.79 | 255.62 ₹37,466.22 | 220 ₹32,245.4 Lowest | 247.04 ₹36,208.65 |
| 9.00 | Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018) | 146.57 | Cum | 199.77 ₹29,280.29 | 186.01 ₹27,263.49 | 160 ₹23,451.2 Lowest | 179.77 ₹26,348.89 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
23 Mar 2026, 5:00 pmClosed
GM (Oprn.), Baikunthpur Area
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 18 Nos. Ventilation Stopping at 21LE proposed LHCM Panel of Seam - II in Pandavpara Mine.
2026_SECL_356380_1
SECL/BKP/GMO/25-26/PP/eT/34 Dated 11.03.2026
Open Tender
Civil Works - Others
Item Rate
180 days
Pandavpara Mine
Please refer Tender document
4 documents required · 4 mandatory
₹22,000
9 May 2026
12 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
13 Mar 2026 - 16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of Work | |||||
| 1.01 | Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 ) | 64.8 | Cum | 756.3 | ₹49,008.24 |
| 2 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018) | 7.29 | Cum | 1,904.77 | ₹13,885.77 |
| 3 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone In floor ( Sl No.- 2a of GMSOR 2018 ) | 5.35 | Cum | 6,708.09 | ₹35,888.28 |
| 4 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone in roof ( Sl No.- 2a of GMSOR 2018 ) | 3.56 | Cum | 6,708.09 | ₹23,880.8 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ( Sl No.- 12 of GMSOR 2018 ) | 89.1 | Cum | 7,374.71 | ₹6,57,086.66 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 ) | 486 | Sqm | 451.87 | ₹2,19,608.82 |
| 7 | 12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018) | 486 | Sqm | 425.82 | ₹2,06,948.52 |
| 8 | Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018) | 146.57 | Cum | 290.84 | ₹42,628.42 |
| 9 | Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018) | 146.57 | Cum | 211.64 | ₹31,020.07 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 1.47 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_369234.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .