Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.8 LAdmitted-Finance AT MUKTAPUR P O GHUTUR DIST KEONJHAR PIN 758002 | KEONJHAR | ODISHA | 758002 | -29.07% | ₹46.8 L | L1 | Admitted-Finance |
| 2 | L2₹50.8 L+₹4.0 L (8.54%)Admitted-Finance AT PO BADAPADANA PS RAMACHANDRAPUR DIST KEONJHAR PIN 758021 | RAMACHANDRAPUR | KEONJHAR | ODISHA | 758021 | -23.01% | ₹50.8 L+₹4.0 L (8.54%) | L2 | Admitted-Finance |
| 3 | L3₹54.6 L+₹7.7 L (16.6%)Admitted-Finance | -17.33% | ₹54.6 L+₹7.7 L (16.6%) | L3 | Admitted-Finance |
| 4 | L4₹56.1 L+₹9.3 L (19.8%)Admitted-Finance AT PO CHAMAKPUR PS CHAMPUA DIST KEONJHAR PIN 758041 | CHAMAKPUR | KEONJHAR | ODISHA | 758041 | -15.00% | ₹56.1 L+₹9.3 L (19.8%) | L4 | Admitted-Finance |
| 5 | L5₹56.1 L+₹9.3 L (19.9%)Admitted-Finance | -14.99% | ₹56.1 L+₹9.3 L (19.9%) | L5 | Admitted-Finance |
Tender Value
₹66.0 L
EMD Value
₹66,050
Closing Date
7 Jul 2026, 5:00 pmClosed
SE Kanupur Reh. C and B Division Basudevpur
O/o SE Kanupur Reh. C and B Division Basudevpur
Extension of office building for Chief Construction Engineer, Kanupur Irrigation Project at Basudevpur,Keonjhar
2026_KPRIP_132648_1
SE,KRC AND BD-09(2026-27)
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
SE Kanupur Reh. C and B Division Basudevpur
Please refer tender documents
3 documents required · 3 mandatory
₹10,000
₹66,050
Yes
31 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in Disintegrated rock including dressing and leveling the bed upto the required depth and depositing the excavated materials away from the site with all leads and lifts with shoring and shuttering with working pump if required etc. complete and as directed by the Engineer-in-charge. | 1 | cum | 282.9 | ₹282.62 |
| 2 | Filling foundation & plinth with excavated earth with well rammed including all cost of t&p, labour charges etc. complete as per the direction of the Engineer-in-charge. | 1 | cum | 275.6 | ₹275.32 |
| 3 | Supplying and filling in foundation and plinth with sand including watering ramming cost, conveyance, royality of all materials and cost of labour with T& P required for the work etc. complete ( measurement will be taken in finished compacted section only) and as directed by the Engineer-in-charge. | - | cum | 1,021.5 | - |
| 4 | Cement concrete ( 1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal (free from weathered skinned & debris etc.) of approved quality and from approved quarry including lowering laying ramming concrete watering and curing etc. complete to required levels including cost and conveyance royalities of all materials and cost of all labour with T& P required for the work complete and as directed by the Engineer-in-charge . | - | cum | 6,262.3 | - |
| 5 | R.C.C/C.C work M-20 using 20mm size down graded black hard crusher broken / granite chips 20mm size not to exceed 60%(free from weathered skinned and debris) etc. including hoisting, lowering, laying and compacting concrete using vibrator watering , and curing for 28days including cost, conveyance, royalities of all materials & cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of m.s Rod or Tor steel and binding wires and labour charges for bending binding and tying the grill etc. complete and as directed by the Engineer-in-charge. | 1 | cum | 6,344.2 | ₹6,337.86 |
| 6 | Rigid & smooth centrering & shuttering for R.C.C. works including false work & dismentaling, cleaning the same after casting and after the minimum allowable time lapses as per I.S.Specification including cost & carriage of all materials to the site of work etc.complete as per the direction of the Engineer in charge. Column Base & Plinth beam | 1 | Sqm | 250.6 | ₹250.35 |
| 7 | b) Column & Beam, | 1 | sqm | 1,222.1 | ₹1,220.88 |
| 8 | c) Lintel, | 1 | sqm | 579.7 | ₹579.12 |
| 9 | d) Roof Slab & Chhaja | - | sqm | 772 | - |
| 10 | e) Stair case, | 1 | sqm | 1,070.4 | ₹1,069.33 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.92 MB
TsOfficebuilding.pdf
Tender Documents • 1.41 MB
BOQ_597479.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .