Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹2.5 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹2.5 LRejected-Finance AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹2.5 L | L2 | Rejected-Finance DUE TO HIGHER RATE QUOTED |
| 3 | L3₹2.6 LRejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹2.6 L | L3 | Rejected-Finance DUE TO HIGHER RATE QUOTED |
| Sl No | Description | Qty | Unit | SHRI DURGA AUTOMOBILES L1 | S K AUTOMOBILE L2 | Q-TECH SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00Repairing of Hyva. | ||||||
| 1.01 | Jobs to be done: 1.Both side footrest cutting, welding, repairing and straightening.2.Both side door removing, damage portion denting, welding, repairing with door lock and handle changing and fitting.3.Both side cabin wheel mudguard cutting, welding, repairing, damage sheet replacement and fitting.4.Front bumper cutting, welding and repairing, straightening.5. Front both side H.L. Show mudguard cutting, denting, welding, repairing, damage sheet replacement.6.Rear back mudguard cutting, welding, repairing, straightening and damage sheet replacement.7.Rear and front footrest rubber changing, fitting, with bolt nutt cutting, changing and fitting. 8.Complete diesel tank damage portion MS Sheet cutting, new MS Sheet changing, welding, denting, straightening, repairing and fitting.09.Diesel tank bracket cutting, new bracket fitting, welding and repairing.10.Driver and co-driver sheet frame M S Sheet cutting, rusted sheet replacement. 11.Complete vehicle painting.12.Complete letter writing with logo and number plate.13.Both side cabin core mudguard cutting and changing, fitting with bolt nut cutting, changing and fitting.14.Both side cabin door glass with machine removing, machine greasing, fitting and setting.15. Both side Cabin door quotter glass with rubber, door pad removing, changing and fitting. 16. Wiper motor complete removing, overhauling with arm and blade replacement. 17. Battery box cutting, welding, repairing and refitting with cover making (slider type). 18. Both side king pin overhauling, raimring and fitting. 19. King pin axle beam complete dismantling, fitting with all accessories removing, fitting from chassis. 20. Both side king pin axle beam raimring, facing king pin over size. 21. Both side king pin spindle bush fitting, raimring and fitting. 22. Front wheel spindle shaft welding, making, repairing bearing size by steel electrode. 23. Front wheel hub drum refacing. 24. Rear complete differential overhauling, differential body tail bearing portion repairing for machining, Tail pinion flange new socket making through machining. 25. Both side cabin mounting removing, changing and fitting. 26. Complete steering system dismantling, overhauling and required materials changing & fitting. 27. All head light, back light, Ignition switch, horn etc. to be replaced. 28. Load body back dalla Tail gate Pin, bush removing, changing & fitting. 29. Brake tradle valve removing, overhauling and fitting. 30. Air control valve removing, overhauling and fitting. 31. Air relay valve removing, overhauling and fitting.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 2,51,100 ₹2.5 L | 2,53,200 ₹2.5 L | 2,55,500 ₹2.6 L |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.5 L
EMD Value
₹3,140
Closing Date
23 May 2026, 5:00 pmClosed
Incharge, AAW Godhur
Office of the GM, Kusunda Area
Repair work of Tata Hyva Reg.No-JH10AF3532 of Regional Store, Kusunda Area
2026_BCCL_359387_1
BCCL/KA-VI/TRPT/E-NIT/26-27/04
Open Tender
Miscellaneous Works
20 days
Regional Store, Godhur
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,140
Yes
27 May 2026
11 May 2026
25 May 2026
11 May 2026
23 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Repairing of Hyva. | ||||||
| 1.01 | Jobs to be done: 1.Both side footrest cutting, welding, repairing and straightening.2.Both side door removing, damage portion denting, welding, repairing with door lock and handle changing and fitting.3.Both side cabin wheel mudguard cutting, welding, repairing, damage sheet replacement and fitting.4.Front bumper cutting, welding and repairing, straightening.5. Front both side H.L. Show mudguard cutting, denting, welding, repairing, damage sheet replacement.6.Rear back mudguard cutting, welding, repairing, straightening and damage sheet replacement.7.Rear and front footrest rubber changing, fitting, with bolt nutt cutting, changing and fitting. 8.Complete diesel tank damage portion MS Sheet cutting, new MS Sheet changing, welding, denting, straightening, repairing and fitting.09.Diesel tank bracket cutting, new bracket fitting, welding and repairing.10.Driver and co-driver sheet frame M S Sheet cutting, rusted sheet replacement. 11.Complete vehicle painting.12.Complete letter writing with logo and number plate.13.Both side cabin core mudguard cutting and changing, fitting with bolt nut cutting, changing and fitting.14.Both side cabin door glass with machine removing, machine greasing, fitting and setting.15. Both side Cabin door quotter glass with rubber, door pad removing, changing and fitting. 16. Wiper motor complete removing, overhauling with arm and blade replacement. 17. Battery box cutting, welding, repairing and refitting with cover making (slider type). 18. Both side king pin overhauling, raimring and fitting. 19. King pin axle beam complete dismantling, fitting with all accessories removing, fitting from chassis. 20. Both side king pin axle beam raimring, facing king pin over size. 21. Both side king pin spindle bush fitting, raimring and fitting. 22. Front wheel spindle shaft welding, making, repairing bearing size by steel electrode. 23. Front wheel hub drum refacing. 24. Rear complete differential overhauling, differential body tail bearing portion repairing for machining, Tail pinion flange new socket making through machining. 25. Both side cabin mounting removing, changing and fitting. 26. Complete steering system dismantling, overhauling and required materials changing & fitting. 27. All head light, back light, Ignition switch, horn etc. to be replaced. 28. Load body back dalla Tail gate Pin, bush removing, changing & fitting. 29. Brake tradle valve removing, overhauling and fitting. 30. Air control valve removing, overhauling and fitting. 31. Air relay valve removing, overhauling and fitting.
Repairing work should be completed with all required materials and manpower. | - | Nos | 2,51,150 | - | BI01010001010000000000000515BI0100001113 |
| 2Total impact of GST for the purpose of CTC | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_372256.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_372256.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid