| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC | 1 | Accepted-AOC Lowes | |
| 2 | 2₹10.7 L+₹85,919.41 (8.75%)Rejected-AOC | 2 | Rejected-AOC Second |
| Sl No | Description | Qty | Unit | BINUKUTTAN G L2 | UNNI M L1 |
|---|---|---|---|---|---|
| 1.00FERN | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 432 | sqm | 18.19 ₹7,858.08 | 15.97 ₹6,899.04 Lowest |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 5 | each | 379.56 ₹1,897.8 | 333.25 ₹1,666.25 Lowest |
| 1.00 | 15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar | 1.31 | cum | 880.26 ₹1,149.62 | 772.86 ₹1,009.36 Lowest |
| 1.00 | 14.82:Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | 2 | no | 138 ₹276 | 121.91 ₹243.82 Lowest |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 139.28 | sqm | 75.87 ₹10,567.55 | 66.61 ₹9,277.77 Lowest |
| 1.01 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 4.22 | cum | 757 ₹3,193.78 | 665.1 ₹2,806.06 Lowest |
| 1.01 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 3.38 | cum | 6,174 ₹20,837.25 | 5,421.07 ₹18,296.11 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.83 | cum | 8,343 ₹31,911.98 | 7,325.54 ₹28,020.19 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 4.64 | cum | 700 ₹3,248 | 640.4 ₹2,971.46 Lowest |
Tender Value
₹11.2 L
EMD Value
₹27,964
Closing Date
5 Mar 2026, 11:00 amClosed
Assistant executive Engineerhead works sub Divisio
Head works Subdivision Malampuzha Irrigation
Fern Cottage is an old building located on the left bank of the Malampuzha river , downstream of Malampuzha dam and was commonly rented out to tourists and guests for various occasions
2026_Irrig_837406_1
IRR/PI/TR/4176/2024_5_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Malampuzha
Please prefer Tender document
4 documents required · 4 mandatory
₹2,760
₹27,964
Yes
24 Mar 2026
18 Feb 2026
6 Mar 2026
18 Feb 2026
5 Mar 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FERN | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 432 | sqm | - | - |
| 1.002 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 5 | each | - | - |
| 1.003 | 15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar | 1.31 | cum | - | - |
| 1.004 | 14.82:Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | 2 | no | - | - |
| 1.005 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 139.29 | sqm | - | - |
| 1.006 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 4.22 | cum | - | - |
| 1.007 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 3.38 | cum | - | - |
| 1.008 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.83 | cum | - | - |
| 1.009 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 4.64 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1410226.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1410226.xls
BOQ • 0.35 MB
BD.pdf
Tender Documents • 1.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .