Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90,705.18Accepted-AOC AT RELIGARA NEAR TREKKAR STAND PO RELIGARA DIST HAZARIBAGH PIN 829124 | HAZARIBAGH | HAZARIBAGH | JHARKHAND | 829124 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹1.3 L+₹55,981.20 (72.8%)Rejected-Finance AT SUNDER NAGAR PO BHURKUNDA DT RAMGARH JHARKHAND 829106 | BHURKUNDA | RAMGARH | JHARKHAND | 829106 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹1.8 L+₹1.1 L (140.6%)Rejected-Finance ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹1.9 L+₹1.1 L (146.1%)Rejected-Finance AT MANMOHAN NAGAR SANDI RAMGARH P O RAMGARH DIST RAMGARH | RAMGARH | RAMGARH | JHARKHAND | 829116 | L4 | Rejected-Finance L4 bidder | |
| 5 | L5₹1.9 L+₹1.2 L (151.4%)Rejected-Finance AT PO KEDLA RAMGARH JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | 825325 | L5 | Rejected-Finance L5 bidder |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
11 Aug 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PE EnM Sirka Colliery
PO Office Sirka Colliery
Repair, Maintenance, Dismantling, Shifting, erection of O/H Lines as and when required basis during monsoon at Sirka OCP.
2022_CCL_251861_1
PE(EnM)/Sirka/e-NIT/22-23/01
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Sirka Colliery
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,500
24 Sept 2022
30 Jul 2022
12 Aug 2022
1 Aug 2022
11 Aug 2022
1 Aug 2022
1 Aug 2022 - 8 Aug 2022
Amount
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. (Above 8.0 metre and upto 11.0 metre)
Supplying and erection of stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, bow tightener, 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for two 11 KV over head line conductors complete with 50 mm X 50 mm X 6 mm (angle iron bracket welded to the channel iron and complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required.
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) pole top bracket/ cross arm for single 11 KV over head line conductor complete with 50 mm X 6mm flat iron clamp, bolts, nuts and washers including drilling holes for insulator pins, bolts and nuts etc and painting with primer and finish paint as required.
Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) double pole cross arm for three wire 11KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required.
Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole for 11/22/33 KV as required.
Supplying and erection of 11 KV pin insulator complete with large steel head G.I. pin, nuts, washers etc. as required.
Supplying and erection of 11 KV disc insulator for 11 KV over head lines with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required.
Erection of disc/ pin insulator for 11 KV over head lines as required.
Erection of ACSR conductor of 7/3.35 mm to 7/4.00 diameter and above including binding etc. as required.
Erection of double pole 3 wire cross arm for 11KV/ 22KV/ 33 KV over head lines as required.
Supply of 8 SWG GI Wire
Erection of G.I. Wire No. 8 SWG including binding etc. as required
Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required.
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
Total impact of GST for the purpose of CTC
M/S B.N. PANDEY
M/S VAISHALI ELECTRIC COMPANY
M/s Achal Electricals
M/S MANTOSH KUMAR
stage.html
html • 0.05 MB
techsummary_260262.pdf
PDF • 0.23 MB
finsummary_260262.pdf
PDF • 0.23 MB
LOA.pdf
PDF • 0.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .