Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.0 LAdmitted-Finance | -13.00% | ₹34.0 L | L1 | Admitted-Finance |
| 2 | L2₹34.7 L+₹73,755.17 (2.17%)Admitted-Finance | -11.11% | ₹34.7 L+₹73,755.17 (2.17%) | L2 | Admitted-Finance |
| 3 | L3₹38.8 L+₹4.9 L (14.4%)Admitted-Finance 00 PASHU CHIKITSALAYA PAKHRAULI UNNAMED ROAD PAKHARAULI SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | -0.50% | ₹38.8 L+₹4.9 L (14.4%) | L3 | Admitted-Finance |
Tender Value
₹39.0 L
EMD Value
₹78,060
Closing Date
3 Aug 2026, 6:00 pmClosed
EE PWD DIV. LAKHERI
EE PWD DIV. LAKHERI
Development of infrastructure at tourist spot Stepwell Development 2 Bundi near Kamleshwar Mahadev, Nawalpura
2026_CEPWD_578847_2
EE PWD DIV. LAKHERI NITNO-04/2026-27
Open Tender
Civil Works
Percentage
120 days
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV. LAKHERI
₹78,060
Yes
5 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
3 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 106.37 | Cum. | - | - |
| 2 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20mm thick . | 479.6 | Sqm | - | - |
| 3 | Stone slab roofing on ground floor with fine grained stone slab from approved quarry including filling of joints of parapet and slab on both sides in cement sand mortar 1:4, with ceiling pointing in cement sand mortar 1 : 3 complete as per specification and instruction of Engineer In Charge | 439.3 | Sqm. | - | - |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix ( with graded stone aggregate 20mm nominal size) | 102.07 | Cum. | - | - |
| 5 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide | 3,014 | Kg | - | - |
| 6 | Emptying of Septic tank ,Soakage well etc. by disposing or sludge upto 5 Km. lead & taking out sewage including cleaning of site. | 337.5 | Cum | - | - |
| 7 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 249.83 | Cum. | - | - |
| 8 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 242.6 | Cum. | - | - |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Walls (any thickness) including attached pilasters,buttresses plinth and string course | 230.1 | Sqm | - | - |
| 10 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.
('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) | 2,736.98 | K.g. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1028703.xls
BOQ • 0.30 MB
DATE-CORRIGENDUM01.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .