| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹3.5 L+₹43,470.54 (14.0%)Rejected-AOC | L2 | Rejected-AOC Second Lowest |
Tender Value
₹3.3 L
EMD Value
₹8,359
Closing Date
17 Jun 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE
O/o the AEE, KLC subdivision No 1, TVPM
KLC 3 MLA Hostel Premonsoon works 2023 Clearing side drain branch cutting clearing manhloes drainage line etc and other allied works at MLA hostel General Civil Work
2023_PWD_580969_1
DB1/PWD/BLDG/TR/5459/2023
Open Tender
Civil Works - Buildings
Item Rate
90 days
Secretariate
Please refer Tender documents.
9 documents required · 9 mandatory
₹740
Yes
₹8,359
Yes
4 Aug 2023
9 Jun 2023
20 Jun 2023
9 Jun 2023
17 Jun 2023
9 Jun 2023
Amount
Detailed Estimate
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD276048/2022-2023:Clearing the blocked up and not working sewer manhole of size 0.60x0.60x1.20m including disposal of black earth etc.
OD276049/2022-2023:Extra labour for cleaning manhole beyond 1.20 m depth.
OD276050/2022-2023:Clearing the blocked up silt pit, gully trap etc. and put up the same in working order etc. as per the direction of engineer in charge.
OD276051/2022-2023:Clearing the blocked up sewage line using sewage clearing rod and put up the same in working order etc.
OD276052/2022-2023:Removing slab from open drains and cleaning of drains including removal of waste, black earth etc from drains including labour etc. and refixing slab in position etc. complete as per the direction of Engineer in charge.
OD276053/2022-2023:Labour engaged for cleaning the yard, common toilet and roof top, sunshades etc. with all necessary accessories including ladder, rope etc. required for cleaning works. as per the direction of Engineer in charge.
OD276054/2022-2023:Applying acid washing on floor ,wall tiles inncluding material,labour harges ect complete.
OD276055/2022-2023:Labour engaged for plumbing and other petty works during the time of waste removal etc. as per the direction of Engineer in charge
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
OD276095/2022-2023:Uprooting banyan trees from the walls and terrace of buildings by engaging labours and necessary tools like chisel, ladder etc. complete as per the direction of Engineer in charge.
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD276193/2022-2023:Disposal of solid waste and debris within 10 km from site cleared including all cost of labour charges.
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
K Gopakumar
Bidder Name
K Gopakumar
A. NISAMUDEEN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_857866.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .