Tender Value
₹6.0 L
EMD Value
₹15,012
Closing Date
2 Mar 2026, 5:00 pmClosed
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
Reconductoring with HT ABC From Thirumala to Thulavila under Electrical Section, Nemom of Electrical Division, Neyyattinkara under Electrical Circle, Kattakada
2026_KSEB_838297_1
EE/PMU(KTDA)/ET-32/2025-26 dated 20.02.2026
Open Tender
Electrical Works
Percentage
120 days
Nemom
6 documents required · 6 mandatory
₹1,416
₹15,012
14 Apr 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
20 Feb 2026 - 26 Feb 2026
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers.
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
Drilling hole of various sizes on existing Channel/Cross Arm.
Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe.
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles
Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable
Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable
Erection of suspension clamp for 11KV ABC of any size
Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
Fitting one No. LT lightning arrestor in LT OH line and giving connections excluding earthing.
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
stage.html
html • 0.04 MB
techsummary_1412420.pdf
finsummary_1412420.pdf
aoc.pdf
finance_1412420.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BID.pdf
Tender Documents • 0.55 MB
BOQ_1412420.xls
BOQ • 0.35 MB
datecorri.pdf
PDF • 0.27 MB
Corrigendum2.pdf
PDF • 0.27 MB
corri1.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .