Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹33.7 Cr+₹3.1 Cr (10.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹33.8 Cr+₹3.1 Cr (10.2%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vishal Infrastructure Ltd L3 | CH.VEERARAGHAVULU CONSTRUCTION PVT LTD L2 | INTER CONTINENTAL CONSTRUCTIONS (INDIA) LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00SUB HEAD-A -BUILDING INCLUDING INTERNAL SERVICES | ||||||
| 2.00SUB HEAD-I - EARTH WORK & ANTI-TERMITE TREATMENT | ||||||
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | ||||||
| 4.00 | All kinds of soil | 5 | Cum | 168 ₹840 Lowest | 300 ₹1,500 | 255 ₹1,275 |
| 5.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 6.00 | All kinds of soil. | 2,894 | Cum | 154 ₹4,45,676 Lowest | 310 ₹8,97,140 | 255 ₹7,37,970 |
| 7.00Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. | ||||||
| 8.00 | Ordinary rock | 362 | Cum | 421 ₹1,52,402 Lowest | 1,323 ₹4,78,926 | 975 ₹3,52,950 |
| 9.00 | Hard rock (blasting prohibited) | 362 | Cum | 1,263 ₹4,57,206 Lowest | 2,383 ₹8,62,646 | 2,100 ₹7,60,200 |
| 10.00 | Credit of Excavated Hard Rock obtained from above | 362 | Cum | 100 ₹-36,200 Lowest | 600 ₹-2,17,200 | 550 ₹-1,99,100 |
Tender Value
₹25.5 Cr
EMD Value
₹35.5 L
Closing Date
25 Apr 2022, 3:00 pmClosed
CCE
CCE RND S AKBAR ROAD SECUNDERABAD
PROVISION OF CIVIL WORKS FOR SHORE INTEGRATION FACILITY SIF FOR PROGRAMME ICS AT NPOL, KOCHI
2022_DRDO_678105_1
83639/CIV/SIF-NPOL/CON
Limited
Civil Works
Item Rate
730 days
NPOL KOCHI
AS PER NIT
2 documents required · 2 mandatory
₹10,000
Yes
CCE RND S SECUNDERABAD
₹35.5 L
Yes
12 May 2022
10 Mar 2022
26 Apr 2022
10 Mar 2022
25 Apr 2022
23 Mar 2022
11 Mar 2022 - 21 Mar 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUB HEAD-A -BUILDING INCLUDING INTERNAL SERVICES | - | - | - | - |
| 2 | SUB HEAD-I - EARTH WORK & ANTI-TERMITE TREATMENT | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | - | - | - | - |
| 4 | All kinds of soil | 5 | Cum | - | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 6 | All kinds of soil. | 2,894 | Cum | - | - |
| 7 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. | - | - | - | - |
| 8 | Ordinary rock | 362 | Cum | - | - |
| 9 | Hard rock (blasting prohibited) | 362 | Cum | - | - |
| 10 | Credit of Excavated Hard Rock obtained from above | 362 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Tendernotice_2.pdf
PDF • 0.58 MB
Tendernotice_3.pdf
PDF • 0.51 MB
Tendernotice_4.pdf
PDF • 0.61 MB
Tendernotice_5.pdf
PDF • 0.80 MB
Tendernotice_6.pdf
PDF • 2.54 MB
Tendernotice_7.pdf
PDF • 0.32 MB
Tendernotice_8.pdf
PDF • 0.35 MB
Tendernotice_9.pdf
PDF • 0.29 MB
Tendernotice_10.pdf
PDF • 1.28 MB
BOQ_713631.xls
BOQ • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .