| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹125.6 CrAccepted-AOC CENTRAL ROAD EXTENTION TOWN PRATAPGARH AGARTALA WEST TRIPURA PIN 799001 | NA | NA | 799001 | ₹125.6 Cr Quoted ₹131.3 Cr | 1st | Accepted-AOC Being the 1st lowest |
| 2 | 2nd₹139.2 CrRejected-Finance 15 GANESH CHANDRA AVENUE 7TH FLOOR KOLKATA WEST BENGAL 700013 | KOLKATA | WEST BENGAL | 700013 | ₹139.2 Cr | 2nd | Rejected-Finance Being the 2nd lowest |
Tender Value
₹121.9 Cr
Closing Date
9 Apr 2024, 3:00 pmClosed
Executive Engineer, Bishramganj Div, PWD(RandB)
O/O the Executive Engineer, Bishramganj Division, PWD (RandB), Sepahijala District, Tripura.
Work under PM-DevINE Scheme i) Setting up of Intregrated Rehabitation Center for drug addicted at Bishramganj, Sepahijala District.
2024_CEPWD_47550_1
CE/B/PWD/ACE/PU/DNIeT/69/23-24
Open Tender
Composite Works
830 days
Bishramganj
Please refer Tender documents.
4 documents required · 4 mandatory
₹25,000
Exempted
O/o the Addl. Chief Engineer,Project Unit, PWD(B)
16 Jan 2025
23 Feb 2024
9 Apr 2024
23 Feb 2024
9 Apr 2024
23 Feb 2024
23 Feb 2024 - 1 Mar 2024
5 Mar 2024
INTEGRATED REHABILITATION CENTRE
Planning, Designing, and Construction on EPC Basis comprising of Staff Quarters Type - II by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Staff Quarters Type - III by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Administrative Block (Ground Floor) with foundation provision for (G+2-Storied) by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of 200 Bedded IRCA Building (G+5-Storied) by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Health Centre by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Meditation Centre (1 No.) by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Cottage (1 Nos.) as Guest House by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Pet House by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Sentry Box (4 Nos.) by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Watch Tower by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis comprising of Indoor Sports Building by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Staff Quarters Type - IIl by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Staff Quarters Type - III by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Administrative Block (Ground Floor) with foundation provision for (G+2-Storied) by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for 200 Bedded IRCA Building (G+5-Storied) by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Health Centre by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Meditation Centre (1 No.) by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Cottage (1 Nos.) as Guest House by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Pet House by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Sentry Box (4 Nos.) by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Watch Tower by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and Construction on EPC Basis of High side MEP and external MEP Infrastructure development works for Indoor Sports Building by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing and construction of Civil External development works for whole Project area as per approval of the Engineer- in-Charge
M.P.KHAITAN (BID ID -138889)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid